Loading...
PC 035-2021 RESOLUTIONRESOLUTION #P.C. 035-2021 APPROVAL OF A BUILDING SITE AND OPERATION PLAN FOR CHIP MANUFACTURE LLC. FOR THE PROPERTY LOCATED IN THE NW ¼ OF SECTION 2 (S64 W15591 COMMERCE CENTER PARKWAY / TAX KEY NO. 2166.997.008) WHEREAS, Plans were submitted by 12 Gauge Construction, LLC. For Chip Manufacture LLC. for approval of a Building, Site and Operation Plan Amendment for a property located in the NW ¼ of Section 2 (S64 W15591 Commerce Center Parkway / Tax Key No. 2166.997.008), and WHEREAS, A BSO Amendment is needed to locate a nitrogen tank and vaporizer behind the building to be used in the production of potato chips , and WHEREAS, The property is zoned BP-3, Business Park District, and WHEREAS, The 2020 Plan Depicts the area for Business Park uses and the proposal is consistent with the plan, and WHEREAS, The nitrogen tank will be just over 30-feet in height with a much shorter vaporizer, and WHEREAS, This equipment will be located on a 15’ x 30’ concrete pad surrounded by a 42 -inch concrete wall with a 54-inch security fence atop the concrete wall, and WHEREAS, The security fence will be chain link with slating materials, and WHEREAS, A series of concrete bollards surrounds the concrete wall, and WHEREAS, The white colored tank and vaporizer are taller than the fence, but shorter than the building height. THEREFORE BE IT RESOLVED, That the Plan Commission approves of a Building, Site, and Operation Plan Amendment for 12 Gauge Construction, LLC. for the property located in the NW ¼ of Section 2 (S64 W15591 Commerce Center Parkway / Tax Key No. 2166.997.008). BE IT FURTHER RESOLVED, The nitrogen tank and vaporizer must not exceed the height of the building and be painted to match the building unless painting the tank and vaporizer is not allowed by the tank manufacturer. BE IT FURTHER RESOLVED, The color of the slats must match the building. BE IT FURTHER RESOLVED, All bollards must be painted to match the color scheme of the principal structure, contrasting the color at the base of the building, and said colors need to be approved by Planning staff. BE IT FURTHER RESOLVED, All other requirements of the original Resolution PC 014-2019 remain applicable. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: Defeated: Deferred: Introduced: June 1, 2021 ATTEST: Adam Trzebiatowski AICP, Planning Manager