Loading...
PC 016-2021 RESOLUTIONRESOLUTION #P.C. 016-2021 APPROVAL OF A BUILDING SITE AND OPERATION PLAN AMENDMENT FOR FLORES AUTOMATION LOCATED IN THE NE ¼ OF SECTION 15 (TAX KEY NO. 2217.999.002 / S79 W15851 AUD MAR DRIVE) WHEREAS, A submittal was received for a Building, Site and Operation (BSO) Plan amendment for Flores Automation, LLC. located in the SW ¼ of Section 18 (Tax Key No. 2223.994.013 / S84 W 18693 Enterprise Drive), and WHEREAS, The petitioner is proposing to construct a temporary accessory structure behind the existing building to house outdoor storage, and WHEREAS, The accessory structure will be surrounded by fencing to allow for additional outdoor storage along with some security of the storage, and WHEREAS, The accessory structure measures 30 feet wide by 48 feet deep and 21 feet in height, and WHEREAS, The intent of the accessory structure is for it to be temporary, or for two years, at which time the plans are to move forward with a full building expansion pending business progress, and WHEREAS, The accessory structure will be a barn style structure with a white PVC material over the framework, and WHEREAS, A fence is also proposed to surround the entire gravel area behind the existing building to provide an area for outdoor storage and also to provide some security for the storage areas, and WHEREAS, The fence is proposed to be a six-foot chain-link fence with slatting to provide security and also to screen the storage from view, and WHEREAS, The property is zoned M-2 – General Industrial District and an accessory structure, is allowed subject to Plan Commission approval, and WHEREAS, No new signage or new lighting is proposed at this time. THEREFORE BE IT RESOLVED, That the Plan Commission approves a Building, Site and Operation Plan amendment for Flores Automation, LLC. located in the SW ¼ of Section 18 (Tax Key No. 2223.994.013 / S84 W18693 Enterprise Drive). BE IT FURTHER RESOLVED, A Building Permit will need to be submitted to formally permit the accessory structure. BE IT FURTHER RESOLVED, The temporary structure is only approved for a two year period (until May 1, 2023). and at that time the temporary structure should be removed and/or seek Plan Commission approval for an extension. BE IT FURTHER RESOLVED, If there is any wear and tear of the cover or components of the accessory structure that they will be replaced immediately. BE IT FURTHER RESOLVED, That the fencing needs to be a solid type of fencing (i.e. wood, PVC/vinyl, etc.) to provide proper screening. BE IT FURTHER RESOLVED, Any new signage will required separate sign permits before any new signs can be installed. BE IT FURTHER RESOLVED, Details on any new lighting must be submitted at the time of permit review. BE IT FURTHER RESOLVED, That a copy of said plans be kept on file in the Building Department and that all aspects of this plan shall be maintained in perpetuity unless otherwise authorized by the Plan Commission. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: Defeated: Deferred: Introduced: April 7, 2021 ATTEST: Adam Trzebiatowski, Planning Manager