Loading...
PC 055-2021 RESOLUTION RESOLUTION #P.C. 055-2021 APPROVAL OF A BUILDING SITE AND OPERATION PLAN AMENDMENT FOR ALPHA PLASTIC HOLDINGS, LLC. LOCATED IN THE NE ¼ OF SECTION 17 (TAX KEY NO. 2225.999.018 / S82 W19362 APOLLO DRIVE) WHEREAS, A submittal was received from Dan Schmidt of Burback Builders for a Building, Site and Operation (BSO) Plan Amendment located at S82 W19362 Apollo Drive / Tax Key No. 2225.999.018, and WHEREAS, The petitioner is proposing to construct a second building on the property for additional manufacturing and storage area, and WHEREAS, No operational changes are will occur, rather expansion of the current operations will be housed in the second building, and WHEREAS, The property is governed by the City’s General Design Guide, and WHEREAS, The main item in the General Design Guide is to provide four sided architecture with at least 50% masonry products, and WHEREAS, The new building is proposed as a 10,200 square foot (60’ x 170’) metal pole building on the western side of the property, and WHEREAS, The walls will be 21 feet in height with three square fixed windows facing Apollo Drive with a service door and overhead door facing Janesville Road, and WHEREAS, The petitioner stated that the proposed building will match the colors of the existing building as close as possible, and WHEREAS, The front of the existing building consists of a masonry material with tall double-hung windows on the first floor with greenish/tan vertical metal siding on the second floor with the same double-hung windows, and WHEREAS, The proposed building does not have any masonry on the new building and the windows do not match the existing building, and WHEREAS, No additional signage is proposed at this time, and WHEREAS, No new lighting has been proposed at this time. THEREFORE BE IT RESOLVED, The Plan Commission approves of a Building, Site and Operation Plan Amendment for Alpha Plastic Holdings, LLC. located at W173 S7600 Westwood Drive / Tax Key No. 2196.031. BE IT FURTHER RESOLVED, All exterior renovations and site work will require staff review and permits prior to work commencing. BE IT FURTHER RESOLVED, The southern side of the new building must match colors and materials of the existing structure including adding masonry covering the first floor and change the windows to match the existing building, and BE IT FURTHER RESOLVED, Prior to any building permits being approved, the petitioner/design engineer must investigate and provide documentation whether any on-site stormwater facilities will be required based on Milwaukee Metropolitan Sewerage District (MMSD) regulations. BE IT FURTHER RESOLVED, The color of the metal siding and roofing must be an exact match with the existing building and addition. BE IT FURTHER RESOLVED, The roof overhangs of the new building must match the overhang depth of the existing building. BE IT FURTHER RESOLVED, That any new/replaced roof top, wall mounted and ground mechanicals (including HVAC devices, electrical transformers, etc.) must be screened from view and said screening must be approved by the Planning Division before the issuance of building permits. BE IT FURTHER RESOLVED, That any bollards, railings, ladders, louvers, vents, etc. must be painted to match the colors of the principal structure. BE IT FURTHER RESOLVED, Any additional signage (temporary or permanent) will require further review and formal approvals. BE IT FURTHER RESOLVED, No outdoor storage/display is being requested and as such, no outdoor storage/display is allowed outside of the existing fence-screened area without further Plan Commission approvals. BE IT FURTHER RESOLVED, Any new/altered exterior lighting (wall mounted and/or pole mounted) will need approvals from the Planning Division before any lighting changes can be made and all City required lighting specs must be met, include all fixtures being full cut-off with zero degree tilt. BE IT FURTHER RESOLVED, A copy of said plans must be kept on file and that all aspects of this plan shall be maintained in perpetuity unless otherwise authorized by the Plan Commission. BE IT FURTHER RESOLVED, Failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: Denied: Deferred: Introduced: August 3, 2021 ATTEST: Adam Trzebiatowski, Planning Manager