Loading...
PCR2017029 Enercon BSORESOLUTION #P.C. 029-2017 APPROVAL OF A BUILDING SITE AND OPERATION PLAN FOR A RETAIL BUILDING (BUILDING C) FOR THE PARKLAND TOWNE CENTER DEVELOPMENT LOCATED IN THE NW ¼ OF SECTION 10 (JANESVILLE ROAD / TAX KEY NO. 2198.984.013) WHEREAS, A Building, Site and Operation Plan was submitted for a new retail building, known as Building C, which is located within the Parkland Towne Center Development in the NW ¼ of Section 10 along Janesville Road (Tax Key No. 2198.984.013), and WHEREAS, This parcel was shown within the Parkland Towne Center Concept Plan as a multi- tenant commercial building, as is proposed here, and WHEREAS, The original concept showed this parcel to contain an approximate 12,000 square foot commercial retail structure and a 10,248 square foot retail structure is now proposed on this 1.18 acre lot, and WHEREAS, The parcel is zoned PD-50 Parkland Towne Center Planned Development District and the proposal meets the general concept proposed during the approved Planned Development rezoning, and WHEREAS, The proposed structure/lot is located in the southwest corner of the overall Parkland Towne Center development and access is gained via the internal private development with private roadways, and WHEREAS, The proposal is part of Planned Development zoning but meets the requirements of Muskego’s underlying commercial zoning districts with a front setback greater than 40 feet and side offsets greater than 10’/15’, and WHEREAS, The building is to be approximately 10,248 square feet constructed as one story and said structure will have altering heights with a peak of no more than 28 feet, and WHEREAS, The building is setup for multiple tenants with up to six (6) total tenant spaces but at this time the developer expects the building to more likely be split into no more than five (5) tenant spaces, and WHEREAS, The proposed meets the Zoning and 2020 Comp Plan for the area, and WHEREAS, The building will be serviced by public sewer and water that were installed as part of the overall Parkland Towne Center development, and WHEREAS, The building will be serviced by stormwater ponds that were installed as part of the overall Parkland Towne Center development, and WHEREAS, This site is governed by the General Design Guide and the Downtown Design Guide which call for 50% masonry product and four-sided architecture, and WHEREAS, The proposed building architecture is proposed to mimic some of the elements of the apartment structures and the other previously approved commercial building, also known as Building A, that have already been approved for the Parkland Towne Center, and WHEREAS, The building architecture proposed contains a good use of materials and many altering heights, and WHEREAS, The materials proposed mainly comprise of the following:  Varying utility brick veneers  Decorative concrete block veneer  Cast stone sills  Fiber cement wall panels  Brake metal fascia  Brake metal coping  Brake metal canopy, and WHEREAS, The proposed materials and colors largely match the materials and colors found on the previously approved apartment structures and commercial “Building A”, and WHEREAS, The proposed building is to be accessed by private roadways approved via easements established on previous certified survey maps, and WHEREAS, A total of seventy-one (71) parking stalls are shown on the site plan, and WHEREAS, Given that this building could be used for a mix of retail/office and/or restaurant/food users the City examined the parking using a mix of both sets of requirements and feels there is enough parking when using industry standards for a center of this type, especially since we know that some of these spaces are dedicated to employee only uses and not customer uses, and WHEREAS, All parking stalls are shown as 9 feet by 18 feet, which is consistent with the other parking areas within the overall development, and WHEREAS, The parking lot appears to be mostly curbed throughout and ample pedestrian access from the lot to the entrances to the building can be found throughout, and WHEREAS, All driving lanes are illustrated at 24 feet in width and the proper markings are shown throughout the site, and WHEREAS, A drive-thru is proposed along the west side of the building with queuing taking place along the west and north sides of the building, and WHEREAS, Due to the placement of the menu board and the pre-order board there may be some traffic pattern concerns along the back side of the building, and WHEREAS, This property and the property to the east share a common driveway for entry and site circulation, and WHEREAS, Possible cross-access between this property and the property to the west is noted on the plans and is encouraged by the City if at all possible, per the recommendations of the City’s Design Guides, and WHEREAS, A dumpster enclosure, with ample perimeter landscaping, is proposed in the northwest corner of the site, and WHEREAS, A landscape plan has been submitted as part of the proposal and review is pending approval from the City Forester, and WHEREAS, A couple areas of parking show more than ten stalls without a landscape island, and WHEREAS, Some general ideas relating to a possible new monument sign have been submitted but overall signage details are not discussed at this time, and WHEREAS, No specific lighting details and/or photometric plan are found in the submittal, and WHEREAS, No outdoor seating areas are proposed as part of this proposal and if any are desired by the developer or a business a separate detailed BSO amendment will be needed before that use can occur. THEREFORE BE IT RESOLVED, That the Plan Commission does hereby approve of a Building, Site and Operation Plan for a commercial building that’s part of the Parkland Towne Center Development property located in the NW ¼ of Section 10 along Janesville Road. BE IT FURTHER RESOLVED, That any backsides of parapet walls must be clad in the same materials and colors as the public viewed façade. BE IT FURTHER RESOLVED, The entire parking lot must contain curb and gutter. BE IT FURTHER RESOLVED, Due to queuing concerns of vehicles waiting to place their order at the drive-thru, the northern drive aisle should either be marked as one-way only from east to west or the drive-thru queuing lane leading up to the ordering board must be expanded to accommodate space for at least four (4) vehicles at or before the ordering board as to limit the possibility of cross-traffic impacts in the rear of this building. BE IT FURTHER RESOLVED, The pre-order menu board must be located completely within the queue lane for the drive-thru and not within the actual drive aisle along the rear of the building. BE IT FURTHER RESOLVED, The sidewalk along the north side of the building must be continuous so that all businesses can be accessed via this sidewalk by pedestrians without crossing into the drive aisle BE IT FURTHER RESOLVED, Before building permits can be issued the developer must either work out cross access with the property to the west or they must present a signed letter stating that the adjacent owner will not allow cross access between the two lots at this time. BE IT FURTHER RESOLVED, A shared access easement must be established for the shared entry and shared driveway along the east side of this lot with the adjoining lot before permits can be issued. BE IT FURTHER RESOLVED, Deliveries for any future tenants should take place during daytime hours and should not impede patron parking stalls during open times of the businesses. BE IT FURTHER RESOLVED, Plan Commission approves of waiving the one landscape island for every 10 parking stalls given the high degree of landscaping on site and the overall continuity of the Parkland Towne Center development. BE IT FURTHER RESOLVED, Any future lighting should match the rest of the Parkland Center development and any lighting must be zero degree tilt, full cut-off, have pole lights a concrete base not exceeding 6”, and a photometric plan meeting city codes. BE IT FURTHER RESOLVED, The decorative wall lights shown on the renderings must be carried through both sides of the building and along the back of the building to promote four-sided design. BE IT FURTHER RESOLVED, Detailed drawings of the dumpster enclosure must be included at the time of building permit submittal and the enclosure needs to match the colors and materials of the main building. BE IT FURTHER RESOLVED, Details of the planter boxes need to be provided at the time of building permit submittal. BE IT FURTHER RESOLVED, All exterior parking stalls all are shown as 9’ x 18’ and has been the standard established as part of the over Parkland development based on other previous approvals. BE IT FURTHER RESOLVED, Fire Department review is required and changes to access lanes for width may occur for approved fire lanes prior to building permit issuance. BE IT FURTHER RESOLVED, No outdoor storage of materials and/or equipment is allowed on the site. BE IT FURTHER RESOLVED, A plat of survey stamped by a Professional Land Surveyor showing the proposed building location must be submitted as part of the building permit review. BE IT FURTHER RESOLVED, A separate sign permit will be required before any signage (temporary or permanent) can be installed and this includes any signage on the building or freestanding/monument signage. BE IT FURTHER RESOLVED, A final landscape plan will need to be approved by the City Forester prior to the issuance of building permits which will include ensuring that the landscape plan meets the Downtown Design Guide requirements. BE IT FURTHER RESOLVED, Any bollards must be painted to match the colors of the principal structure. BE IT FURTHER RESOLVED, Any new handicap signs be incorporated into bored bollards. BE IT FURTHER RESOLVED, All roof top and ground mechanicals (including HVAC devices, electrical transformers, etc.) must be screened from view and/or incorporated into the design of the site/structure (screening, etc.) and should be approved by the Community Development Department. BE IT FURTHER RESOLVED, That a copy of said plans be kept on file in the Building Department and that all aspects of this plan shall be maintained in perpetuity unless otherwise authorized by the Plan Commission. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: April 4, 2017 Defeated: Deferred: Introduced: April 4, 2017 ATTEST: Kellie McMullen, Recording Secretary