Loading...
PCR2020037 Alliance Construction RESOLUTION #P.C. 037-2020 APPROVAL OF A BUILDING SITE AND OPERATION PLAN AMENDMENT FOR ALLIANCE CONSTRUCTION AND DESIGN, INC. FOR THE PROPERTY LOCATED IN THE NW ¼ OF SECTION 10 (S73 W16555 JANESVILLE ROAD / TAX KEY NO. 2198.978) WHEREAS, Plans were submitted by Alliance Construction and Design, Inc. for approval of a Building, Site and Operation Plan Amendment for Muskego Laundry for a property located in the NW ¼ of Section 10 (S73 W16555 Janesville Road / Tax Key No. 2198.978), and WHEREAS, The property is zoned B-4, Highway Business District, and WHEREAS, The 2020 Plan Depicts the area for Commercial uses and the proposal is consistent with the plan, and WHEREAS, In August 2019 the applicant obtained Plan Commission approval for a BSO Amendment that included a smaller addition and remodeling the existing building alongside the single bay car wash that would remain, and WHEREAS, In March 2020 the applicant obtained Plan Commission approval for a BSO Amendment for all of the existing building to be removed except for a single car wash bay, on the eastern end of the building, and WHEREAS, All conditions of approval on Resolution PC 016-2020 remain in full effect except as amended as part of this Resolution. THEREFORE BE IT RESOLVED, That the Plan Commission approves of a Building, Site, and Operation Plan Amendment for Alliance Construction & Design, Inc. for the property located in the NW ¼ of Section 10 (S73 W16555 Janesville Road / Tax Key No. 2198.978). BE IT FURTHER RESOLVED, The east wall of the car wash will be moved to meet the ten foot offset unless a variance or other form of relief is approved to allow the existing eastern wall of the car wash to encroach into the eastern side yard offset a maximum of 0.19 feet or 2-3/8”. BE IT FURTHER RESOLVED, Masonry must account for at least 50% of each wall surface and details need to be provided before Building Permit issuance relating to exact colors and new materials of the entire building with the exception of the eastern wall, provided a variance is obtained to leave the existing eastern wall as it currently exists being painted to compliment the remainder of the building. BE IT FURTHER RESOLVED, The landscape plan is subject to final Planning and City Forester approval before building permit issuance and some additional landscaping will be required, especially in front of the building, around the transformer, around the car wash pay station, around the vacuum area and six feet in height spaced accordingly that will break up the monotony of the eastern painted block wall. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: June 2, 2020 Defeated: Deferred: Introduced: June 2, 2020 ATTEST: Adam Trzebiatowski AICP, Planning Manager