Loading...
PCR2018024 Casey's CollegeRESOLUTION #P.C. 024-2018 APPROVAL OF A BUILDING, SITE, AND OPERATION PLAN AND CONDITIONAL USE GRANT FOR CASEY’S GENERAL STORE LOCATED IN THE NW ¼ OF SECTION 1 (TAX KEY NO. 2162.999.002 / S63 W13510 JANESVILLE ROAD – COLLEGE AVENUE) WHEREAS, A submittal was received from Casey’s Marketing Company for Casey’s General Store for a new gas station/convenience store located at Janesville Road and College Avenue (Tax Key No. 2162.999.002 / S63 W13510 Janesville Road), and WHEREAS, The property is zoned B-2 Local Service Center District and that district allows gas stations via a conditional use grant (CUG), and WHEREAS, A Public Hearing for the conditional use grant (CUG) was heard before the Plan Commission on April 9, 2018 and WHEREAS, The 2020 Comprehensive Plan shows this property as commercial uses and the proposal is consistent with the plan, and WHEREAS, This property currently contains a building that was formerly used as a bank and will be removed as part this project, and WHEREAS, The proposal is to build a new convenience store/gas station totaling about 4,686 square feet with a separate canopy area to cover 5 multi-product fuel dispensers (10 total fueling stations), and WHEREAS, Hours of the business are proposed as 5:00 AM to 12:00 AM, and WHEREAS, The business will have a total of 15-20 employees with 10 of those being full-time employees, and WHEREAS, This property is governed by the General Design Guide and the Historic Crossroads Design Guide, and WHEREAS, The proposed building is clad with a lower 1 ½ foot band of rustic brown cultured stone with the upper portion of the walls being painted lap siding on all four elevations, along with rustic brown cultured stone column features at the corners, and WHEREAS, The front of the building includes some windows in the central part of the facade but the remainder of the elevation and the side and rear elevations do not include any other windows or architectural features, and WHEREAS, The building contains a weathered wood shingled hip roof, with a section removed in the rear to house the roof top mechanical units, and WHEREAS, Said rooftop units are proposed to be screened with an aluminum screening wall/feature, and WHEREAS, No exact details on the gas canopy design have been provided at this point, and WHEREAS, The narrative mentions a 28’ x 20’ proposed trash enclosure, but detailed drawings have not been submitted at this time, and WHEREAS, The site plan currently shows 20 parking stalls by the building and 10 additional parking locations by the pumps and based on the code requirement at least 17 stall are required, and WHEREAS, All parking stalls are shown to be 9’ x 20’ in size, with the exception of one handicap stall, and all stalls are supposed to be 10’ x 20’ in size, and WHEREAS, Access to the site is proposed via two existing driveway, each one off a separate roadway and via an existing cross access with the site to the west, and WHEREAS, Waukesha County has all control over the Janesville Road and College Avenue access points since those are county highways, and WHEREAS, A landscape plan has been provided that shows various landscaping throughout the site, and WHEREAS, A photometric plan has been included along with specs of proposed lighting fixtures, and WHEREAS, The photometric plan indicates that the lighting will all be building mounted, soffit mounted, and pole mounted, and WHEREAS, The photometric plan shows that the lighting levels do not exceed 0.5 foot-candles at the lot lines, and WHEREAS, Signage has been proposed as follows: one Casey’s wall sign is proposed on the front of the building, three Casey’s signs on the canopy, and a freestanding monument sign, and WHEREAS, Casey’s is seeking approval of two changeable advertising signs on the front elevation, along with four changeable advertising signs on the canopy supports, and WHEREAS, The development will be served by municipal sewer, and WHEREAS, The development is not currently served by municipal water, but since water is located less than 700 feet away, preliminary discussions have indicated that the municipal water main may need to be extended to this site as part of its redevelopment, and WHEREAS, No existing stormwater management facilities exist on site and as part of this redevelopment, stormwater management will need to be accounted for on site, and WHEREAS, The site plans currently shows curb and gutter on the site, with the exception of along the front of the building. THEREFORE BE IT RESOLVED, That the Plan Commission approves of a Building, Site and Operation Plan and a Conditional Use Grant for Casey’s General Store located at Janesville Road and College Avenue (Tax Key No. 2162.999.002 / S63 W13510 Janesville Road) BE IT FURTHER RESOLVED, The proposal has some good design elements but, there are changes that should occur to further enhance the design and to bring it into compliance with the design guides: 1. Overall Building – Since this property is at one of the main gateway entries into the City, some building enhancements should be added to show the character that the Historic Crossroads Design Guide is looking for. 2. All Elevations – Add additional window elements to help further the four-sided architecture goal and to help add some design features to the flat wall space on the facades. 3. All Elevations – There is currently too much area of lap siding and not enough other material usage, especially not enough masonry/stone usage or other upgrades materials. The design guides usually aim to see at closer to 50% masonry/stone. 4. Front Elevation – The gable roof end feature above the main entry to the building shows different materials on the drawings versus the renderings. This gable wall feature should utilize the shake material, rather than the siding to help further the desired design aesthetic for this property. 5. Rear Roof – Alter the design of the rear rooftop mechanical area so that either the units are completely screened by the hip roof itself or possibly consider relocating the rooftop units to grade and screen them with some fencing and landscaping. The Historic Crossroads Design Guide specifically states that the mechanical screening should match or compliment the overall theme of the building. BE IT FURTHER RESOLVED, Details of the overall gas canopy design must be submitted and should include the following design features: 1. Add a hip or gable roof feature to complement the main building in style/design and materials/colors. 2. Add brick or stone to the support columns with a possible cap on top with exposed post above, as this can enhance the design of the canopy. 3. The canopy should not contain as much red. Red can be an allowable color if it is used in a more subtle fashion. BE IT FURTHER RESOLVED, All deliveries (products, fuel, etc.) and trash pick-up hours are limited to between 7:00 AM and 9:00 PM. BE IT FURTHER RESOLVED, Final color selections must be provided before Building Permits can be issued. BE IT FURTHER RESOLVED, All parking stalls must be at 10’ x 20’ in size. BE IT FURTHER RESOLVED, Per the code/design guide recommendation, there should be a 10’ x 20’ landscape island installed within the front parking area since there are 20 stalls provided. BE IT FURTHER RESOLVED, The access points off of Janesville Road and College Avenue will need to be reviewed by the County to ensure no a dditional roadway/entry concerns are present. BE IT FURTHER RESOLVED, Since there is a sidewalk provided in front of this business along Janesville Road, a pedestrian connection to this sidewalk should be provided. BE IT FURTHER RESOLVED, The applicant will need to request that the Public Works Committee make a determination as to if the water main will need to be extended to this property as part this redevelopment. BE IT FURTHER RESOLVED, The cost of any water main extensions are the responsibly of the developer/applicant. BE IT FURTHER RESOLVED, Details of the dumpster enclosure design will need to be provided before building permits can be issued and said design should be similar to the building design. BE IT FURTHER RESOLVED, A separate sign permit will be required before any signage (temporary or permanent) can be installed and this includes any signage on the building or freestanding. BE IT FURTHER RESOLVED, The changeable advertising signs are allowable, as long as they are within the allowed 5% for wall signage. BE IT FURTHER RESOLVED, No outdoor storage or display of products (including but not limited to ice, salt, firewood, propane, etc.) is allowed at any time on site. BE IT FURTHER RESOLVED, All lighting must be zero degree tilt and full cut-off and the concrete bases for any pole lights cannot exceed 6 inches in height above grade. BE IT FURTHER RESOLVED, The height of any light poles cannot exceed the greater of either 15 feet or the average eve height of the building. BE IT FURTHER RESOLVED, The site plan is subject to Fire Department approvals before Building Permits can be issued and possible changes to the site plan may be required based upon the final Fire Department review. BE IT FURTHER RESOLVED, The final landscape plan must be submitted for formal review before building permits can be issued. BE IT FURTHER RESOLVED, Per the Historic Crossroads Design Guide there needs to be a 15 foot landscape buffer abutting Janesville Road with additional landscaping in this area. BE IT FURTHER RESOLVED, The final landscape plan must include additional plantings along the back of the loading area, around the parking/driveway areas, and around the trash enclosure, along with 6’ evergreen type screening around any transformers and/or wall mounted mechanical equipment. BE IT FURTHER RESOLVED, All landscaping must be located com pleted on private property and not within the right-of-way. BE IT FURTHER RESOLVED, Formal approvals from the Engineering Division will be required before the issuance of any permits as it relates to overall site design. BE IT FURTHER RESOLVED, That any bollards, railings, ladders, etc. must be painted to match the colors of the principal structure. BE IT FURTHER RESOLVED, That any new handicap signs be permanently mounted in the ground or mounted to the building so they are not moveable. BE IT FURTHER RESOLVED, That all roof top and ground mechanicals (including HVAC devices, electrical transformers, etc.) must be screened from view and/or incorporated into the design of the site/structure (screening, etc.) and should be approved by the Planning Division before the issuance of building permits. BE IT FURTHER RESOLVED, An annual review will occur on this property for the first year after the building has been in operation and if no problems are found, the annual review could be reconsidered by the Plan Commission. BE IT FURTHER RESOLVED, That a copy of said plans be kept on file in the Building Department and that all aspects of this plan shall be maintained in perpetuity unless otherwise authorized by the Plan Commission. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: Denied: Deferred: April 9, 2018, May 1, 2018 Introduced: April 9, 2018 ATTEST: Kellie McMullen, Recording Secretary