Loading...
PCR2019062 Presbyterian Homes BSO Rezoning CUG RESOLUTION #P.C.062-2019 RECOMMENDATION TO COUNCIL TO REZONE THE PROPERTY FROM I-1 GOVERNMENT AND INSTITUTIONAL DISTRICT TO A PLANNED DEVELOPMENT DISTRICT, APPROVAL OF A BUILDING, SITE AND OPERATION PLAN AND APPROVAL OF A CONDITIONAL USE GRANT FOR PRESBYTERIAN HOMES WISCONSIN/SENIOR HOUSING PARTNERS LOCATED IN THE SE ¼ OF SECTION 2 (W147 S6800 DURHAM PLACE / TAX KEY NO. 2168.961) WHEREAS, A petition was submitted by Presbyterian Homes Wisconsin/Senior Housing Partners to rezone property from I-1 Government and Institutional District to a Planned Development (PD) District for the property located in the SE ¼ of Section 2 (Tax Key No. 2168.961 / W147 S6800 Durham Place), and WHEREAS, Plans were submitted by Presbyterian Homes Wisconsin/Senior Housing Partners for a Building, Site and Operation Plan (BSO) and Conditional Use Grant (CUG) for the senior housing development, and WHEREAS, A Public Hearing for the rezoning was heard before the Common Council on October 22, 2019, and WHEREAS, A Public Hearing for the Conditional Use Grant (CUG) was heard before the Plan Commission on November 5, 2019, and WHEREAS, The submittal includes plans for a senior housing complex to include 80 independent living units, 20 memory care units, 20 assisted living units and a Town Center all located within one common building, and WHEREAS, Based on the total size of the development (9.22 acres), 80 independent living units are allowed under this PD zoning (with a base zoning of RM-1, which allows 5,000 SF of land per unit), and WHEREAS, The CUG is needed for the memory care and assisted living units as they fall under the code identification of “Nursing homes, rest homes, and homes for all aged, including day cares”, and WHEREAS, The 2020 Land Use designation of Institutional Uses will remain due to the makeup of this multi-facet senior living complex, and WHEREAS, There are two access points, one from Janesville Road and one from Durham Place that must remain disconnected pursuant to Waukesha County approval of access from Janesville Road, and WHEREAS, The northern driveway and parking areas will have vertical-face curb and gutter along with the southern parking area and driveway up to the underground parking entrance, and WHEREAS, Parking on the site is provided with underground parking (87 stalls) and two separate surface parking lots (55 stalls) which equates to 1.78 stalls per unit, and WHEREAS, The Zoning Code typically requires 2 enclosed stalls per unit plus additional visitor parking and this proposal does not currently meet the typical requirement, and WHEREAS, The applicant explained that in their other senior developments a ratio of one space per unit has been sufficient, and WHEREAS, The senior housing complex is designed to be two stories on the northern portion of the property and three stories with underground parking on the southern portion of the property, but due to the topography of the site the ridge of the roof of the entire complex is consistent throughout, and WHEREAS, The height of the building on the north side facing Janesville Road has a height of about 27 feet (as measured per code from grade at the base of the building to the mid-point of the pitched roof) and the height on the south side of the building located along Durham Place is proposed at a height of about 37 feet (as measured per code from grade at the base of the building to the mid-point of the pitched roof) and the height to mid-point above the Durham Place roadway elevations is between 39 feet and 45 feet, and WHEREAS, The exterior of the proposed building includes varying stone bays and bands, cement board siding in multiple colors, architectural reveal asphalt shingles, vinyl double glazed windows and wood framed decks with picket railings, and WHEREAS, The submitted renderings show the colors that are being proposed on the buildings and the color palette including blues and greys work will with the grey colored masonry, and WHEREAS, The total average masonry calculation on all provided elevations of the building is 51.3% (varying between 10% and 66%), and WHEREAS, The City’s design guides typically look for about 50% masonry, but the overall quality of the design and material usage is just as important, and WHEREAS, A photometric plan with lighting specifics has been submitted and the light levels meet the current code requirements, and WHEREAS, Trash and recycling storage will be indoors with containers moved outside only on pick-up days, and WHEREAS, No specific details have been provided relating to any mechanical (HVAC, transformer, etc.) units either on the ground or the roofs other than basic notes of some ground mounted features and recessed rooftop units, and WHEREAS, A Landscape Plan is included as part of the submittal and there is a mixture of trees, shrubs and perennials on portions of the site, and WHEREAS, The property will be serviced with municipal sewer and municipal water, and WHEREAS, Stormwater management is proposed on the southern portion of the site and engineering review will be needed to ensure the facilities are sized properly for this full development and to ensure that existing drainage concerns on site are addressed. THEREFORE BE IT RESOLVED, That the Plan Commission approves the Building, Site and Operation Plan and Conditional Use Grant for the senior housing project submitted by Presbyterian Homes Wisconsin/Senior Housing Partners located in the SE ¼ of Section 2 (W147 S6800 Durham Place / Tax Key No. 2168.961). BE IT FURTHER RESOLVED, The Plan Commission is providing a positive recommendation to the Common Council for rezoning the property from I-1 (Government and Institutional District) to PD (Planned Development District). BE IT FURTHER RESOLVED, Before Building Permits can be issued, formal approval from Waukesha County for access to Janesville Road needs to be submitted to the City. BE IT FURTHER RESOLVED, The landscape plans are subject to formal review by the City Forester before building permits can be issued and some additional landscaping and/or modifications will likely be required. BE IT FURTHER RESOLVED, Sign permits are required for any/all signage (temporary or permanent). BE IT FURTHER RESOLVED, A final photometric plan and final lighting/pole details will be required before any building permits can be issued. BE IT FURTHER RESOLVED, All lighting/poles needs to meet the code requirements, including, but not limited to, all fixtures being full cut-off and zero degree tilt, with lighting levels not exceeding 0.5 foot- candles at the lot lines. BE IT FURTHER RESOLVED, Any freestanding lights cannot have a concrete base that exceeds 6 inches above grade. BE IT FURTHER RESOLVED, Since there are not formal details provided relating to exterior/site/building/rooftop mechanical/devices (HVAC units, transformers, generators, etc.), full details will need to be provided relating to the location and size of all exterior mechanical (HVAC units, transformers, etc.) and all such units will need to be fully screened from all surrounding views. BE IT FURTHER RESOLVED, All screening of exterior/site/building/rooftop mechanical/devices (HVAC units, transformers, generator, etc. will need to be approved by the City before any building permits can be issued and the screening should be incorporated into the design building buildings and/or site where possible. BE IT FURTHER RESOLVED, That no outdoor overnight storage/parking, other than daily driven vehicles, is allowed on the property (including but not limited to dumpsters, recycle bins, equipment, supplies, boats, trailers, campers, junk/wrecked vehicles, etc.). BE IT FURTHER RESOLVED, That all bollards must be colored to match the colors of the principal structure. BE IT FURTHER RESOLVED, All parking stall sizes must meet the current code requirements of 10’ x 20’ per parking stall. BE IT FURTHER RESOLVED, The entire site needs to contain concrete curb and gutter, with the exception of the “fire access lanes” provided east of the underground parking entry. BE IT FURTHER RESOLVED, If the “fire access lanes” east of the parking garage entry are used as typical driveways, rather than just for emergency purposes, then said “fire access lanes” will need to also contain curb and gutter. BE IT FURTHER RESOLVED, That any new handicap signs be placed permanently in the ground or mounted to the building. BE IT FURTHER RESOLVED, Any retaining walls that exceed six (6) feet in height are required to have a fence or rail on the high side of them for safety. BE IT FURTHER RESOLVED, All hydrants and water lines servicing said hydrants on site must me publicly dedicated and located within easements. BE IT FURTHER RESOLVED, Full engineering/utility review of the site design and utilities will need to occur as this project proceeds. BE IT FURTHER RESOLVED, Special attention will need to be paid to trying to resolve any existing or new drainage concern as it relates to adjacent properties. BE IT FURTHER RESOLVED, The final site layout is subject to Fire Department review and approval. BE IT FURTHER RESOLVED, The exterior masonry on the eastern elevation between the memory care/assisted living units and the independent living units needs be increased to match the height of the adjacent elevation toward the north. BE IT FURTHER RESOLVED, Prior to building permits being issued, the overall percentage of masonry on the entire building must be provided and be at least 50 percent. BE IT FURTHER RESOLVED, That a copy of said plans be kept on file in the City and that all aspects of this plan shall be maintained in perpetuity unless otherwise authorized by the Plan Commission. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines for each day that a violation occurs, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: November 5, 2019 Defeated: Deferred: Introduced: November 5, 2019 ATTEST: Adam Trzebiatowski, Planning Manager