Loading...
CCR2022.030-SWMA (Madyson Court)Madyson Court Development Storm Water Management Practice Document Number Maintenance Agreement BRYON HRIN, as "Owner" of the property described below, in accordance with Chapter 13 MMSD and the City of Muskego Code of Ordinances agrees to install and maintain storm water management practice(s) on the subject property in accordance with approved plans and Storm Water Management Plan conditions. The owner further agrees to the terms stated in this document to ensure that the storm water management practice(s) continues serving the intended functions in perpetuity. This Agreement includes the following exhibits: Exhibit A: Legal Description of the real estate for which this Agreement applies ("Property"). Exhibit B: Location Man(s) — shows an accurate location of each storm water management practice affected by this Agreement. Exhibit C: Maintenance Plan — prescribes those activities that must be carried out to maintain compliance with this Agreement. Name and Return Address City of Muskego Community Development Department W182 S8200 Racine Avenue Muskego, WI 53150-0749 Through this Agreement, the Owner hereby subjects the Property to the following covenants, conditions and restrictions: Tax Key No. MSKC2280999014 1. The Owner shall be responsible for the routine and extraordinary Parcel Identification Number(s) — (PIN) maintenance and repair of the storm water management practice(s) identified in Exhibit B. 2. The Owner shall be solely responsible for maintenance and repair of the storm water management practices and drainage easements in accordance with the maintenance plan contained in Exhibit C. 3. Upon written notification by City of Muskego or their designee, the Owner shall, at their own cost and within a reasonable time period determined by the City of Muskego, have an inspection of the storm water management practice conducted by a qualified professional, file the professional's inspection report with the City of Muskego which shall be subject to the City's approval and complete any maintenance or repair work recommended in the report. The Owner shall be liable for the failure to undertake any maintenance or repairs. 4. In addition, and independent from the requirements of paragraph 3, above, the City, or its designee, is authorized to access the Property as necessary to conduct inspections of the storm water management practices or drainage easement to ascertain compliance with the intent of this Agreement and the activities described in Exhibit C and any applicable addenda that are subsequently recorded regarding this Agreement. The City may require work to be done which differs from the report described in paragraph 3, if the City reasonably concludes that such work is necessary or appropriate. 5. Upon notification by the City of Muskego of required maintenance or repairs, the Owner shall complete the specified maintenance or repairs within a reasonable time frame determined by the City of Muskego. 6. If the Owner does not complete an inspection under 3. above or required maintenance or repairs under 4. or 5. above within the specified time period, the City of Muskego is authorized, but not required, to perform the specified inspections, maintenance or repairs. In the case of an emergency situation, as determined by the City of Muskego, no notice shall be required prior to the City of Muskego performing emergency maintenance or repairs. The City of Muskego may levy the costs and expenses of such inspections, maintenance or repair related actions as a special charge against the Property and collected as such in accordance with the procedures under s. 66.0627 Wis. Stats. or subch. VII of ch. 66 Wis. Stats. 7. No changes or amendments to this Storm Water Management Practice Maintenance Agreement may be made without the written approval of the City of Muskego. The City of Muskego has the unilateral authority to update Page 1 of 5 this Agreement based upon any physical modifications to the storm water management practices and drainage easements described herein, by recording an updated Exhibit B and/or an updated Exhibit C in the office of the Waukesha County Register of Deeds, and giving notice thereof to the Owner. 8. This Agreement shall run with the Property and be binding upon all heirs, successors and assigns. Such heirs, successors and assigns shall be the "Owner" as used herein. Owner: By: BRYON HRIN STATE OF WISCONSIN ) ) ss. WAUKESHA COUNTY ) Personally came before me this day of , the above named , to me known to be the person who executed the foregoing instrument and acknowledged the same. Notary Public, State of Wisconsin My Commission expires City of Muskego: Mayor Richard Petfalski, Jr. STATE OF WISCONSIN ) ) ss. WAUKESHA COUNTY ) Personally came before me this day of , the above named Richard Petfalski, Jr., to me known to be the person who executed the foregoing instrument and acknowledged the same. This document was drafted by: Attorney Jeffrey J. Warchol, City Attorney City of Muskego W182 S8200 Racine Avenue Muskego, WI 53150 Notary Public, State of Wisconsin My Commission Page 2 of 5 Exhibit A — Legal Description Certified Survey Map No. Being a part of the NE T/4 of the SE '/a of Section 30, T5N, R20E, in the City of Muskego, Waukesha County, Wisconsin. WAUKE$HACOUNTY CERTIFIED SURVEY MAP N0_ ORWG A PART OF 7HE NORTHEATF % OF TW WI-PrHILOW !, OF SECTM 94 TMN 6 NDWK RAWE 211 EA6T, IN TFIE 4Trr GF= NLISIiVM 1AL1.U{ESNA4 C�. VA9C*NM m*sJJ:.�ri;�r�a n,x.il.e _i PARKER — ranv 9ti4 rIR mw 1 i CIE we Ja� prrUKU Am A I i It .I �4 1 .Y11a r1 uaw?a,_ sl R3 &M JRur amen _ - — w1m �r z ' I g_ "iti`tt[h4 70 �� S�SF oil+ _ RT. .ai41 A'! -- ALL JrEwRrn+GsnsFFIF13UP+CFJJ ra 77 EPAST Gr4'w7Hr SO 1rAtAC7' me IXb a� i 4 mfaAti5011Bd r E*T. STA 7i FLAPE 9A*;r �'[IflffrAVAT'KfY.Lwnw961.7H ZfJXE m a JJLkYM7 5 SF.T3M'X1rrJ0Mf R60.4 Fx" 141:7 WfJNG !. J3 Lffj. vx it r �,jJh p PrX U IAL JxKar FIX d llN rm mx aasx t�+�€(,t�'Sy 'i'CC INC wfRng7afuk Nm'apmh YSYae JJV 1Jl.J 7. pl�J xsiaau#Ax'("+)40'JWi �Irirrtar x Ir�eowa>�rr oruYFMEArcla,O' i i -- awYWW0 sn'JhIW45olNdYf,IRP 14Jt97CCYJLSS.i�LF.LLI �i.5, !3®27 1N511IUFIFNT 6RAFFHO BY I H1ARICC FMARtLLP 166176.35321CM Norm; uVre":40..II pff}+r It 6F R Page 3 of 5 Exhibit B — Location Maps Showing the Location of Each Storm Water Management Practice NYId 30VNIVW I E)NIGVH9 4% OCR" PAM iUMD1M. -78 F - I� I F- O ' # t - fit L9 - 57 Wet Detention Basin IN Jill IL Nli jr Page 4 of 5 Exhibit C Minimum Storm Water Practice Maintenance Requirements This exhibit explains the basic function of each of the storm water practices listed in Exhibit B and prescribes the minimum maintenance requirements to remain compliant with this Plan. The maintenance activities listed below are aimed to ensure these practices continue serving their intended functions in perpetuity. The list of activities is not all- inclusive, but rather indicates the minimum type of maintenance that can be expected for this particular site. WET DETENTION BASINS System Description: The wet detention basins (2) are designed to remove at least 80% of the Total Suspended Solids (TSS) in the site runoff and to reduce pre -development downstream peak flows. To function correctly, the pond size, water level, outlet structures and contributing storm sewers & swales must be maintained as specified in this Plan. Minimum Maintenance Requirements: To ensure the proper function of the storm water management practices described above, the following activities must be completed: 1. All swales, storm sewers, the pond outlet structure and pond side slopes must be checked monthly to ensure there is no erosion or blockage from floating debris or ice, especially the washed stone in front of the orifices, the outlet structure and overflow weir. Any erosion or blockage shall be repaired immediately. The washed stone must be replaced when it becomes clogged. Any heavy duty synthetic turf reinforcement Class 3, Type D matting that becomes uninstalled needs to be reinstalled immediately. 2. NO trees are to be planted or allowed to grow on the earthen berms in the pond. Tree root systems can reduce soil compaction and cause berm failure. The berms must be inspected annually and any woody vegetation removed. 3. If floating algae or weed growth becomes a nuisance (decay odors, etc.), it must be removed from the basin and deposited where it cannot drain back into the basin. Removal of the vegetation from the water reduces re- growth the following season (by harvesting the nutrients). Wetland vegetation must be maintained along the water's edge for safety and pollutant removal purposes. 4. The water depth in the wet detention basins is to be inspected every five (5) years to determine the average depth of water throughout the detention basins. The sediment removal is required once the average depth of the permanent pool is 3.5 ft. Pond clay liner shall be protected during removal of sediments. All removed sediment must be placed in an appropriate upland disposal site (on or off site) and stabilized (grass cover) to prevent sediment from washing back into the basin, and located in a way that does not cause blockage of overland flow paths. 5. No grading or filling of the basin or berms other than for sediment removal is allowed, unless otherwise approved by the City of Muskego. 6. Mowing adjacent to basin should be minimized. If mowing is deemed necessary, the mowing heights should be no shorter than six (6) inches. Restricting any mowing to late summer or autumn will minimize mortality to ground nesting birds. To discourage the presence of nuisance waterfowl (i.e. Canada Geese), a minimum 30-foot wide no -mow fringe shall be maintained around the basins, where possible. 7. After Vegetation is 70% established, the use of herbicides/pesticides is to be discontinued along the swales & basins. Page 5 of 5