PCR2016071
RESOLUTION #P.C. 071-2016
APPROVAL OF A THREE LOT CERTIFIED SURVEY MAP FOR THE HAFFNER PROPERTY
LOCATED IN THE SW ¼ OF SECTION 26
(TAX KEY NO. 2263.998.004 / W151 S10282 THODE DRIVE)
WHEREAS, On October 18, 2016 a Certified Survey Map was submitted by Robert Haffner for a three (3) lot
land division located in the SW ¼ of Section 26 (Tax Key No. 2263.998.004 / W151 S10282 Thode Drive),
and
WHEREAS, A two (2) lot Certified Survey Map was approved by the Plan Commission early this year for this
same lot but the owner is now looking to do a three (3) lot Certified Survey Map, and
WHEREAS, The proposed lots range in size from 2.755 acres to 4.993 acres, and
WHEREAS, Said property is currently zoned A-1 Agricultural District requiring minimum lot sizes of 120,000
square feet and an average minimum width of 300 feet, and
WHEREAS, The 2020 Plan depicts the area for rural density land uses (or possible future commercial uses)
and the proposal is consistent with the plan, and
WHEREAS, All lots will be served by private mound or septic and private water wells, and
WHEREAS, Lot 3 will be left with an accessory structure on it with no principal use to support said
accessory use.
THEREFORE BE IT RESOLVED, That the Plan Commission approves of a Certified Survey Map submitted
by Robert Haffner for a three (3) lot land division located in the SW ¼ of Section 26 (Tax Key No.
2263.998.004 / W151 S10282 Thode Drive), subject to resolution of technical discrepancies as identified by
the City Engineers, and payment of all applicable fees in Section 18.14(3) of the Land Division Ordinance
and outstanding assessments if applicable.
BE IT FURTHER RESOLVED, That a note must be placed on the CSM stating that a home must be built on
Lot 3 within one (1) year of recording of the CSM or the accessory structure must be removed from the lot at
that time.
BE IT FURTHER RESOLVED, If a new home is built on Lot 3 within one (1) year of recording of the CSM,
the accessory structure and the house must having matching colors (wall and roof ing), unless a Plan
Commission color waiver is granted.
BE IT FURTHER RESOLVED, That a soil boring must be conducted to determine the highest anticipated
season ground water level.
BE IT FURTHER RESOLVED, That a location needs to be determined that is suitable for a septic/mound
system.
BE IT FURTHER RESOLVED, That the determination of need and/or location for a drainage easement will
be made by the Public Works Committee and/or Engineering staff and their determination must be reflected
on the final CSM.
BE IT FURTHER RESOLVED, That all technical corrections from the City will need to be addressed before
the Certified Survey Map can be signed and recorded.
BE IT FURTHER RESOLVED, That a digital file of this CSM shall be submitted to the City in accordance
with Common Council Ordinance No. 1118 and Resolution 196-2002.
Plan Commission
City of Muskego
Adopted: November 1, 2016
Page 2
Defeated:
Deferred:
Introduced: November 1, 2016
ATTEST: Kellie McMullen, Recording Secretary