PCR2019038 Soiree BSO Amend
AMENDED
RESOLUTION #P.C. 038-2019
APPROVAL OF A BUILDING, SITE AND OPERATION PLAN AMENDMENT FOR
SOIREE / SERENDIPITY REDISIGN LOCATED IN THE NW ¼ OF SECTION 10
(TAX KEY NO. 2198.993 / S73 W16582 JANESVILLE ROAD)
WHEREAS, A submittal was received for a Building, Site and Operation (BSO) Plan amendment
for Soiree / Serendipity ReDesign located at S73 W16582 Janesville Road / Tax Key No.
2198.993, and
WHEREAS, As part of the condition of the approval of the Business Registration and the Liquor
License for Soiree, the property needs approved parking area installed on-site or a shared
parking agreement must be secured with a neighboring property by June 30, 2019, and
WHEREAS, All past off-site parking agreements will expire as of June 30, 2019, and
WHEREAS, The petitioner is proposing to add an on-site parking area for patrons and
employees, and
WHEREAS, The on-site parking area is proposed as sixty-feet by sixty-five feet with a drive
extending from the existing parking around the east side of the rear building, and
WHEREAS, The parking area and drive will remain three feet from the property line, and
WHEREAS, The on-site parking will total seventeen spaces with three spaces marked in front of
the front building/store, two space in front of Serendipity ReDesign and twelve spaces on the new
parking area, and
WHEREAS, The proposal includes a gravel or traffic bond surface for the parking lot, and
WHEREAS, No new bollards, lighting or signage have been proposed at this time.
THEREFORE BE IT RESOLVED, The Plan Commission approves of an amended Building, Site
and Operation Plan for Soiree / Serendipity Redesign at S73 W16582 Janesville Road / Tax Key
No. 2198.993.
BE IT FURTHER RESOLVED, Any new/altered exterior lighting (wall mounted and/or pole
mounted) will need approvals from the Planning Division before any lighting changes can be
made and all City required lighting specs must be met, include all fixtures being full cut-off with
zero degree tilt.
BE IT FURTHER RESOLVED, The parking area must accommodate 10’ x 20’ parking stalls with
a 24-foot drive aisle allowing for two-way traffic, which means the new parking lot must be at least
64 feet wide to facilitate these regulations.
BE IT FURTHER RESOLVED, For the proposed work, proper permits are required to be issued
prior to any work commencing, including a Zoning Permit and possible Land Disturbance Permit.
BE IT FURTHER RESOLVED, Any bollards protecting the building or other site features must be
painted a color to match the building.
BE IT FURTHER RESOLVED, Surface parking area must be complete with traffic bond
gravel by June 30, 2019, or a parking agreement is submitted to and approved by the City
Planning Division.
BE IT FURTHER RESOLVED, If said parking is not installed or parking agreement not
established and approved by City, liquor license and Business Registration cannot be
renewed, until one of these items is complete.
BE IT FURTHER RESOLVED, Any surface parking area must be hard surfaced (concrete or
asphalt) by June 30, 2020.
BE IT FURTHER RESOLVED, All driveway and parking surfaces must be located at least three
feet from the side lot lines, the owner is responsible for knowing where the lot lines are and for
making sure the three-foot offset is met.
BE IT FURTHER RESOLVED, Since the current parking agreements are only valid until June 30,
2019, the new parking lot must be fully installed, per the Plan Commission approval, by June 30,
2019 and if the parking lot is not installed per this Plan Commission approval by that date, the
Business Registration and Liquor License cannot renewed, which will not allow the business to
legally operate until this work is completed.
BE IT FURTHER RESOLVED, Parking stops are required for all parking stalls within the new
parking lot since curb and gutter is not being provided.
BE IT FURTHER RESOLVED, All parking stalls on site must be marked as part of this project
and no vehicles are allowed to park onsite outside the marked stalls.
BE IT FURTHER RESOLVED, The business is responsible for alerting customers that all past off-
site parking agreements/allowances are no longer valid and their customers can no longer park in
those off-site lots.
BE IT FURTHER RESOLVED, A copy of said plans must be kept on file and that all aspects of
this plan shall be maintained in perpetuity unless otherwise authorized by the Plan Commission.
BE IT FURTHER RESOLVED, Failure to comply with the approval contained in this resolution
shall result in the imposition of fines of $100 per day, the initiation of legal action, or both.
Plan Commission
City of Muskego
Adopted: June 4, 2019
Denied:
Deferred:
Introduced: June 4, 2019
ATTEST: Adam Trzebiatowski, Planning Manager