PCR2020058 Eagle Park Brewery BSO Amend
RESOLUTION #P.C. 058-2020
APPROVAL OF A BUILDING SITE AND OPERATION PLAN AMENDMENT FOR
EAGLE PARK BREWING COMPANY LOCATED IN THE NW ¼ OF SECTION 2
(TAX KEY NO. 2166.997.003 / S64 W15680 COMMERCE CENTER PARKWAY)
WHEREAS, A submittal was received for a Building, Site and Operation (BSO) Plan amendment
from Eagle Park Brewing Company located at S64 W15680 Commerce Center Parkway / Tax
Key No. 2166.997.003, and
WHEREAS, The petitioner obtained an original BSO approval via Resolution PC 029-2019 on
May 7, 2019 for use as a brewery/distillery, tap room and restaurant, and
WHEREAS, A storage/shipping container was initially used for storing brewing/bottling
materials/supplies while the interior was being completed, and
WHEREAS, The petioner is now requesting to be allowed to keep the storage container on site,
in the same location, to meet the storage needs of their business, and
WHEREAS, The storage container is located on the asphalt hard surface, is not visible from the
road and does not block any parking stalls/driveway.
THEREFORE BE IT RESOLVED, The Plan Commission approves of an amended Building, Site
and Operation Plan for Eagle Park Brewing Company at S64 W15680 Commerce Center
Parkway / Tax Key No. 2166.997.003.
BE IT FURTHER RESOLVED, Only one (1) storage container shall be allowed at the location
identified behind the building and said storage container needs to be kept in a clean/neat
condition at all times.
BE IT FURTHER RESOLVED, A copy of said plans must be kept on file and that all aspects of
this plan shall be maintained in perpetuity unless otherwise authorized by the Plan Commission.
BE IT FURTHER RESOLVED, Failure to comply with the approval contained in this resolution
shall result in the imposition of fines of $100 per day, the initiation of legal action, or both.
Plan Commission
City of Muskego
Adopted: September 1, 2020
Denied:
Deferred:
Introduced: September 1, 2020
ATTEST: Adam Trzebiatowski, Planning Manager