PCR2017061 AldiRESOLUTION #P.C. 061-2017 APPROVAL OF A BUILDING SITE AND OPERATION PLAN AMENDMENT FOR ALDI LOCATED IN THE SW ¼ OF SECTION 2 (TAX KEY NO. 2167.995.012 / S69 W15361 JANESVILLE ROAD) WHEREAS, A petition has been submitted for approval of a Building, Site and Operation Plan amendment for Aldi located in the SW ¼ of Section 2 (Tax Key No. 2167.995.012 / S69 W15361 Janesville Road), and WHEREAS, The overall purpose of the request is for Aldi to add a 3,325 SF addition onto the north side of their existing building and to alter the parking lot and drive lanes to accommodate said addition, and WHEREAS, The improvements will include the construction of a new up-to-date façade and entry feature, updated mechanicals, and will provide the customers with a new open concept sale floor, and WHEREAS, The property is zoned PD-37 – Candlewood Village Planned Development District and the proposed use/expansion is allowed subject to Plan Commission approval, and WHEREAS, The 2020 Comprehensive Plan identifies this area as commercial uses and the proposal is consistent with that plan, and WHEREAS, This property is governed by the General Design Guide and the Moorland Corridor South Design Guide, and WHEREAS, The proposed addition extends into the existing parking lot to the north, and WHEREAS, The new addition will contain a similar brick veneer as the rest of the building currently contains with the addition of brick pilasters in an accent brick color, aluminum composite paneling, and fiber cement panels, and WHEREAS, A newer tower feature is being added at the main entry of the building, and WHEREAS, The new northern façade does not include the windows that were previously on the northern façade and said windows were previously there as a horizontal element for the long wall area, and WHEREAS, There currently is a smaller roofed tower element at the northeast corner of this building which is proposed to be removed as part of the renovations and said roof feature was originally proposed to help further the design goals from the Moorland Corridor South Design Guide, and WHEREAS, The new main tower features a shingled roof to match the other roof elements on the building but the overhangs for said roof do not match the depth of those on the other existing roof features, and WHEREAS, Due to said expansion, some parking stalls need to be removed and/or altered and some existing curbed landscape islands will be reconfigured, and WHEREAS, The overall site modifications will yield 13 less parking stall, but there are still 87 parking stalls remaining on site and based on the customer area, only 80 stalls are required, and WHEREAS, The new parking stalls located across the main drive aisle from the expansion are shown at 10’x19’ in size in order to allow for a wider drive aisle for ease of customer use, and WHEREAS, A landscape plan has been submitted as part of the proposal and review is pending approval from the City Forester, and WHEREAS, The new addition required the removal of some foundation plantings along the north elevation of the current building, and WHEREAS, New signage is proposed on the tower element that is proposed above the main entry to the building, and WHEREAS, Specific light fixture details and a photometric plan are found in the submittal, and WHEREAS, The wall fixtures will be full cut-off with zero degree tilt and are to be LEDs, with the exception of some architectural lighting that will down light or up light on the exterior walls, and WHEREAS, Any new concrete bases for pole lights cannot exceed 6 inches in height and any new poles must be reviewed by the City for height concerns, and WHEREAS, The development is served by public sanitary sewer and public water, and WHEREAS, Stormwater management will need to be reviewed by Engineering at the time of permit review. THEREFORE BE IT RESOLVED, That the Plan Commission approves a Building, Site and Operation Plan amendment for Aldi located in the SW ¼ of Section 2 (Tax Key No. 2167.995.012 / S69 W15361 Janesville Road). BE IT FURTHER RESOLVED, The new northern façade needs to include similar horizontal windows that were previously on the northern façade. BE IT FURTHER RESOLVED, The roofed tower element at the northeast corner of this building that is part of the current design needs to be added back to the building as part of this renovation to keep with the design intentions of the Moorland Corridor South Design Guide. BE IT FURTHER RESOLVED, The roof overhangs on the new tower feature must match the other roof overhang depth that already exist on this building. BE IT FURTHER RESOLVED, All new exterior materials/colors must match existing building materials. BE IT FURTHER RESOLVED, No outdoor storage of materials and/or equipment (pallets, products, etc.) is allowed on the site. BE IT FURTHER RESOLVED, That a separate sign permit will be required before any signage (temporary or permanent) can be installed and this includes any signage on the building. BE IT FURTHER RESOLVED, All parking stalls must be at least 10’x20’ in size, with the exception of the stall immediately across the main drive aisle from the expansion area, which are allowed to be 10’x19’. BE IT FURTHER RESOLVED, A final landscape plan will need to be approved by the City Forester prior to the issuance of building permits. BE IT FURTHER RESOLVED, The landscape plan should be modified to include foundation planting along the north elevation of the building. BE IT FURTHER RESOLVED, That any bollards on site must be painted to match the colors of the principal structure. BE IT FURTHER RESOLVED, Any handicap signs must be mounted in the ground or on the building. BE IT FURTHER RESOLVED, That all roof top and ground mechanicals (including HVAC devices, electrical transformers, etc.) must be screened from view and/or incorporated int o the design of the site/structure (screening, etc.) and should be approved by the Community Development Department at the time of building permit submittal. BE IT FURTHER RESOLVED, That a copy of said plans be kept on file in the Building Department and that all aspects of this plan shall be maintained in perpetuity unless otherwise authorized by the Plan Commission. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: November 7, 2017 Defeated: Deferred: Introduced: November 7, 2017 ATTEST: Kellie McMullen, Recording Secretary