Loading...
PCR2016046RESOLUTION #P.C.046-2016 APPROVAL OF A BUILDING SITE AND OPERATION PLAN FOR A TWO-FAMILY RESIDENTAIL STRUCTURE LOCATED IN THE SE ¼ OF SECTION 3 (LOT 9 OF NORTHFIELD GREEN / TAX KEY NO. 2172.019) WHEREAS, On June 29, 2016 plans were submitted by Bower Design and Construction for a Building, Site and Operation Plan for a two-family residential structure located in the SE ¼ of Section 3, and WHEREAS, Said property is currently zoned RM-2 Multiple Family Residence District and said use is a permitted use, and WHEREAS, Said parcel will be serviced by public sewer and water facilities, and WHEREAS, Said property is subject to the design standards outlined in the City of Muskego’s General Design Guide and the Moorland South Design Guide, and WHEREAS, The petitioner requests approval for a two-family ranch dwelling on Lot 9 of the Northfield Green Subdivision, and said structure appears to meet the requirements of the zoning ordinance in accordance to the setbacks, offsets, open space, and floor area ratios of the site, and WHEREAS, The Moorland South Design Guide promotes structures to utilize Craftsman or Prairie Style influences, and WHEREAS, Said structure is proposed to be constructed with exterior materials which include cultured stone with limestone sills, freezeboard, and dimensional shingles, and WHEREAS, Said structure includes architectural elements including tapered box columns, exposed roof rafters, window mullions, and use of shake materials, and the elements appear to meet the intent of the Moorland South Design Guide for craftsman style architecture, and WHEREAS, One and a half foot overhangs are found  Front (south) – 34%  Left (west) – 6%  Right (east) – 2%  Rear (north) – 8%, and WHEREAS, The parking will be handled by two-car attached garages and concrete/asphalt driveways with room for at least two (2) additional guests, and WHEREAS, A landscaping plan has been submitted and is pending approval by the City Forester. THEREFORE BE IT RESOLVED, That the Plan Commission approves of the Building, Site and Operation Plan submitted by Bower Design and Construction for a two-family residential structure located in the SE ¼ of Section 3. BE IT FURTHER RESOLVED, The proposed overhangs on this building only extend one and a half feet and the resolution is written that they must be 2-feet or greater at building permit time. BE IT FURTHER RESOLVED, The percentages of masonry products must be increased on the elevations to at least the following percentages by building permit submittal:  Front – Around 30%+  Sides – Around 20%+  Rear – Around 25%+. BE IT FURTHER RESOLVED, That this lot is required to keep at least 14,000 SF as open space and said requirement will need to be reviewed at the time the building permit is reviewed. BE IT FURTHER RESOLVED, The landscape plan is subject to approval by the City Forester prior to the release of building permits. BE IT FURTHER RESOLVED, That a copy of said plans be kept on file in the Building Department and that all aspect of this plan shall be maintained in perpetuity unless otherwise authorized by the Plan Commission. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: July 11, 2016 Defeated: Deferred: Introduced: July 11, 2016 ATTEST: Kellie McMullen, Recording Secretary