Loading...
PCR2020045 PEGARL 4 Lot CSM RESOLUTION #P.C. 045-2020 APPROVAL OF A FOUR LOT CERTIFIED SURVEY MAP FOR THE HAUT PROPERTY LOCATED ALONG CROWBAR DRIVE / TAX KEY NO. 2283.999.004 WHEREAS, A Certified Survey Map (CSM) was submitted by Reno Berg of PEGARL, LLP for a four (4) lot land division located along Crowbar Drive / Tax Key No. 2283.999.004, and WHEREAS, The proposed lots are all approximately 2.4 acres in size with the smallest being 2.379 acres (103,629 square feet) in size, and WHEREAS, The property is zoned RC-1 Country Residence District, which requires a minimum lot size of 80,000 square feet and average lot width of 200 feet per lot, and WHEREAS, The 2020 Comprehensive Plan depicts the area for low density residential use and that requires a minimum lot size of at least 88,898 square feet and the proposal is consistent with the plan, and WHEREAS, The lots will be serviced by municipal sanitary sewer since it is located within the Norway Sewer Service Area, and WHEREAS, All lots will be served with private water wells, and WHEREAS, The required public sanitary sewer extensions will need to be designed, installed, and paid for by the developer, and THEREFORE BE IT RESOLVED, That the Plan Commission approves of a Certified Survey Map submitted by Reno Berg of PEGARL, LLP for a four (4) lot land division located along Crowbar Drive / Tax Key No. 2283.999.004 subject to resolution of technical discrepancies as identified by the City Engineers, and payment of all applicable fees and outstanding assessments if applicable. BE IT FURTHER RESOLVED, Easements may need to be established to protect any required public utility extensions. BE IT FURTHER RESOLVED, All technical corrections from the City will need to be addressed before the Certified Survey Map can be signed and recorded. BE IT FURTHER RESOLVED, A digital file of this CSM shall be submitted to the City in accordance with Common Council Ordinance No. 1118 and Resolution 196-2002. Plan Commission City of Muskego Adopted: July 21, 2020 Defeated: Deferred: Introduced: July 21, 2020 ATTEST: Adam Trzebiatowski AICP, Planning Manager