Loading...
PCR2017031 Cam Tech RESOLUTION #P.C. 031-2017 APPROVAL OF A BUILDING SITE AND OPERATION PLAN AMENDMENT FOR CAM TECHNOLOGIES LOCATED IN THE SE ¼ OF SECTION 17 (TAX KEY 2228.999.002 / S83 W18902 SATURN DRIVE) WHEREAS, A submittal was received from CEB Inc. for Cam Technologies located at S83 W18902 Saturn Drive (Tax Key No. 2228.999.002), and WHEREAS, The site currently contains a 5,000 square foot industrial building, and WHEREAS, A 50’ x 120’ (6,000 SF) addition to the existing building is proposed off the rear portion of the existing building to contain new shop space and storage space, and WHEREAS, The addition is proposed to be clad with almond colored metal wall panels with a galvalum colored metal roof, which all match the existing building, and WHEREAS, There are also newly proposed sliding windows, metal service doors, and overhead doors on the east side of the building, and WHEREAS, The General Design Guide typically calls for commercial/industrial structures to be 50% masonry, at Plan Commission discretion, and the addition is proposed be all metal, as are all of the existing side walls of the existing structure, and WHEREAS, New lighting is proposed on the exterior walls of the building, and WHEREAS, No new signage is proposed at this time, and WHEREAS, No new landscaping is proposed at this time, and WHEREAS, No new roof or ground mechanicals, transformers, etc. are proposed at this time, and WHEREAS, The driveway and parking on the site are currently asphalt and are not currently marked/striped and these driveway/parking areas will be expanded along the east side of the new addition, and WHEREAS, There was some limited outdoor storage behind the building and an unscreened dumpster on site. THEREFORE BE IT RESOLVED, That the Plan Commission approves of an amended Building, Site and Operation Plan for CAM Technologies located at S83 W18902 Saturn Drive (Tax Key No. 2228.999.002). BE IT FURTHER RESOLVED, The colors of all doors (overhead and service) must be colored to match the existing door on the building. BE IT FURTHER RESOLVED, Any bollards must be painted/colored to match the color of the building. BE IT FURTHER RESOLVED, Before building permits can be issued for the addition a plan must be submitted for review and approval showing how this entire si te (existing paving and new paving) will be marked/striped to allow for proper parking stalls and drive aisle meeting all City requirements. BE IT FURTHER RESOLVED, Per the required site marking/striping plan noted above, all two - way drive aisles must be at least 24 feet in width and all parking stalls must be 10’ x 20’ in size. BE IT FURTHER RESOLVED, Any new/replaced signage will require approvals from the City. BE IT FURTHER RESOLVED, A refuse/recycling enclosure is required and details of said enclosure must be provided before building permits can be issued. BE IT FURTHER RESOLVED, Any new roof, building, or ground mounted mechanical, transformers, exhausts, etc. must be shown on the building permit plans for approval. BE IT FURTHER RESOLVED, No outdoor storage or trailer parking is allowed outside on this property unless proper screening is proposed and approved. BE IT FURTHER RESOLVED, The site plan is subject to Fire Department approvals before Building Permits can be issued and possible changes to the site plan may be required based upon the final Fire Department review. BE IT FURTHER RESOLVED, The Engineering Department will review the proposal at the time of Building Permit review for any possible concerns relating to stormwater management an d/or grading. BE IT FURTHER RESOLVED, That a copy of said plans be kept on file and that all aspects of this plan shall be maintained in perpetuity unless otherwise authorized by the Plan Commission. BE IT FURTHER RESOLVED, That failure to comply with t he approval contained in this resolution shall result in the imposition of fines of $100 per day, the initi ation of legal action, or both. Plan Commission City of Muskego Adopted: April 4, 2017 Denied: Deferred: Introduced: April 4, 2017 ATTEST: Kellie McMullen, Recording Secretary