PCR2018006 High School Bleachers
RESOLUTION #P.C. 006-2018
APPROVAL OF A BUILDING SITE AND OPERATION PLAN AMENDMENT FOR
MUSKEGO HIGH SCHOOL ATHLETIC FACILITY BLEACHERS
LOCATED IN THE NW ¼ OF SECTION 21
(TAX KEY 2242.999 / W185 S8750 RACINE AVE.)
WHEREAS, A submittal was received from JW Industries, Inc. on behalf of Muskego High School
for a property located at W185 S8750 Racine Ave. (Tax Key No. 2242.999), and
WHEREAS, The petitioner is proposing to install a new set of bleachers along the west side of
the high school football field, and
WHEREAS, The existing bleachers have already been removed in preparation of the new
bleachers, and
WHEREAS, The new bleachers will be larger than the previous bleachers and they will measure
204 feet long and 54 feet deep with a capacity of 2,430 spectators, and
WHEREAS, The existing press box tower is going to remain as part of this proposal and
additional press box space is being added to each side of the existing press box for more
functional space and more functional access, and
WHEREAS, The bleachers will have cardinal red risers with anodized finished seats, the guardrail
fences will be black and the new press boxes will be slate gray metal, and
WHEREAS, The selected colors will represent the school’s colors while also tying these features
to similar colors used on the recently built ticket booths, restrooms and concession stands, and
WHEREAS, No new lighting or signage has been proposed at this time.
THEREFORE BE IT RESOLVED, That the Plan Commission approves of an amended Building,
Site and Operation Plan from JW Industries, Inc. on behalf of Muskego High School for the
athletic facility west side bleachers located at W185 S8750 Racine Ave. (Tax Key No. 2242.999).
BE IT FURTHER RESOLVED, Any new lighting exterior lighting will need approvals from the
Planning Division before building permits can be issued and all City required lighting specs must
be met, include all fixtures being full cut-off with zero degree tilt.
BE IT FURTHER RESOLVED, Any new exterior (ground, roof mounted, etc.) mechanicals (HVAC
units, transformers, exhaust features, etc.) must be screened from surrounding view and details
relating to the location and size of these features must be provided at Building Permit time.
BE IT FURTHER RESOLVED, No outdoor storage or display is allowed on site unless specific
Plan Commission approvals are granted in the future for any storage and any new
dumpsters/recycle bins must be located within a City approved trash enclosure on site.
BE IT FURTHER RESOLVED, Any bollards must be painted to match the color of the bleacher
features.
BE IT FURTHER RESOLVED, Any signage (temporary or permanent) will require further review
and approvals.
BE IT FURTHER RESOLVED, A copy of said plans must be kept on file and that all aspects of
this plan shall be maintained in perpetuity unless otherwise authorized by the Plan Commission.
BE IT FURTHER RESOLVED, Failure to comply with the approval contained in this resolution
shall result in the imposition of fines of $100 per day, the initiation of lega l action, or both.
Plan Commission
City of Muskego
Adopted: February 6, 2018
Denied:
Deferred:
Introduced: February 6, 2018
ATTEST: Kellie McMullen, Recording Secretary