PCR2019072 Schneider CSM
RESOLUTION #P.C. 072-2019
APPROVAL OF A TWO LOT CERTIFIED SURVEY MAP FOR THE SCHNEIDER/KAPUSTA PROPERTY
LOCATED ON JEWEL CREST DRIVE / TAX KEY NOS. 2174.029, 2174.030 & 2174.031
WHEREAS, A Certified Survey Map (CSM) was submitted by Howard Schneider on behalf of Howard
Schneider and Adam Kapusta for a two (2) lot land combination located along Jewel Crest Drive / Tax Key
Nos. 2174.029, 2174.030 & 2174.031, and
WHEREAS, The CSM is reconfiguring three (3) existing lots into two (2) new lots, and
WHEREAS, The proposed lots are approximately 13,418 SF and 14,797 SF in size, and
WHEREAS, The property is zoned RL-3 Lakeshore Residence District and new land divisions in the RL-3
district typically require minimum lot sizes of 15,000 SF with a minimum average width of 100 feet per lot
for new land splits, and
WHEREAS, Since the three existing lots are non-conforming and the three lots are being combined, not
split, into two new larger lots, the lots do not need to meet the minimum size/widths since the lot are being
made more complaint than they currently exist, and
WHEREAS, The 2020 Comprehensive Plan depicts the area for medium density residential uses and the
proposal is more compliant than the existing lots, and
WHEREAS, Both lots will be served by private water wells, and
WHEREAS, Both lots will be served by municipal sanitary sewer, and
WHEREAS, Both lots have access to Jewel Crest Drive, and
WHEREAS, Each of the owners of the outer two original lots will be absorbing a portion of the center lot,
which contains a garage and formerly contained a house, which has been removed.
THEREFORE BE IT RESOLVED, That the Plan Commission approves of a Certified Survey Map
submitted by Howard Schneider on behalf of Howard Schneider and Adam Kapusta for a two (2) lot land
combination located along Jewel Crest Drive / Tax Key Nos. 2174.029, 2174.030 & 2174.031, subject to
technical corrections as identified by the City Engineers/Planners, and payment of all applicable fees and
outstanding assessments if applicable.
BE IT FURTHER RESOLVED, All technical corrections from the City will need to be addressed before the
Certified Survey Map can be signed and recorded.
BE IT FURTHER RESOLVED, A digital file of this CSM shall be submitted to the City in accordance with
Common Council Ordinance No. 1118 and Resolution 196-2002.
Plan Commission
City of Muskego
Adopted: December 3, 2019
Defeated:
Deferred:
Introduced: December 3, 2019
ATTEST: Adam Trzebiatowski AICP, Planning Manager