Loading...
PCR2020073 Weiss 3-lot CSM AMENDED RESOLUTION #P.C. 073-2020 APPROVAL OF A THREE LOT CERTIFIED SURVEY MAP FOR THE WEISS PROPERTY LOCATED AT W133 S8033 NORTHVIEW DRIVE / TAX KEY NO. 2210.999 WHEREAS, A Certified Survey Map (CSM) was submitted by Dave Weiss for a three (3) lot land division located at W133 S8033 Northview Drive / Tax Key No. 2210.999, and WHEREAS, The proposed lots range from approximately 5.15 acres to 17.22 acres in size, and WHEREAS, The property is zoned RC-2 Country Estates District and requires minimum lot sizes of 60,000 SF with a minimum average width of 175 feet per lot, and WHEREAS, The 2020 Comprehensive Plan depicts the area for rural density residential uses and the proposed land division is consistent with the plan, and WHEREAS, All three lots will be served by municipal sewer, and WHEREAS, All three lots will utilize private wells for water, and WHEREAS, All three lots have direct access to North View Drive, and WHEREAS, In July the petitioner brought a two-lot land division sketch before the Plan Commission for a conceptual discussion, and WHEREAS, A cul-de-sac bulb will be dedicated to the City with a note stating that the cul-de-sac will not be improved until additional development occurs, and WHEREAS, The Land Division ordinance that states that improvements shall be extended to the farthest affected area, which would include the land toward the east. THEREFORE BE IT RESOLVED, That the Plan Commission approves of a Certified Survey Map submitted by Dave Weiss for a three (3) two (2) lot land division located at W133 S8033 Northview Drive / Tax Key No. 2210.999, subject to technical corrections as identified by the City Engineers, and payment of all applicable fees and outstanding assessments if applicable. BE IT FURTHER RESOLVED, A note will be required on the CSM that if there are any land divisions of the properties within this CSM that the cul-de-sac will need to be discussed at Plan Commission, Common Council and/or Public Works and Safety Committee to determine if the cul- de-sac must be extended and improved to City standards. BE IT FURTHER RESOLVED, All technical corrections from the City will need to be addressed before the Certified Survey Map can be signed and recorded. BE IT FURTHER RESOLVED, A note will be required on the CSM that if there is any additional development of these properties that the cul-de-sac will need to be improved to City standards. BE IT FURTHER RESOLVED, A right-of-way must be dedicated that extends to the eastern edge of the property BE IT FURTHER RESOLVED, A digital file of this CSM shall be submitted to the City in accordance with Common Council Ordinance No. 1118 and Resolution 196-2002. Plan Commission City of Muskego Adopted: December 1, 2020 Defeated: Deferred: November 9, 2020 Introduced: November 9, 2020 ATTEST: Adam Trzebiatowski AICP, Planning Manager Page 2