PCR2019059 Bass Bay Brewhouse Patio BSO Amend
RESOLUTION #P.C. 059-2019
APPROVAL OF A BUILDING SITE AND OPERATION PLAN AMENDMENT
FOR BASS BAY BREWHOUSE LOCATED IN THE NE ¼ OF SECTION 15
(TAX KEY NO. 2217.999.002 / S79 W15851 AUD MAR DRIVE)
WHEREAS, A submittal was received for a Building, Site and Operation (BSO) Plan amendment
for Bass Bay Brewhouse located in the NE ¼ of Section 15 (Tax Key No. 2217.999.002 / S79
W15851 Aud Mar Drive), and
WHEREAS, The petitioner is proposing to add a gazebo/pergola covering the bar on the lake
side of the property on the newly installed patio area, and
WHEREAS, The 22’ x 20’ gazebo/pergola will be wood-framed construction with only corner
posts and a galvanized metal roof, and
WHEREAS, Two fire pits are shown in proximity to the gazebo, which must adhere to the City of
Muskego Fire Prevention Codes, and
WHEREAS, An area of covered outdoor seating immediately adjacent to the building (on the
lake side of the structure) has been recently enclosed and converted to indoor seating area, and
WHEREAS, The entire patio area has been finished with a concrete surface without the crushed
granite as was previously approved, and
WHEREAS, No new signage or new lighting is proposed at this time, and
WHEREAS, The property is zoned BL-2 – Lakeshore Business District with a Conditional Use
Grant (CUG) and the gazebo is considered an accessory structure, which is allowed subject to
Plan Commission approval.
THEREFORE BE IT RESOLVED, That the Plan Commission approves a Building, Site and
Operation Plan amendment for Bass Bay Brewhouse located in the NE ¼ of Section 15 (Tax
Key No. 2217.999.002 / S79 W15851 Aud Mar Drive).
BE IT FURTHER RESOLVED, A Building Permit is needed for the new gazebo/pergola covering
the bar before the structure can be built and inspected.
BE IT FURTHER RESOLVED, A Building Permit and proper inspections are needed for the
enclosed seating area, immediately adjacent to the building on the lake side of the property,
before this areas should be used/occupied for seating of customers.
BE IT FURTHER RESOLVED, Any new signage or lighting will require separate permits before
any new signs and/or lights can be installed.
BE IT FURTHER RESOLVED, That a copy of said plans be kept on file in the Building
Department and that all aspects of this plan shall be maintained in perpetuity unless otherwise
authorized by the Plan Commission.
BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this
resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or
both.
Plan Commission
City of Muskego
Adopted: October 1, 2019
Defeated:
Deferred:
Introduced: October 1, 2019
ATTEST: Adam Trzebiatowski, Planning Manager