PCR2020022 Home Path Financial CSM
RESOLUTION #P.C. 022-2020
APPROVAL OF A TWO LOT CERTIFIED SURVEY MAP FOR HOME PATH FINANCIAL
LOCATED SOUTH OF COBBLESTONE MEADOWS ADJACENT TO ST. LEONARD DRIVE
(WEST OF S77 W17530 ST LEONARDS DRIVE AND S77 W17527 ST LEONARDS DRIVE)
WHEREAS, A Certified Survey Map (CSM) was submitted by Home Path Financial to clear up a gap in
Waukesha County mapping, adding land to two existing lots and dedicating right-of-way located west of
S77 W17530 St. Leonards Drive and S77 W17527 St. Leonards Drive, and
WHEREAS, The land is being transferred to the lots immediately east of the gap, being S77 W17530 St.
Leonards Drive (Tax Key No. 2196.036) and S77 W17527 St. Leonards Drive (Tax Key No. 2196.042),
and
WHEREAS, The proposed amended lots are approximately 0.433 acres (18,882 square feet) and 0.435
acres (18,959 square feet) in size, and
WHEREAS, The property is zoned RS-3 Suburban Residence District and requires minimum lot sizes of
15,000 SF with a minimum average width of 100 feet per lot, and
WHEREAS, The 2020 Comprehensive Plan depicts the area for medium density residential uses and the
proposal is consistent with the plan, and
WHEREAS, The area for St. Leonards Drive right-of-way is being dedicated to the City of Muskego for
road purposes, and
WHEREAS, A water main easement needs to be provided on the west side of the northern lot (Lot 1) to
allow for a water main extension to the proposed Cobblestone Meadows development, and
WHEREAS, Both lots are currently served by private water wells, and
WHEREAS, Both lots are served by municipal sanitary sewer.
THEREFORE BE IT RESOLVED, That the Plan Commission approves of a Certified Survey Map
submitted Home Path Financial for a two (2) lot land division located along St. Leonards Drive including
S77 W17530 St. Leonards Drive (Tax Key No. 2196.036) and S77 W17527 St. Leonards Drive (Tax Key
No. 2196.042), subject to technical corrections as identified by the City Engineers/Planners, and payment
of all applicable fees and outstanding assessments if applicable.
BE IT FURTHER RESOLVED, All technical corrections from the City will need to be addressed before the
Certified Survey Map can be signed and recorded.
BE IT FURTHER RESOLVED, A digital file of this CSM shall be submitted to the City.
Plan Commission
City of Muskego
Adopted: May 5, 2020
Defeated:
Deferred:
Introduced: May 5, 2020
ATTEST: Adam Trzebiatowski AICP, Planning Manager