Loading...
PCR2019059 Bass Bay Brewhouse Patio BSO Amend RESOLUTION #P.C. 059-2019 APPROVAL OF A BUILDING SITE AND OPERATION PLAN AMENDMENT FOR BASS BAY BREWHOUSE LOCATED IN THE NE ¼ OF SECTION 15 (TAX KEY NO. 2217.999.002 / S79 W15851 AUD MAR DRIVE) WHEREAS, A submittal was received for a Building, Site and Operation (BSO) Plan amendment for Bass Bay Brewhouse located in the NE ¼ of Section 15 (Tax Key No. 2217.999.002 / S79 W15851 Aud Mar Drive), and WHEREAS, The petitioner is proposing to add a gazebo/pergola covering the bar on the lake side of the property on the newly installed patio area, and WHEREAS, The 22’ x 20’ gazebo/pergola will be wood-framed construction with only corner posts and a galvanized metal roof, and WHEREAS, Two fire pits are shown in proximity to the gazebo, which must adhere to the City of Muskego Fire Prevention Codes, and WHEREAS, An area of covered outdoor seating immediately adjacent to the building (on the lake side of the structure) has been recently enclosed and converted to indoor seating area, and WHEREAS, The entire patio area has been finished with a concrete surface without the crushed granite as was previously approved, and WHEREAS, No new signage or new lighting is proposed at this time, and WHEREAS, The property is zoned BL-2 – Lakeshore Business District with a Conditional Use Grant (CUG) and the gazebo is considered an accessory structure, which is allowed subject to Plan Commission approval. THEREFORE BE IT RESOLVED, That the Plan Commission approves a Building, Site and Operation Plan amendment for Bass Bay Brewhouse located in the NE ¼ of Section 15 (Tax Key No. 2217.999.002 / S79 W15851 Aud Mar Drive). BE IT FURTHER RESOLVED, A Building Permit is needed for the new gazebo/pergola covering the bar before the structure can be built and inspected. BE IT FURTHER RESOLVED, A Building Permit and proper inspections are needed for the enclosed seating area, immediately adjacent to the building on the lake side of the property, before this areas should be used/occupied for seating of customers. BE IT FURTHER RESOLVED, Any new signage or lighting will require separate permits before any new signs and/or lights can be installed. BE IT FURTHER RESOLVED, That a copy of said plans be kept on file in the Building Department and that all aspects of this plan shall be maintained in perpetuity unless otherwise authorized by the Plan Commission. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: October 1, 2019 Defeated: Deferred: Introduced: October 1, 2019 ATTEST: Adam Trzebiatowski, Planning Manager