PCR2020067 SJ Louis BSO Amend
RESOLUTION #P.C. 067-2020
APPROVAL OF A BUILDING SITE AND OPERATION PLAN AMENDMENT FOR
SJ LOUIS CONSTRUCTION LOCATED IN THE NE ¼ OF SECTION 5
(SE CORNER OF COLLEGE AVENUE AND RACINE AVENUE / TAX KEY NO. 2177.996)
WHEREAS, A submittal was received for a Building, Site and Operation (BSO) Plan amendment
by Chris Johnson of SJ Louis Construction located at SE Corner of College Avenue and Racine
Avenue / Tax Key No. 2177.996, and
WHEREAS, The petitioner is proposing an area for temporary storage of construction equipment
and materials for the Waukesha Water project, and
WHEREAS, Access to the site would be from the existing driveway along Racine Avenue pending
approval from Waukesha County as Racine Avenue is a County Highway, and
WHEREAS, A driveway loop would be would be created where materials and equipment would
be located, and
WHEREAS, Material storage would include pipe materials, tool storage and other miscellaneous
construction materials, and
WHEREAS, Any gravel used will be removed, the site restored to match current conditions when
the project is completed, and
WHEREAS, An anticipated project deadline is September 15, 2022, so the land must be restored
with proper vegetation growth prior to winter 2022, and
WHEREAS, No new signage or lighting has been proposed at this time.
THEREFORE BE IT RESOLVED, The Plan Commission approves of an amended Building, Site
and Operation Plan amendment for SJ Louis Construction located at SE Corner of College
Avenue and Racine Avenue / Tax Key No. 2177.996.
BE IT FURTHER RESOLVED, All areas impacted by this use including storage areas and
driveway areas must have gravel installed.
BE IT FURTHER RESOLVED, All needed land disturbance permits will be needed to ensure all
erosion control measures are installed and maintained throughout the duration of the project.
BE IT FURTHER RESOLVED, Any new/altered exterior lighting will need approvals from the
Planning Division before any lighting changes can be made and all City required lighting specs
must be met, include all fixtures being full cut-off with zero degree tilt.
BE IT FURTHER RESOLVED, Any signage (temporary or permanent) will require further review
for compliance with City sign code regulations and permit approvals.
BE IT FURTHER RESOLVED, A copy of said plans must be kept on file and that all aspects of
this plan shall be maintained in perpetuity unless otherwise authorized by the Plan Commission.
BE IT FURTHER RESOLVED, Failure to comply with the approval contained in this resolution
shall result in the imposition of fines of $100 per day, the initiation of legal action, or both.
Plan Commission
City of Muskego
Adopted: November 9, 2020
Denied:
Deferred:
Introduced: November 9, 2020
ATTEST: Adam Trzebiatowski, Planning Manager