Loading...
PCR2020040 Cornerstone BSO AMENDED RESOLUTION #PC 040-2020 APPROVAL OF A BUILDING SITE AND OPERATION PLAN FOR THE GLEN AT MUSKEGO LAKES LOCATED IN THE NE AND SE ¼ OF SECTION 26 AND THE NW AND SW ¼ OF SECTION 25 (LOOMIS ROAD / TAX KEY NOS. 2258.074, 2258.996.001, 2259.970, 2261.978.003 AND 2264.999) WHEREAS, Plans were submitted by Cornerstone Development for a Building, Site and Operation Plan for The Glen at Muskego Lakes development located in the NE and SE ¼ of Section 26 and the NW and SW ¼ of Section 25 (Loomis Road / Tax Key No. 2258.074, 2258.996.001, 2259.970, 2261.978.003 and 2264.999), and WHEREAS, Cornerstone Development has submitted a Building, Site, and Operation Plan to begin fulfilling the development approvals for the Glen at Muskego Lakes, and WHEREAS, The rezoning and 2020 Comprehensive Plan amendment is in the process of review and approval under a separate resolution, and WHEREAS, The proposed development meets the bulk standards of the proposed Planned Development District based on the RM-2 Zoning District, and WHEREAS, The pending 2020 Comprehensive Plan amendment, if approved, will change the future land use to medium density residential and the proposed Glen at Muskego Lakes development will be consistent with the plan, and WHEREAS, The 43.37 acre site is located along Loomis Road just west of Champions Drive and extends westward to the entrance to Muskego Lakes Golf Club, and WHEREAS, The proposal includes eighty (80) condo units/homes that would include all ranch style structures consisting of fourteen (14) two-family structures, thirteen (13) four-family/double-duplex structures and a clubhouse with amenities for the residents of the development, and WHEREAS, Access will be gained via a to be dedicated right-of-way, which will be located over the existing Muskego Lakes Country Club entry drive, and WHEREAS, The two-family buildings and four-family buildings are intermixed throughout the site separated by open spaces, wetlands and stormwater management features/ponds, and WHEREAS, At two separate points along the street that will be dedicated to the City, there will be private drives heading east that will create an internal network of private roadways to provide access to the condo units, and WHEREAS, The internal roadways will be privately maintained by the development/condo association, yet they will be built to city standards, and WHEREAS, A gated emergency access point is also provided at the west end of Stonebridge Way for a secondary means to gain access into this developer, in the case of an emergency, and WHEREAS, Parking for each of the units will include two enclosed parking spaces plus room for up to two cars on each units driveway and multifamily parking codes request at least two enclosed spaces and the proposal meets code, and WHEREAS, An additional nine-stall parking area is included near the private mini-park, and WHEREAS, There are essentially three structure types in the proposed development consisting of four- plexes, duplexes, and a clubhouse and all the proposed structures utilize the same materials and general architecture, and WHEREAS, The building materials consist of hardiplank lap and shake siding, stone, dimensional shingles, various decorative louvers and composite stucco panels for accents and large windows, and WHEREAS, Dormers are utilized where large spans of roof are proposed to add another architectural feature while breaking the monotony of the expansive roof above the double overhead doors, and WHEREAS, The masonry percentages range from 27 percent to 44 percent on the elevations of the different condominium models, and WHEREAS, There is no photometric plan or lighting specifics at this time, and WHEREAS, Final site layout is subject to Fire Department review and approval, and WHEREAS, Refuse is handled the same as a single family residential lot with contains being kept indoors with local pickup weekly and no dumpster locations are required or proposed, and WHEREAS, Ground mechanicals are typical to single family homes and screening is shown in the landscape plans that will be part of each condo building, and WHEREAS, An extensive set of landscaping plans are part of the submittal consisting of a separate landscape plan for the entire parcel along with landscaping plans for each structure that will be erected, and WHEREAS, The overall site landscaping is found along all perimeters including key locations next to adjoining residential lots for buffering and screening purposes, and WHEREAS, The individual structure landscape plans, including the clubhouse, show a wealth of foundation plantings that will complement each buildings well as screen any low utilities, and WHEREAS, The property will be serviced with municipal sewer and water requiring a developer’s agreement. THEREFORE BE IT RESOLVED, That the Plan Commission approves the Building, Site and Operation Plan for The Glen at Muskego Lakes development located in the NE and SE ¼ of Section 26 and the NW and SW ¼ of Section 25 (Loomis Road / Tax Key Nos. 2258.074, 2258.996.001, 2259.970, 2261.978.003 and 2264.999). BE IT FURTHER RESOLVED, The proposal will require civil approvals by the City Public Works Committee as well as a future developer’s agreement for public improvements similar to a subdivision approval in the city. BE IT FURTHER RESOLVED, On elevations with the double overhead garage doors are located that either the two dormers are included or another feature be added to the roof to break up the expansive roof above the overhead doors BE IT FURTHER RESOLVED, In the case of units with any exposures and/or grade changes, the masonry band must extend onto exposed foundation walls, providing additional masonry. BE IT FURTHER RESOLVED, Final colors selections need to be provided before building permits can be issued. BE IT FURTHER RESOLVED, The landscape plans are subject to City Forester and Planning staff approvals before any permits can be issued. BE IT FURTHER RESOLVED, Additional landscaping is required in the northern portion of the development to screen the development from existing residential residences. BE IT FURTHER RESOLVED, A separate permit is required for any future signs and sign monuments. BE IT FURTHER RESOLVED, The resolution is subject to Fire Department full approval before building permit approvals. BE IT FURTHER RESOLVED, A photometric plan and lighting details will be required at the time of the first building permit within the development. BE IT FURTHER RESOLVED, That a condo plat and certified survey map are still required, along with the final execution of the developers agreement before any work can begin on site. BE IT FURTHER RESOLVED, That no outdoor storage, other than daily driven vehicles, are allowed on the condo property (including but not limited to garbage cans, recycle bins, boats, trailers, campers, junk/wrecked vehicles, etc.) BE IT FURTHER RESOLVED, That a copy of said plans be kept on file in the Building Department and that all aspects of this plan shall be maintained in perpetuity unless otherwise authorized by the Plan Commission. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: July 21, 2020 Defeated: Deferred: Introduced: July 21, 2020 ATTEST: Adam Trzebiatowski, Planning Manager