PCR2018045 Janusz CSM
RESOLUTION #P.C. 045-2018
APPROVAL OF A THREE LOT CERTIFIED SURVEY MAP FOR THE JANUSZ
PROPERTY LOCATED AT S103 W16115 HEINRICH DRIVE / TAX KEY NO. 2293.999.001
WHEREAS, A Certified Survey Map (CSM) was submitted by Frederic Janusz for a three (3) lot land division
located S103 W16115 Heinrich Drive / Tax Key No. 2293.999.001, and
WHEREAS, The proposed lots range in size from 6.89 acres to 18.95 acres, and
WHEREAS, The property is currently zoned A-1 Agricultural District, which requires a minimum lot size of
120,000 square feet and average lot width of 300 feet, and
WHEREAS, The 2020 Plan depicts the area for rural density residential and commercial uses and the
proposal is consistent with the plan, and
WHEREAS, All lots will be serviced by private mound and septic systems and private water wells, and
WHEREAS, Access to the lots will be gained via a shared access easement since access is not allowed to
STH 36 due to access restrictions and due to wetlands, and
WHEREAS, Per previous Plan Commission discussion, the width of the narrow right-of-way frontage strips
for Lots 1 & 2 are allowed to be 70 feet instead of 80 feet, and
WHEREAS, The Parks & Conservation Plan identify possible trails on/around this lot.
THEREFORE BE IT RESOLVED, That the Plan Commission approves of a Certified Survey Map submitted
by Frederic Janusz for a three (3) lot land division located at S103 W16115 Heinrich Drive / Tax Key No.
2293.999.001 subject to resolution of technical discrepancies as identified by the City Engineers, and
payment of all applicable fees and outstanding assessments if applicable.
BE IT FURTHER RESOLVED, A soil boring/test must be conducted to determine the highest anticipated
seasonal ground water level and to determine were the septic/mound system may work and reports of the
findings must be provided to the City for review.
BE IT FURTHER RESOLVED, The existing access easements will need to be modified to specifically
include access to the newly created lots.
BE IT FURTHER RESOLVED, Further review will need to occur relating to possible trail locations, per the
Parks & Conservation Plan, before the CSM can be recorded.
BE IT FURTHER RESOLVED, All technical corrections from the City will need to be addressed before the
Certified Survey Map can be signed and recorded.
BE IT FURTHER RESOLVED, A digital file of this CSM shall be submitted to the City in accordance with
Common Council Ordinance No. 1118 and Resolution 196-2002.
Plan Commission
City of Muskego
Adopted: August 7, 2018
Defeated:
Deferred:
Introduced: August 7, 2018
ATTEST: Kellie McMullen, Recording Secretary