Loading...
PCR2019068 Home Path Financial CSM RESOLUTION #P.C. 068-2019 APPROVAL OF A TWO LOT CERTIFIED SURVEY MAP FOR HOME PATH FINANCIAL LOCATED SOUTH OF THE COBBLESTONE MEADOWS ADJACENT TO ST. LEONARD DRIVE WEST OF S77 W17530 ST LEONARDS DRIVE AND S77 W17527 ST LEONARDS DRIVE WHEREAS, A Certified Survey Map (CSM) was submitted by Home Path Financial to clear up a gap in Waukesha County mapping adding land to two existing lots and dedicating right-of-way located west of S77 W17530 St. Leonards Drive and S77 W17527 St. Leonards Drive, and WHEREAS, The land is being transferred to the lots immediately east of the gap, being S77 W17530 St. Leonards Drive (Tax Key No. 2196.036) and S77 W17527 St. Leonards Drive (Tax Key No. 2196.042), and WHEREAS, The proposed amended lots are approximately 0.433 acres (18,882 square feet) and 0.435 acres (18,959 square feet) in size, and WHEREAS, The property is zoned RS-3 Suburban Residence District and requires minimum lot sizes of 15,000 SF with a minimum average width of 100 feet per lot, and WHEREAS, The 2020 Comprehensive Plan depicts the area for medium density residential uses and the proposal is consistent with the plan, and WHEREAS, The area for St. Leonards Drive right-of-way is being dedicated to the City of Muskego for road purposes, and WHEREAS, A water main easement needs to be provided on the west side of the northern lot (Lot 1) to allow for a water main extension to the proposed Cobblestone Meadows development, and WHEREAS, Both lots are currently served by private water wells, and WHEREAS, Both lots are served by municipal sanitary sewer. THEREFORE BE IT RESOLVED, That the Plan Commission approves of a Certified Survey Map submitted Home Path Financial for a two (2) lot land division located along St. Leonards Drive including S77 W17530 St. Leonards Drive (Tax Key No. 2196.036) and S77 W17527 St. Leonards Drive (Tax Key No. 2196.042), subject to technical corrections as identified by the City Engineers/Planners, and payment of all applicable fees and outstanding assessments if applicable. BE IT FURTHER RESOLVED, All technical corrections from the City will need to be addressed before the Certified Survey Map can be signed and recorded. BE IT FURTHER RESOLVED, A digital file of this CSM shall be submitted to the City. Plan Commission City of Muskego Adopted: December 3, 2019 Defeated: Deferred: Introduced: December 3, 2019 ATTEST: Adam Trzebiatowski AICP, Planning Manager