Loading...
PCR2019049 Alliance Construction RESOLUTION #P.C. 049-2019 APPROVAL OF A BUILDING SITE AND OPERATION PLAN AMENDMENT FOR ALLIANCE CONSTRUCTION AND DESIGN, INC. FOR THE PROPERTY LOCATED IN THE NW ¼ OF SECTION 10 (S73 W16555 JANESVILLE ROAD / TAX KEY NO. 2198.978) WHEREAS, Plans were submitted by Alliance Construction and Design, Inc. for approval of a Building, Site and Operation Plan Amendment for Muskego Laundry for a property located in the NW ¼ of Section 10 (S73 W16555 Janesville Road / Tax Key No. 2198.978), and WHEREAS, The property is zoned B-4, Highway Business District, and WHEREAS, The 2020 Plan Depicts the area for Commercial uses and the proposal is consistent with the plan, and WHEREAS, The submittal includes site plans, landscape plan, building elevations, floor plans, and colored renderings, and WHEREAS, As part of the proposed alterations to this building/site the existing car wash use will be reduced to only one stall in the existing eastern bay and the remainder of the building will be used to house a proposed laundromat use with two additional tenant spaces, and WHEREAS, The petitioner requests approvals for a 2,160 square foot addition to the existing building on site, and WHEREAS, The building, with the proposed addition, meets the requirements of the B-4 zoning district per the following:  Front setback of 40’ (Shown as 82.9’ from the edge of the asphalt, existing)  Side/Rear setbacks of one side 10 feet, others 15 feet (shown as 9.8’ to the east (existing) and 51’ to the south (proposed)  Height maximum of 30’ (Identified as 15’-3”)  Floor Area Ratio maximum of 30% (Shown as 20.3%) WHEREAS, The property is governed by the City’s General Design Guide and the City’s Downtown Design Guide, and WHEREAS, The City’s General Design Guide main items are in relation to providing four sided architecture with at least 50% masonry products and the proposal meets these principles, and WHEREAS, The building is proposed to have split face block, veneer stone glass front doors and windows with an EIFS band around the building for future signage, and WHEREAS, The large garage doors will be removed and replaced with windows, door or wall materials, with the exception of the one car wash bay, which is to remain, and WHEREAS, Additional windows are being added to the western elevation where no windows currently exist, and WHEREAS, The site will be accessed from the two existing driveway points along Bellview Drive, and WHEREAS, The site plan shows 32 parking stalls total on-site with 9 parking stalls on the south side of the site and 23 parking stalls on the north side of the site, closest to Janesville Road, and WHEREAS, The zoning code states one (1) parking space is needed for every 150 square feet of floor area and the proposal includes 4,800 SF (excluding utility/employee space) which requires 32 stalls as proposed, and WHEREAS, The parking stalls on the north side of the building are identified as 10’x20’ in size and the parking stalls on the south side of the building are identified as 10’x18’ in size, and WHEREAS, The applicant and the narrative state that that entire site will be repaved with either concrete or asphalt, and WHEREAS, None of the site currently contains curbing, and WHEREAS, There currently is a wood fence that is in poor condition along the rear lot line and as part of this redevelopment project the fence will be removed and replaced with a 6’ tall solid vinyl plank fence to screen this property from the neighbors, and WHEREAS, A dumpster enclosure is proposed in the southwest corner of the site and the enclosure is to be screened with the same vinyl plank fence to be installed on the southern property line, and WHEREAS, The old vacuum islands will be removed and a new single vacuum island will be added on the front portion of the parking lot near the car wash entry, and WHEREAS, The rooftop mechanicals are plan to be recessed into a portion of the new roof area and the applicant notes that they will be screened due to this placement, and WHEREAS, The laundromat’s hours are proposed to be 5am to 11pm and no times have been provided for the hours of the car wash, and WHEREAS, No lighting or signage details (existing or proposed) have been submitted/approved as part of this approval, and WHEREAS, Some basic landscape details have been provided and it appears that some additional landscaping may be required, pending formal review at the time of building permit review, and WHEREAS, All signage sizes are to be regulated per the Zoning Code allowances, and WHEREAS, The site is served by municipal water and sanitary sewer services. THEREFORE BE IT RESOLVED, That the Plan Commission approves of a Building, Site, and Operation Plan Amendment for Alliance Construction & Design, Inc. for the property located in the NW ¼ of Section 10 (S73 W16555 Janesville Road / Tax Key No. 2198.978). BE IT FURTHER RESOLVED, Due to residential neighbors to the west and south, the car wash operations within the proposed development must be limited to the hours of 7am to 10pm. BE IT FURTHER RESOLVED, No outdoor storage, overnight outdoor parking and/or outdoor display is allowed on site unless further Plan Commission approvals are granted. BE IT FURTHER RESOLVED, The gate of the dumpster enclosure must be constructed out of the same material as the fencing. BE IT FURTHER RESOLVED, Approval of a Business Registration for every tenant within this building is required by the City Planning Division before any tenant can use this building/site for any purpose. BE IT FURTHER RESOLVED, 10’ x 18’ parking stalls are allowed on the areas noted on the site plan as part of this approval and the rear drive aisle offset is allowed to be reduced to 3’ due to the new fence being installed. BE IT FURTHER RESOLVED, Since the entire site is being repaved, the exterior of the site and the entry and exit striping to the car wash will need to contain concrete curb and gutter and said plans must be submitted before building permits can be issued. BE IT FURTHER RESOLVED, Any new monument and wall signage will need separate permits from the City. BE IT FURTHER RESOLVED, All existing and new lighting on site must match and said lighting details must match City regulations relating to lighting/poles/bases and will need approvals from the Planning Division before installation can be allowed. BE IT FURTHER RESOLVED, All bollards must be painted to match the colors of the principal structure. BE IT FURTHER RESOLVED, Any handicap sigs, no parking signs, or other information signage must be mounted in the ground or on the building and cannot be on a moveable base. BE IT FURTHER RESOLVED, Details needs to be provided before Building Permit issuance relating to exact colors, new materials and how the exiting masonry is going to be handled as to look presentable and work well with the other proposed materials. BE IT FURTHER RESOLVED, The landscape plan is subject to final Planning and City Forester approval before building permit issuance and some additional landscaping may be required, especially around the transformer. BE IT FURTHER RESOLVED, All roof top and ground mechanicals (including HVAC devices, electrical transformers, etc.) must be screened from view and/or incorporated into the design of the site/structure (screening, etc.) and details ensuring adequate screening must be submitted in more detail to be approved by the Planning Division before the issuance of building permits and Business Registration approvals. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: August 6, 2019 Defeated: Deferred: Introduced: August 6, 2019 ATTEST: Adam Trzebiatowski AICP, Planning Manager