Loading...
PCR2017037 CGS PremierAMENDED RESOLUTION #P.C. 037-2017 APPROVAL OF A BUILDING SITE AND OPERATION PLAN FOR CGS PREMIER FOR A PROPERTY LOCATED IN THE NW ¼ OF SECTION 2 (COMMERCE CENTER PARKWAY / PART OF TAX KEY NO. 2166.997.006) WHEREAS, Plans were submitted by Interstate Partners for CGS Premier for a new Building, Site and Operation Plan for the property located in the NW ¼ of Section 2 (Commerce Center Parkway / Northern portion of Tax Key No. 2166.997.006), and WHEREAS, The petitioner requests approvals to build a new 65,000 square foot building, to be leased by CGS Premier, located at the east end of Commerce Center Parkway, and WHEREAS, The new building will be used for light manufacturing and assembly for digital printing and custom fabrication of mobile exhibits and displays that are built into vehicles, and WHEREAS, The property is zoned BP-3, Business Park District and the proposed use is allowed subject to Plan Commission approval of a BSO, and WHEREAS, The 2020 Plan Depicts the area for Business Park uses and the proposal is consistent with the plan, and WHEREAS, The building meets the requirements of the BP-3 zoning district per the following:  Lot size of at least 80,000 SF in size (shown on proposed CSM as 385,520 SF)  Lot width of at least 150’ (shown as over 500’)  Front setback of 40’ (shown as 100.5’)  Side/Rear setbacks of 20’ (shown as 117.1’ south, 282.8’ east, and over 220’ north)  Height maximum of 40’ (shown as about 28’)  Open Space requirement of 30% of the lot (shown as about 56%)  Floor Area Ratio maximum of 80% (shown as 17%), and WHEREAS, The property is governed by the City’s General Design Guide and the City’s Business Park Design Guide, and WHEREAS, The City’s General Design Guide main items are in relation to providing four sided architecture with at least 50% masonry products and the proposal meets these principles, and WHEREAS, The City’s Business Park Design Guide main items are in relation to Site Layout & Lot Coverage, Building Arrangement/Massing, Building Viewsheds, Architecture, Building Materials, Landscaping, Signs, Utilities, Lighting, Parking, Loading Areas, and Storage Areas and the proposal meets these principles, and WHEREAS, The building is proposed to have similar architecture to the other large office/light industrial buildings that the city has approved on the site to the west of this and to the Commerce Center West development structures, being mainly built with prefabbed concrete panels that have the various colors, banding, and architectural elements built in, and WHEREAS, The proposed building will contain precast concrete wall panels, low-e glazing with blue or gray tint and clear anodized frames, blue tube steel sun shades, decorative precast concrete fin, blue canopy with prefinished metal fascia all glass overhead doors (on the west elevation), and traditional overhead doors with window panels (east elevation), and WHEREAS, The colors of the building are predominantly off-white/cool gray and medium gray with blue accent features and the all elevation of the building are similar in color and design, and WHEREAS, The southwest corner of the building contains office space and the elevations in these areas represent this with increased window area and the noted sun shades and canopy, and WHEREAS, The site will be accessed off of the east end of Commerce Center Parkway, and WHEREAS, The site plan shows 58 parking stalls along the west and south sides of the property, and WHEREAS, The zoning code states one (1) space is needed for every 2 employees in the business park area and the ratios presented are similar to the other business buildings approved in the Commerce Center, and WHEREAS, The parking stalls are shown as 10’ x 20’ in size and the drive aisles are listed as 30’ in width, and WHEREAS, The west parking area does not show any landscape bump out islands due to the overhead doors in this area and the south parking area does show landscape bump out islands for approximately every ten (10) parking stalls, and WHEREAS, The site plans shows curb and gutter throughout most of the site, with the exception of the area to the rear of the building by the truck parking, and WHEREAS, There is outdoor parking of vehicles/trailers proposed along the east side of the site and this area will be used by vehicles/trailers waiting to be worked on or waiting for pick-up, and WHEREAS, There is an existing large berm with landscaping on it behind (to the east) of the back of this building and the outdoor parking area and said berm will serve screen for the neighbors to the east of this area, and WHEREAS, The applicant has stated that due to the nature of the work that will be conducted here the facility will be fully temperature controlled and as such the rear overhead doors will remain closed unless products are being moved in or out of the building, and WHEREAS, There is one sunken truck dock proposed on the rear elevation, and WHEREAS, An outdoor patio area for employees is shown off the south side of the building, and WHEREAS, A dumpster enclosure is no shown at this time but will be required on site, and WHEREAS, A landscape plan is part of the submittal which shows a great deal of quality landscaping material along the foundations of the building as well as throughout the site, and WHEREAS, Some landscaping is proposed to be removed at the base of the existing berm, and WHEREAS, Conceptual wall signage is shown on the rendering but no other signage details have been shown at this time, and WHEREAS, A photometric plan and lighting detail cut sheets have been submitted as part of the plans showing a mix of pole lights around the perimeter of the building and parking lot as well as various building wall-pack lighting, and WHEREAS, The photometric plan shows no light bleeding above city ordinance requirements, and WHEREAS, There are two pole lights proposed along the south parking area and four pole lights proposed along the back (east) side of the rear parking area and all concrete bases are show n at 2 feet in height, and WHEREAS, The pole lights are proposed to be mounted on 20 foot poles and all lighting is full cut-off LED fixtures, and WHEREAS, Stormwater management has already been taken care of in facilities that were built when the overall Commerce Center was previously built, and WHEREAS, The site will be served by municipal water and sanitary sewer, and WHEREAS, The Engineering Department will be looking into items such as grading, stormwater management, water/sewer service, etc. at the time of building permit submittal, and WHEREAS, The site plan includes an area for a possible 20,000 SF addition and a parking lot expansion if needed in the future. THEREFORE BE IT RESOLVED, That the Plan Commission approves of a Building, Site, and Operation Plan for CGS Premier for the property located in the NW ¼ of Section 2 (Commerce Center Parkway / Northern portion of Tax Key No. 2166.997.006). BE IT FURTHER RESOLVED, That the Plan Commission allows the waiver of the landscape islands for every ten (10) parking stalls, in the west parking area, due to the quality of the landscape plan in this area and due to the placement overhead doors on the west facade. BE IT FURTHER RESOLVED, Additional trees must be planted for screening on the berm along the east side of the property. BE IT FURTHER RESOLVED, That the landscape plan is subject to City Forester approval before building permit issuance and the landscape plan shall meet all City requirements. BE IT FURTHER RESOLVED, Further review/discussion will need to occur to see what is happening with the proposed tree removal at the base of the berm and to see how these will all be replaced. BE IT FURTHER RESOLVED, All overhead doors and pedestrian doors must be colored to match the wall in which it is located, with the exception of the all glass overhead doors. BE IT FURTHER RESOLVED, The overhead doors must match the amount of glass areas as shown on the Plan Commission plans. BE IT FURTHER RESOLVED, That all monument/freestanding and wall signage will need separate permits from the City when desired. BE IT FURTHER RESOLVED, A dumpster enclosure must be shown on the plans at the time of building permit submittal if there will be any need for outdoor trash/refuse bins and said enclosure should be clad with similar materials as the main structure. BE IT FURTHER RESOLVED, That the Plan Commission allows the waiver for the four rear pole lights to have two (2) foot concrete bases since these lights are out of the public view and are adjacent to the truck parking area. BE IT FURTHER RESOLVED, The two southern pole lights must have concrete bases not exceeding six (6) inches above grade since they are protected behind a curb and since they are more visible. BE IT FURTHER RESOLVED, The rear overhead doors will remain closed unless products are being moved in or out of the building. BE IT FURTHER RESOLVED, The site plan is subject to Fire Department approvals at the time of building permits and possible changes to the site plan may be required based upon the final Fire Department review. BE IT FURTHER RESOLVED, That all bollards must be painted to match the colors of the principal structure. BE IT FURTHER RESOLVED, That any handicap sign posts need to be mounted in the ground. BE IT FURTHER RESOLVED, That all roof top and ground mechanicals (including HVAC devices, electrical transformers, etc.) must be screened from view and/or incorporated into the design of the site/structure (screening, etc.), as viewed from Commerce Center Parkway and Moorland Road, and should be approved by the Planning Division before the issuance of building permits. BE IT FURTHER RESOLVED, Any additions (i.e. Phase 2) will require separate Plan Commission approvals. BE IT FURTHER RESOLVED, A Business Registration will need to be applied for before occupancy can be granted for the use of the building. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: May 2, 2017 Defeated: Deferred: Introduced: May 2, 2017 ATTEST: Kellie McMullen, Recording Secretary