Loading...
PCR2018065 Heinrich 4 Lot CSM RESOLUTION #P.C. 065-2018 APPROVAL OF A FOUR LOT CERTIFIED SURVEY MAP FOR THE HEINRICH PROPERTY LOCATED AT S102 W16204 HEINRICH DRIVE / TAX KEY NO. 2268.996 WHEREAS, A Certified Survey Map (CSM) was submitted by Frank Heinrich for a four (4) lot land division located at S102 W16204 Heinrich Drive / Tax Key No. 2268.996, and WHEREAS, The proposed lots range in size from 134,886 SF (3.09 acres) to 1,241,128 SF (28.49 acres) in size, and WHEREAS, The property is zoned A-1 Agricultural District, which requires a minimum lot size of 120,000 square feet and average lot width of 300 feet, and WHEREAS, The 2020 Plan depicts the area for rural density residential use and the proposal is consistent with the plan, and WHEREAS, All lots will be serviced by private on-site septic/mound systems and private water wells, and WHEREAS, Lots 3 and 4 are vacant, Lot 1 contains an outbuilding, and Lot 2 contains an existing home along with numerous farm buildings, and WHEREAS, It was determined by the Public Works Committee that actual Heinrich Drive roadway does not need to be extended since only one additional home will front on the extended right-of-way and since there is an existing driveway leading to the home, and WHEREAS, Heinrich Drive also currently has a turn-around easement and a paved cul-du-sac that will continue to be utilized. THEREFORE BE IT RESOLVED, That the Plan Commission approves of a Certified Survey Map submitted by Frank Heinrich for a four (4) lot land division located at S102 W16204 Heinrich Drive / Tax Key No. 2268.996 subject to resolution of technical discrepancies as identified by the City Engineers, and payment of all applicable fees and outstanding assessments if applicable. BE IT FURTHER RESOLVED, A soil boring/test must be conducted to determine the highest anticipated seasonal ground water level and to see were/if the lots can have a mound/septic system and reports of the findings of those items must be provided to the City for review. BE IT FURTHER RESOLVED, The square footage of all outbuildings must be shown on the CSM to ensure that the lot is large enough to support the total outbuilding size. BE IT FURTHER RESOLVED, The outbuilding on Lot 1 will need to be removed within one (1) year of recording of the CSM unless a home is built on the property by that time. BE IT FURTHER RESOLVED, The existing turn-around easement document needs to be provided to the City and reviewed to ensure that it is still valid and adequate. BE IT FURTHER RESOLVED, All technical corrections from the City will need to be addressed before the Certified Survey Map can be signed and recorded. BE IT FURTHER RESOLVED, A digital file of this CSM shall be submitted to the City in accordance with Common Council Ordinance No. 1118 and Resolution 196-2002. Plan Commission City of Muskego Adopted: December 4, 2018 Defeated: Deferred: Introduced: December 4, 2018 Page 2 ATTEST: Adam Trzebiatowski, Planning Manager