Loading...
CCR2022.067-Dedication of Publ Impr (DCEN)COMMON COUNCIL — CITY OF MUSKEGO RESOLUTION #067-2022 DEDICATION OF PUBLIC IMPROVEMENTS FOR THE DENOON COUNTRY ESTATES WHEREAS, DENOON COUNTRY ESTATES, hereafter called "DEVELOPER" has constructed public improvements in Maneys Way; including all storm sewer facilities and paving, including any and all equipment and appurtenances which may in any way be a part thereof or pertain to, in and for DENOON COUNTRY ESTATES; and WHEREAS, the DEVELOPER has completed the construction and installation of the following improvements: Pavin 1848 LF at $14.04/LF of 30" Mountable Curb and Gutter $25,945.92 880 TON at $19.50/TON of 1-1/4" Aggregate Base Course $17,160.00 780 TON at $19/TON of 3/4" Aggregate Base Course $14,820.00 770 TON at $85/TON of 4" of LT 12.5 MM Asphalt Binder $65,450.00 390 TON at $88/TON of 2" of LT 9.5 MM Asphalt Surface $34,320.00 Total — Paving $ 157,695.95 Storm Sewer 11 Each at $4,000/Each of Storm Inlets $44,000.00 2 Each at $4,000/Each of Storm Manholes $8,000.00 378 LF at $30.00/LF of 12" RCP Pipe w/ Backfill $10,200.00 1102 LF at $40.00/LF of 15" RCP Pipe w/ Backfill $44,040.00 133 LF at $44.00/LF of 18" RCP Pipe w/ Backfill $5,852.00 34 LF at $150.00/LF of 36" RCP Pipe w/ Backfill $5,100.00 1 LS at $1,600.00/LS of 36" Flared End Sections (No Grates) $1,600.00 2 Each at $1,200.00/Each of 18" Flared End Sections (No Grates) $2,400.00 1 Each at $1,100.00/Each of 15" Flared End Section $1,100.00 1171 LF at $22.00/LF of 6" PVC Sump Storm System (lateral, mainline, and cleanouts) $25,762.00 Total — Storm Sewer $148,054.00 and appurtenances (collectively called "IMPROVEMENTS") in accordance with the provision of Chapter 392 of the Municipal Code of the City of Muskego, hereafter called the "CITY", and the City Engineer has certified the systems' acceptability; and WHEREAS, it is the Developer's intent to, without charge to the CITY, unconditionally give, grant, convey and fully dedicate the IMPROVEMENTS to the CITY, free and clear of all encumbrances, and together with mains, conduits, pipes, plants, machinery, equipment and appurtenances which relate directly to the utilization of such IMPROVEMENTS; and WHEREAS, the DEVELOPER shall guarantee the public improvements to be dedicated against any defects due to faulty materials or workmanship which appear within a period of one (1) year from the date of dedication and shall pay for any damages resulting therefrom to the CITY property and shall indemnify the CITY against any claims, suits, or liabilities brought against the CITY at any time arising out of the alleged defects or other failure of this guarantee; and NOW, THEREFORE, BE IT RESOLVED That the Common Council of the City of Muskego, upon the recommendation of the Finance Committee, does hereby accept dedication and acceptance of the public improvements in and for DENOON COUNTRY ESTATES Development. DATED THIS 23RD DAY OF AUGUST 2022 SPONORED BY: FINANCE COMMITTEE This is to certify that this is a true and accurate copy of Resolution #067-2022 which was adopted by the Common Council of the City of Muskego. Sharon Mueller, City Clerk -Treasurer