Loading...
PCR2017036RESOLUTION #P.C.036-2017 APPROVAL OF A BUILDING SITE AND OPERATION PLAN FOR A TWO-FAMILY RESIDENTIAL STRUCTURE LOCATED IN THE SE ¼ OF SECTION 3 (LOT 15 OF NORTHFIELD GREEN / TAX KEY NO. 2172.025) WHEREAS, Plans were submitted by Steve Stack Builders for a Building, Site and Operation Plan for a two-family residential structure located in the SE ¼ of Section 3, and WHEREAS, Said property is currently zoned RM-2 Multiple Family Residence District and said use is a permitted use, and WHEREAS, Said parcel will be serviced by public sewer and water facilities, and WHEREAS, Said property is subject to the design standards outlined in the City of Muskego’s General Design Guide and the Moorland Corridor South Design Guide, and WHEREAS, The petitioner requests approval for a two-family ranch dwelling on Lot 15 of the Northfield Green Subdivision, and said structure appears to meet the requirements of the zoning ordinance in accordance to the setbacks, offsets, open space, and floor area ratios of the site, and WHEREAS, The Moorland South Design Guide promotes structures to utilize Craftsman or Prairie Style influences, and WHEREAS, Said structure is proposed to be constructed with exterior materials which include brick, cedar, stone caps, L.P. smart siding and trim, L.P smart siding shake, and dimensional shingles, and WHEREAS, Said structure includes architectural elements including tapered box columns, exposed roof beams/brackets, decorative window brackets, shake materials in the gable peaks, and horizontal brick banding, and the elements appear to meet the intent of the Moorland South Corridor Design Guide for craftsman style architecture, and WHEREAS, The proposed roof overhangs on this building are 2-feet in depth, and WHEREAS, The building elevation contain the follow percentages of masonry product:  Front (east) – 32%  Left (south) – 35%  Rear (west) – 65%  Right (north) – 34%, and WHEREAS, The parking will be handled by two-car attached garages and hardscape driveways with room for at least two (2) additional guests, and WHEREAS, A landscaping plan has been submitted and includes a variety of plants, shrubs, and trees. THEREFORE BE IT RESOLVED, That the Plan Commission approves of the Building, Site and Operation Plan submitted by Steve Stack Builders for a two-family residential structure located in the SE ¼ of Section 3, Lot 15 Northfield Green. BE IT FURTHER RESOLVED, That this lot is required to keep at least 14,000 SF as open space and said requirement will need to be reviewed at the time the building permit is reviewed. BE IT FURTHER RESOLVED, A formal landscape plan review will occur at the time of building permit submittal. BE IT FURTHER RESOLVED, That a copy of said plans be kept on file in the Building Department and that all aspect of this plan shall be maintained in perpetuity unless otherwise authorized by the Plan Commission. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: May 2, 2017 Defeated: Deferred: Introduced: May 2, 2017 ATTEST: Kellie McMullen, Recording Secretary