PCR2020073 Weiss 3-lot CSM
AMENDED
RESOLUTION #P.C. 073-2020
APPROVAL OF A THREE LOT CERTIFIED SURVEY MAP FOR THE WEISS PROPERTY
LOCATED AT W133 S8033 NORTHVIEW DRIVE / TAX KEY NO. 2210.999
WHEREAS, A Certified Survey Map (CSM) was submitted by Dave Weiss for a three (3) lot land division
located at W133 S8033 Northview Drive / Tax Key No. 2210.999, and
WHEREAS, The proposed lots range from approximately 5.15 acres to 17.22 acres in size, and
WHEREAS, The property is zoned RC-2 Country Estates District and requires minimum lot sizes of 60,000
SF with a minimum average width of 175 feet per lot, and
WHEREAS, The 2020 Comprehensive Plan depicts the area for rural density residential uses and the
proposed land division is consistent with the plan, and
WHEREAS, All three lots will be served by municipal sewer, and
WHEREAS, All three lots will utilize private wells for water, and
WHEREAS, All three lots have direct access to North View Drive, and
WHEREAS, In July the petitioner brought a two-lot land division sketch before the Plan Commission for a
conceptual discussion, and
WHEREAS, A cul-de-sac bulb will be dedicated to the City with a note stating that the cul-de-sac will not
be improved until additional development occurs, and
WHEREAS, The Land Division ordinance that states that improvements shall be extended to the farthest
affected area, which would include the land toward the east.
THEREFORE BE IT RESOLVED, That the Plan Commission approves of a Certified Survey Map
submitted by Dave Weiss for a three (3) two (2) lot land division located at W133 S8033 Northview Drive /
Tax Key No. 2210.999, subject to technical corrections as identified by the City Engineers, and payment of
all applicable fees and outstanding assessments if applicable.
BE IT FURTHER RESOLVED, A note will be required on the CSM that if there are any land divisions
of the properties within this CSM that the cul-de-sac will need to be discussed at Plan
Commission, Common Council and/or Public Works and Safety Committee to determine if the cul-
de-sac must be extended and improved to City standards.
BE IT FURTHER RESOLVED, All technical corrections from the City will need to be addressed before the
Certified Survey Map can be signed and recorded.
BE IT FURTHER RESOLVED, A note will be required on the CSM that if there is any additional
development of these properties that the cul-de-sac will need to be improved to City standards.
BE IT FURTHER RESOLVED, A right-of-way must be dedicated that extends to the eastern edge of
the property
BE IT FURTHER RESOLVED, A digital file of this CSM shall be submitted to the City in accordance with
Common Council Ordinance No. 1118 and Resolution 196-2002.
Plan Commission
City of Muskego
Adopted: December 1, 2020
Defeated:
Deferred: November 9, 2020
Introduced: November 9, 2020
ATTEST: Adam Trzebiatowski AICP, Planning Manager
Page 2