PCR2020066 Danny Haskells BSO Amend
RESOLUTION #P.C. 066-2020
APPROVAL OF A BUILDING SITE AND OPERATION PLAN AMENDMENT FOR
DANNY HASKELLS LOCATED IN THE NW ¼ OF SECTION 10
(TAX KEY NO. 2198.001 / W171 S7260 LANNON DRIVE)
WHEREAS, A submittal was received for a Building, Site and Operation (BSO) Plan amendment
by Mike Kotschi on behalf of Danny Haskells located at W171 S7260 Lannon Drive / Tax Key No.
2198.001, and
WHEREAS, The petitioner is proposing to add a new roof structure above the ADA ramp, and
WHEREAS, A permit was obtained to convert the wooden ADA ramp to a concrete ramp and the
second component of the project is to construct a roof to cover the new ramp, and
WHEREAS, The roof structure addition is intended to be constructed with treated wood posts and
with an asphalt shingle hip-roof colored to match the existing building on the north side of the
building, and
WHEREAS, No new signage or lighting has been proposed at this time.
THEREFORE BE IT RESOLVED, The Plan Commission approves of an amended Building, Site
and Operation Plan amendment for Danny Haskells located at W171 S7260 Lannon Drive /
Tax Key No. 2198.001.
BE IT FURTHER RESOLVED, The shingles on the roof must match the shingles on the existing
building.
BE IT FURTHER RESOLVED, Any new/altered exterior lighting will need approvals from the
Planning Division before any lighting changes can be made and all City required lighting specs
must be met, include all fixtures being full cut-off with zero degree tilt.
BE IT FURTHER RESOLVED, Any signage (temporary or permanent) will require further review
for compliance with City sign code regulations and permit approvals.
BE IT FURTHER RESOLVED, A copy of said plans must be kept on file and that all aspects of
this plan shall be maintained in perpetuity unless otherwise authorized by the Plan Commission.
BE IT FURTHER RESOLVED, Failure to comply with the approval contained in this resolution
shall result in the imposition of fines of $100 per day, the initiation of legal action, or both.
Plan Commission
City of Muskego
Adopted: November 9, 2020
Denied:
Deferred:
Introduced: November 9, 2020
ATTEST: Adam Trzebiatowski, Planning Manager