Loading...
PCR2020002 Dillet 3 Lot CSM RESOLUTION #P.C. 002-2020 APPROVAL OF A THREE LOT CERTIFIED SURVEY MAP FOR THE DILLETT PROPERTY LOCATED AT W145 S7644 DURHAM DRIVE / TAX KEY NO. 2204.998 WHEREAS, A Certified Survey Map (CSM) was submitted by Tim Dillett for a three (3) lot land division located at W145 S7644 Durham Drive / Tax Key No. 2204.998, and WHEREAS, The proposed lots are 43,454 SF (0.997 acres), 71,781 SF (1.648 acres) and 61,603 SF (1.412 acres) in size, and WHEREAS, The property is zoned RS-2 Suburban Residence District, which requires a minimum lot size of 20,000 square feet and average lot width of 110 feet, when serviced by municipal sanitary sewer, and WHEREAS, The 2020 Plan depicts the area for medium density residential use and the proposal is consistent with the plan, and WHEREAS, All lots will be serviced by municipal sanitary sewer and municipal water, and WHEREAS, Said public utilities will need to be extended at the cost of the developer, and WHEREAS, The existing adjacent lot/house at the northeast corner of Durham Drive and McShane Drive will also have to be serviced with said utilities, and WHEREAS, This same lot was previous approved as a two-lot land division by the same applicant but this new proposal is in place of the previous approval. THEREFORE BE IT RESOLVED, That the Plan Commission approves of a Certified Survey Map submitted by Tim Dillett for a three (3) lot land division located at W145 S7644 Durham Drive / Tax Key No. 2204.998 subject to resolution of technical discrepancies as identified by the City Engineers, and payment of all applicable fees and outstanding assessments if applicable. BE IT FURTHER RESOLVED, A soil boring/test must be conducted to determine the highest anticipated seasonal ground water level and reports of the findings must be provided to the City for review. BE IT FURTHER RESOLVED, Easements will need to be established to protect the public utility extensions. BE IT FURTHER RESOLVED, All technical corrections from the City will need to be addressed before the Certified Survey Map can be signed and recorded. BE IT FURTHER RESOLVED, A digital file of this CSM shall be submitted to the City in accordance with Common Council Ordinance No. 1118 and Resolution 196-2002. Plan Commission City of Muskego Adopted: February 4, 2020 Defeated: Deferred: Introduced: February 4, 2020 ATTEST: Adam Trzebiatowski, Planning Manager