Loading...
PCR2022024 Muskego BiotechRESOLUTION #P.C. 024-2022 APPROVAL OF A BUILDING SITE AND OPERATION PLAN FOR MUSKEGO BIOTECH BUILDING, LLC FOR THE PROPERTY LOCATED IN THE NE % OF SECTION 3 (COMMERCE DRIVE / TAX KEY NO. 2169.993.009) WHEREAS, Plans were submitted by Muskego Biotech Building, LLC. for approval of a Building, Site and Operation Plan for a property located in the NE '/4 of Section 3 (Commerce Drive / Tax Key No. 2169.993.009), and WHEREAS, The property is zoned BP-3, Business Park District, and WHEREAS, The 2020 Plan Depicts the area for Business Park uses and the proposal is consistent with the plan, and WHEREAS, The submittal includes site plans, grading/utility plans, landscape plan, building elevations, floor plans, colored renderings, and a photometric plan, and WHEREAS, The petitioner requests approvals for a new 79,639 SF (54,330 SF footprint and a 25,309 SF mezzanine) multi -tenant office/light manufacturing/machining and assembly building within the City's Commerce Center West development along Commerce Drive west of Moorland Road, and WHEREAS, Two tenants have been identified for the new buidling as Breakthrough Strategies LLC (consuming approx. 3,600 SF) and Biocut Systems LLC (consuming approx. 34,750 SF) with the remaining 37,250 SF remaining open for a third tenant, and WHEREAS, The building meets the requirements of the BP-3 zoning district per the following: • Front setbacks of 40' (Shown as 58.1 east, 50.1' north and 64.4' west) • Side/Rear setbacks of 20' • Height maximum of 40' (Shown as 31') • Floor Area Ratio maximum of 80% (Shown as 24.6%), and WHEREAS, The BP-3 district requires 33% of the total lot area to remain as open space and the current proposal is listed as 56%, and WHEREAS, The property is governed by the City's General Design Guide and the City's Business Park Design Guide, and WHEREAS, The City's General Design Guide main items are in relation to providing four-sided architecture with at least 50% masonry products and the proposal meets these principles, and WHEREAS, The City's Business Park Design Guide main items are in relation to Site Layout & Lot Coverage, Building Arrangement/Massing, Building Viewsheds, Architecture, Building Materials, Landscaping, Signs, Utilities, Lighting, Parking, Loading Areas, and Storage Areas and the proposal meets these principles, and WHEREAS, The building is proposed to have similar architecture to the other large business office buildings that the city has approved in the Commerce Center East and West in the past being mainly built with prefabbed concrete panels that have the various colors, banding, and architectural elements built in, and WHEREAS, The proposed building shows that street -facing sides (west, north and east) fagades will have more of an office look while incorporating banding of colors on all elevations, which helps provides more of a four -side architectural appearance, and WHEREAS, The front elevation (northern corner) is also bumped out with a wider white outline providing for some varying depth and creating a pronounced entry feature containing a large expanse of glass, and WHEREAS, The colors of this building include a very modern pallet with light and medium grey colors in addition to a charcoal and white, and WHEREAS, The site will be accessed from two ingress/egress locations along Commerce Drive with a loop around the building for access, and WHEREAS, The site plan shows 145 parking stalls around the building including five ADA compliant van spaces, and WHEREAS, The zoning code states one (1) parking space is needed for every 2 employees for industrial uses and one space for every 300 square feet of primary floor area and the ratios presented are similar to the other business buildings approved in the Commerce Center development, and WHEREAS, The parking stalls are shown as 9'x18' in size, and WHEREAS, Landscape bump out islands in the parking lots are required for every ten (10) parking stalls as noted in the General Design Guide, and WHEREAS, There are a few landscape bump -out islands provided within the parking areas that are roughly every ten (10) parking stalls meeting the intent of the Design Guide, and WHEREAS, The site plans shows curb and gutter throughout the site, and WHEREAS, A single dumpster enclosure is proposed in the rear of the site near the loading docks, and WHEREAS, A landscape plan is included in the submittal which shows various landscaping throughout the site and will require further formal review by staff, and WHEREAS, There has not been any signage proposed or shown on the building or the site and all monument and wall signage will need permits from the City, and WHEREAS, A photometric plan and some basic lighting details have been submitted as part of the plan set showing a variety lights around the perimeter of the building and parking lots, and WHEREAS, The photometric plan appears to shows no light bleeding above city ordinance requirements, and WHEREAS, There is currently a stormwater management facility on the site that will be relocated toward the south and engineering reviews will take place to ensure that all MMSD/DNR requirements are met for the existing stormwater as well as the new stormwater to be captured from this new project, and WHEREAS, The site is served by municipal water and sanitary sewer services. THEREFORE BE IT RESOLVED, That the Plan Commission approves of a Building, Site, and Operation Plan for Muskego Biotech Building, LLC. for the property located in the NE '/ of Section 3 (Commerce Drive / Tax Key No. 2169.993.009). BE IT FURTHER RESOLVED, Once a tenant, or tenants, are known they may have to come back for Plan Commission operational approval which, may include a CUG in the event the tenants use is for warehouse and/or distribution in excess of 50,000 SF. BE IT FURTHER RESOLVED, Any business needs that involve outdoor storage, overnight outdoor parking, and/or outdoor display will need further Plan Commission approvals and no current approvals are being granted for outdoor display, storage and/or sales. BE IT FURTHER RESOLVED, Approval of a Business Registration for every tenant within this building is required by the City Planning Division before any tenant can use this building/site for any purpose. BE IT FURTHER RESOLVED, The color of any solid pedestrian doors and overhead doors need to match the color of the building. BE IT FURTHER RESOLVED, Additional details showing the dumpster enclosure being fully enclosed, construction materials of the enclosure and doors and the colors of the enclosure will be required for approval prior to issuance of a building permit. BE IT FURTHER RESOLVED, The Plan Commission allows the waiver of landscape islands for every ten (10) parking stalls due to the intent of the Design Guide being met. BE IT FURTHER RESOLVED, Vertical concrete curb and gutter must be installed throughout the entire parking area. BE IT FURTHER RESOLVED, At least 33% of the total lot area must remain as open space. BE IT FURTHER RESOLVED, Additional plantings should be identified along the foundations of the building. BE IT FURTHER RESOLVED, The landscape plan is subject to final Planning and City Forester approval before building permit issuance. BE IT FURTHER RESOLVED, All monument and wall signage will need separate permits from the City. BE IT FURTHER RESOLVED, All lighting must be zero degree tilt and full cut-off and the concrete bases for any pole lights cannot exceed 6 inches in height above grade. BE IT FURTHER RESOLVED, The height of any light poles cannot exceed the greater of either 15 feet or the average eve height of the building. BE IT FURTHER RESOLVED, No additional outdoor storage or display of products is allowed at any time on site. BE IT FURTHER RESOLVED, The site plan is subject to Fire Department approvals at the time of building permits and possible changes to the site plan may be required based upon the final Fire Department review. BE IT FURTHER RESOLVED, That any bollards, railings, ladders, louvers, vents, etc. must be painted to match the colors of the principal structure. BE IT FURTHER RESOLVED, Any new handicap signs be incorporated into bored bollards and/or be mounted into the ground. BE IT FURTHER RESOLVED, All roof top and ground mechanicals (including HVAC devices, electrical transformers, etc.) must be screened from view and/or incorporated into the design of the site/structure (screening, etc.) and must be approved by the Planning Division before the issuance of building permits and Business Registration approvals. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: March 1, 2022 Defeated: Deferred: Introduced: March 1, 2022 ATTEST: Adam Trzebiatowski AICP, Planning Manager