Loading...
PCR2020021 Home Path Financial Condo Plat_CSM_BSO RESOLUTION #P.C. 021-2020 APPROVAL OF A BUILDING, SITE AND OPERATIONS PLAN, CERTIFIED SURVEY MAP AND CONDOMINIUM PLAT FOR THE COBBLESTONE MEADOWS DEVELOPMENT LOCATED IN THE SE ¼ OF SECTION 9 (TAX KEY NO. 2196.958.004 / S76 W17501 JANESVILLE ROAD) WHEREAS, A Building, Site and Operation Plan, Condominium Plat, and Certified Survey Map were submitted for the Cobblestone Meadows development located in the SE ¼ of Section 9 (S76 W17501 Janesville Road / Tax Key No. 2196.958.004), and WHEREAS, Common Council Ordinance #1396 in 2015 approved a rezoning of this property to PD-48 utilizing the RM-3 – Multiple Family Residence District and B-3 General Business District subject to Plan Commission approval of a Building, Site and Operation Plan, and WHEREAS, PD-48 allows 16 total units within 8 duplex buildings on this property and said proposal meets this allowance, and WHEREAS, The 2020 Comprehensive Plan will be amended to Medium Density Residential uses (for the two-family homes/duplexes) and Commercial uses (for the commercial outlot) pursuant to Common Council Ordinance #1396, subject to Plan Commission approval of this Building, Site and Operation Plan, and WHEREAS, The Building, Site and Operations approval includes eight (8) two-family side-by-side residential buildings (16 total residential units) on 6.34 total acres, which breaks down to 2.52 units per acre, which within the 2.99 units per acre allowed under the Medium Density Residential land use and allowed under the RM-3 base zoning, and WHEREAS, A Planned Development Zoning District allows for greater freedom, imagination, and flexibility in the development of land while insuring substantial compliance to the intent of the normal district regulations of the City’s ordinances, and WHEREAS, Access to the site is proposed as a new cul-de-sac off of Janesville Road that will be dedicated to the City as a public right-of-way, and WHEREAS, Each of the residential units will have a two-car garage in addition to private driveways, and WHEREAS, There are two different building types proposed within this development, known as the Juniper and the Cedar, and WHEREAS, The two building designs contain a variety of materials, such as lannon stone, horizontal vinyl siding, split shake vinyl siding and dimensional asphalt shingles, all in a variety of pleasing color palatte options, and WHEREAS, This development is part of the Downtown Design Guide and the General Design Guide, which include the 50% masonry requirement, and WHEREAS, Preliminary masonry calculations have been provided that break down as follows:  Juniper o Front – 54% o Each Side – 37% o Rear – 40% o Total – 42%  Cedar o Front – 71% o Each Side – 35% & 37% o Rear – 51% o Total – 47%, and WHEREAS, Landscape plans for the entire site as well as surrounding individual residential units is included as part of the submittal and there is a mixture of trees, shrubs and perennials on portions of the site, and WHEREAS, The property will be serviced with municipal sewer and municipal water, and WHEREAS, Water and sewer main extensions are needed as part of this development, and WHEREAS, Significant Engineering review has already occurred and final engineering sign-off will need to occur as this project proceeds further and because public utility extensions are required, a developer’s agreement will be required along with a Letter of Credit or Bond, and WHEREAS, Stormwater management is proposed on site and continued Engineering review will be needed to ensure the facilities are sized properly for this full development, and WHEREAS, The proposed CSM contains two (2) lots ranging in size from 9,252 SF (Lot 2/Outlot 1) to 228,992 SF (Lot 1) and the CSM will dedicate the new public road to service this development, and WHEREAS, Lot 1 will become Cobblestone Meadows Condo development, and WHEREAS, Lot 2 (to be changed to Outlot 1) is a remnant outlot that is unbuildable on its own, but there is a tentative proposal to have this outlot possibly sold to or used for access to/for the adjacent commercial land owner to the east, and WHEREAS, The Condo Plat is showing the approximate layout of the condo development, and WHEREAS, The Condo Plat and Certified Survey Map are in the review process and all technical corrections must be addressed before recording. THEREFORE BE IT RESOLVED, That the Plan Commission approves a Building, Site and Operations Plan, Condo Plat and Certified Survey Map for Cobblestone Meadows in the SE ¼ of Section 9 (S76 W17501 Janesville Road / Tax Key No. 2196.958.004) subject to resolution of technical discrepancies as identified by the Planning Division and Engineering Division, and payment of all applicable fees in the Land Division Ordinance and outstanding assessments if applicable. BE IT FURTHER RESOLVED, The landscape plans are subject to formal review by the City Forester and Planning staff before building permits can be issued. BE IT FURTHER RESOLVED, Sign permits are required for any/all signage (temporary or permanent). BE IT FURTHER RESOLVED, All zoning setback and offsets must be met. BE IT FURTHER RESOLVED, Any building/site lighting will need to be submitted and approved before any building permits can be issued. BE IT FURTHER RESOLVED, Final colors selections need to be provided before building permits can be issued. BE IT FURTHER RESOLVED, That each elevation must meet or exceed 50-percent masonry. BE IT FURTHER RESOLVED, In the case of units with any exposures and/or grade changes, the masonry band must extend onto exposed foundation walls, providing additional masonry. BE IT FURTHER RESOLVED, That no outdoor storage, other than daily driven vehicles, are allowed on the condo property (including but not limited to garbage cans, recycle bins, boats, trailers, campers, junk/wrecked vehicles, etc.). BE IT FURTHER RESOLVED, All refuse/recycling bins must be stored within the individual garages, unless approvals for enclosures are sought. BE IT FURTHER RESOLVED, The final site layout is subject to Fire Department review and approval. BE IT FURTHER RESOLVED, Since BSO approvals are valid for two years, if all of the buildings are not started by that time, re-approvals will be required. BE IT FURTHER RESOLVED, If any phasing is going to occur as part of the development of this site, details of said phasing must be provided before any permits can be issued. BE IT FURTHER RESOLVED, That a copy of said plans be kept on file in the City and that all aspects of this plan shall be maintained in perpetuity unless otherwise authorized by the Plan Commission. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines for each day that a violation occurs, the initiation of legal action, or both. BE IT FURTHER RESOLVED, All technical corrections from the City will need to be addressed before the Certified Survey Map and Condo Plat can be signed and recorded. BE IT FURTHER RESOLVED, That a digital file of the CSM and Condo Plat shall be submitted to the City. Plan Commission City of Muskego Adopted: May 5, 2020 Defeated: Deferred: Introduced: May 5, 2020 ATTEST: Adam Trzebiatowski AICP, Planning Manager