PCR2017006 Bohrer CSM
RESOLUTION #P.C. 006-2017
APPROVAL OF A ONE LOT CERTIFIED SURVEY MAP FOR THE BOHRER
PROPERTY LOCATED IN THE NW ¼ OF SECTION 4
(TAX KEY NO. 2174.930 / MUSKEGO DRIVE)
WHEREAS, A Certified Survey Map (CSM) was submitted by Chaput Land Survey for the Bohrer property
for a one (1) lot land clarification located in the NW ¼ of Section 4 (Tax Key No. 2174.930 / Muskego Drive),
and
WHEREAS, The proposed CSM is being done to clarify the lot boundaries of an existing vacant lot on the
east shore of Little Muskego Lake, and
WHEREAS, The proposed lot is 8,067 sq. ft. in area, and
WHEREAS, The zoning for this lot is RL-3 Lakeshore Residence District, and
WHEREAS, The 2020 Plan depicts the area for medium density land uses, and
WHEREAS, Since the lot is not actually being divided or reduced in size, the existing zoning requirements
relating to width and area do not come into play since this is an existing lot of record that is having its
boundaries clarified, and
WHEREAS, The lot will be served by municipal sewer and a private water well.
THEREFORE BE IT RESOLVED, That the Plan Commission approves of a Certified Survey Map submitted
by Chaput Land Surveys for the Bohrer property for a one (1) lot land division located in the NW ¼ of
Section 4 (Tax Key No. 2174.930 / Muskego Drive), subject to resolution of technical discrepancies as
identified by the City Engineers, and payment of all applicable fees in Section 18.14(3) of the Land Division
Ordinance and outstanding assessments if applicable.
BE IT FURTHER RESOLVED, That all technical corrections from the City will need to be addressed before
the Certified Survey Map can be signed and recorded.
BE IT FURTHER RESOLVED, That a digital file of this CSM shall be submitted to the City in accordance
with Common Council Ordinance No. 1118 and Resolution 196-2002.
Plan Commission
City of Muskego
Adopted: February 7, 2017
Defeated:
Deferred:
Introduced: February 7, 2017
ATTEST: Kellie McMullen, Recording Secretary