Loading...
CCR2022.023-Dedication of Public Impr (Cobblestone) COMMON COUNCIL – CITY OF MUSKEGO RESOLUTION #023-2022 DEDICATION OF PUBLIC IMPROVEMENTS FOR COBBLESTONE MEADOWS WHEREAS, Cobblestone Meadows, hereafter called “DEVELOPER” has constructed public improvements in and around Cobblestone Meadows site; including all sanitary sewer facilities, storm sewer facilities and water distribution, including any and all equipment and appurtenances which may in any way be a part thereof or pertain to, in and for Cobblestone Meadows; and WHEREAS, the DEVELOPER has completed the construction and installation of the following improvements: Sanitary Sewer 542 LF at $157.04/LF of 8-Inch Sanitary Sewer Pipe with Granular Backfill $85,115.68 406 LF at $86.19/LF of 6-Inch Sanitary Sewer Lateral with Granular Backfill $34,993.14 4 Each at $ 3,710.00 /Each of Sanitary Manhole $14,840.00 10.5 VF at $359.70/VF of 6-Inch Sanitary Riser $3,776.85 Total – Sanitary Sewer $138,725.67 Water Main 1192 LF at $84.81/LF of 8-Inch Water Main Pipe with Granular Backfill $101,093.52 628 LF at $57.68/LF of 1.5-Inch Water Lateral $36,223.04 34 LF at $143.58/LF of 6-Inch Hydrant Lead $4,881.72 2 Each at $4,700.00/Each of Hydrant Assembly $9,400.00 1 Each at $1,600.00/Each of 8-Inch Gate Valve $1,600.00 5 Each at $1,600/Each of 8-Inch Butterfly Valve $8,000.00 1 Each at $10,790.75/Each of 16”x8” Wet Tap $10,790.75 16 Each at 560.00/Each of 1.5-Inch Curb Stop & Box 8,960.00 Total – Water Main $180,949.03 Storm Sewer 303 LF at $72.27/LF of 24-Inch RCP Storm Sewer Pipe with Granular Backfill $21,897.81 470 LF at $60.92/LF of 18-Inch RCP Storm Sewer Pipe with Granular Backfill $28,632.40 212 LF at $43.61/LF of 6-Inch Sump Lateral $9,245.32 12 Each at $1,900.00/Each of Precast Concrete Manholes/Inlets $22,800.00 1 Each at $600.00/Each of Sump Cleanout $600.00 1 Each at $1,400.00/Each of 24-Inch RCP End Section with Grate $1,400.00 1 Each at $1,100.00/Each of 18-Inlch RCP End Section with Grate $1,100.00 Total – Storm Sewer $85,675.53 RESOLUTION #022-2022 Paving 552 TON at $20.47/TON of ¾-Inch Stone Base Course $11,299.44 552 TON at $20.47/TON of 1¼-Inch Stone Base Course $11,299.44 462 TON at $96.00/TON of Binder Asphalt Course $44,352.00 1157LF at $16.65/LF of Concrete Curb & Gutter $19,264.05 Total – Paving $86,214.93 and appurtenances (collectively called “IMPROVEMENTS”) in accordance with the provision of Chapter 392 of the Municipal Code of the City of Muskego, hereafter called the “CITY”, and the City Engineer has certified the systems’ acceptability; and WHEREAS, it is the Developer’s intent to, without charge to the CITY, unconditionally give, grant, convey and fully dedicate the IMPROVEMENTS to the CITY, free and clear of all encumbrances, and together with mains, conduits, pipes, plants, machinery, equipment and appurtenances which relate directly to the utilization of such IMPROVEMENTS; and WHEREAS, the DEVELOPER shall guarantee the public improvements to be dedicated against any defects due to faulty materials or workmanship which appear within a period of one (1) year from the date of dedication and shall pay for any damages resulting therefrom to the CITY property and shall indemnify the CITY against any claims, suits, or liabilities brought against the CITY at any time arising out of the alleged defects or other failure of this guarantee. NOW, THEREFORE, BE IT RESOLVED That the Common Council of the City of Muskego, upon the recommendation of the Finance Committee, does hereby accept dedication and acceptance of the public improvements in and for Cobblestone Meadows Development. DATED THIS 22nd DAY OF MARCH 2022. SPONORED BY: FINANCE COMMITTEE This is to certify that this is a true and accurate copy of Resolution #023-2022 which was adopted by the Common Council of the City of Muskego. _____________________________ Sharon Mueller, City Clerk-Treasurer