PCR2019071 Eagle Park Brewery BSO Amend
RESOLUTION #P.C. 071-2019
APPROVAL OF A BUILDING SITE AND OPERATION PLAN AMENDMENT FOR
EAGLE PARK BREWING COMPANY LOCATED IN THE NW ¼ OF SECTION 2
(TAX KEY NO. 2166.997.003 / S64 W15680 COMMERCE CENTER PARKWAY)
WHEREAS, A submittal was received for a Building, Site and Operation (BSO) Plan amendment
from Eagle Park Brewing Company located at S64 W15680 Commerce Center Parkway / Tax
Key No. 2166.997.003, and
WHEREAS, The petitioner obtained an original BSO approval via Resolution PC 029-2019 on
May 7, 2019 for use as a brewery/distillery, tap room and restaurant, and
WHEREAS, Two (2) enclosed grain silos were part of Resolution PC 029-2019 for exterior
storage of fresh and spent grains behind the building in the truck dock area, and
WHEREAS, The two enclosed grain silos are not needed at this time, but the spend grain silo will
be replaced with one (1) single covered trailer to store the spent grains, and
WHEREAS, The spend grains trailer will be taken away to a local farmer every few days, emptied
at the farm and returned to the brewery to be reused again.
THEREFORE BE IT RESOLVED, The Plan Commission approves of an amended Building, Site
and Operation Plan for Eagle Park Brewing Company at S64 W15680 Commerce Center
Parkway / Tax Key No. 2166.997.003.
BE IT FURTHER RESOLVED, Only one (1) covered trailer shall be allowed and shall be located
at the rear of the building and must be closed or sealed at all times when not being actively filled,
cleaned or moved from the site.
BE IT FURTHER RESOLVED, If any complaints are received regarding the odors or
unsightliness of using the covered trailer, the petitioner must immediately come back to the Plan
Commission for another BSO amendment to either move forward with the silos or another avenue
to remove the spent grains from the site without causing any negative impacts on the surrounding
neighbors/uses.
BE IT FURTHER RESOLVED, A copy of said plans must be kept on file and that all aspects of
this plan shall be maintained in perpetuity unless otherwise authorized by the Plan Commission.
BE IT FURTHER RESOLVED, Failure to comply with the approval contained in this resolution
shall result in the imposition of fines of $100 per day, the initiation of legal action, or both.
Plan Commission
City of Muskego
Adopted: December 3, 2019
Denied:
Deferred:
Introduced: December 3, 2019
ATTEST: Adam Trzebiatowski, Planning Manager