Loading...
PCR2020058 Eagle Park Brewery BSO Amend RESOLUTION #P.C. 058-2020 APPROVAL OF A BUILDING SITE AND OPERATION PLAN AMENDMENT FOR EAGLE PARK BREWING COMPANY LOCATED IN THE NW ¼ OF SECTION 2 (TAX KEY NO. 2166.997.003 / S64 W15680 COMMERCE CENTER PARKWAY) WHEREAS, A submittal was received for a Building, Site and Operation (BSO) Plan amendment from Eagle Park Brewing Company located at S64 W15680 Commerce Center Parkway / Tax Key No. 2166.997.003, and WHEREAS, The petitioner obtained an original BSO approval via Resolution PC 029-2019 on May 7, 2019 for use as a brewery/distillery, tap room and restaurant, and WHEREAS, A storage/shipping container was initially used for storing brewing/bottling materials/supplies while the interior was being completed, and WHEREAS, The petioner is now requesting to be allowed to keep the storage container on site, in the same location, to meet the storage needs of their business, and WHEREAS, The storage container is located on the asphalt hard surface, is not visible from the road and does not block any parking stalls/driveway. THEREFORE BE IT RESOLVED, The Plan Commission approves of an amended Building, Site and Operation Plan for Eagle Park Brewing Company at S64 W15680 Commerce Center Parkway / Tax Key No. 2166.997.003. BE IT FURTHER RESOLVED, Only one (1) storage container shall be allowed at the location identified behind the building and said storage container needs to be kept in a clean/neat condition at all times. BE IT FURTHER RESOLVED, A copy of said plans must be kept on file and that all aspects of this plan shall be maintained in perpetuity unless otherwise authorized by the Plan Commission. BE IT FURTHER RESOLVED, Failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: September 1, 2020 Denied: Deferred: Introduced: September 1, 2020 ATTEST: Adam Trzebiatowski, Planning Manager