Loading...
PCR2020031 Interstate Partners RESOLUTION #P.C. 031-2020 APPROVAL OF A BUILDING SITE AND OPERATION PLAN AMENDMENT FOR INTERSTATE PARTNERS/COMMERCE CENTER INDUSTRIAL LAND LLC FOR THE PROPERTY LOCATED IN THE NW ¼ OF SECTION 2 (S64 W15591 COMMERCE CENTER PARKWAY / TAX KEY NO. 2166.997.008) WHEREAS, Landscaping plans were submitted by Interstate Partners/Commerce Center Industrial Land LLC. for approval of a Building, Site and Operation Plan Amendment for a property located in the NW ¼ of Section 2 (S64 W15591 Commerce Center Parkway / Tax Key No. 2166.997.008), and WHEREAS, The property is zoned BP-3, Business Park District, and WHEREAS, The 2020 Plan Depicts the area for Business Park uses and the proposal is consistent with the plan, and WHEREAS, The submittal includes a narrative and various version of the landscape plans, and WHEREAS, Approval of the berm landscaping plan is required from the BSO approval of Resolution PC 014-2019, and WHEREAS, There is landscaped berm on the east side of this property that was previously installed to help screen the overall Commerce Center development from the neighbors to the east, and WHEREAS, The original landscape included as part of PC 014-2019 had various areas of gaps on the berm where there was not adequate landscape screening, and WHEREAS, The applicant then submitted a landscaping plan for staff review with six (6) new spruce trees that would be six feet (6’) tall at planting, and WHEREAS, After review of said plan noted above, a further revised landscape plan was submitted that shows 13 trees all at eight (8’) feet in height at the time of planting , and WHEREAS, A large transformer unit was also relocated on site to a location in front of the building in a landscape island and it is proposed to be screened with landscaping that does not do an adequate job of screening, and WHEREAS, Additional landscaping is required to screen the transformer unit. THEREFORE BE IT RESOLVED, That the Plan Commission approves of a Building, Site, and Operation Plan Amendment for Interstate Partners/Commerce Center Industrial Lands LLC. for the property located in the NW ¼ of Section 2 (S64 W15591 Commerce Center Parkway / Tax Key No. 2166.997.008). BE IT FURTHER RESOLVED, All conditions of approval from Resolution PC 014-2019 remain effective. BE IT FURTHER RESOLVED, The landscaping plan submitted with 13 separate plantings at eight (8’) feet in height is sufficient to fill gaps within the existing trees, while noting that the building will never be 100% screened due to its height and location. BE IT FURTHER RESOLVED, The transformer will need to be screened with densely spaced 6’ arborvitae, or similar, to ensure adequate screening on the west, north and east sides and the south side should contain the door of the transformer and can have smaller scale screening plantings due to the required door access. BE IT FURTHER RESOLVED, All roof top and ground mechanicals (including HVAC devices, electrical transformers, etc.) must be screened from view and/or incorporated into the design of the site/structure (screening, etc.) and must be approved by the Planning Division before the issuance of building permits and Business Registration approvals. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: May 5, 2020 Defeated: Deferred: Introduced: May 5, 2020 ATTEST: Adam Trzebiatowski AICP, Planning Manager