PCR2016046RESOLUTION #P.C.046-2016
APPROVAL OF A BUILDING SITE AND OPERATION PLAN
FOR A TWO-FAMILY RESIDENTAIL STRUCTURE
LOCATED IN THE SE ¼ OF SECTION 3
(LOT 9 OF NORTHFIELD GREEN / TAX KEY NO. 2172.019)
WHEREAS, On June 29, 2016 plans were submitted by Bower Design and Construction
for a Building, Site and Operation Plan for a two-family residential structure located in
the SE ¼ of Section 3, and
WHEREAS, Said property is currently zoned RM-2 Multiple Family Residence District
and said use is a permitted use, and
WHEREAS, Said parcel will be serviced by public sewer and water facilities, and
WHEREAS, Said property is subject to the design standards outlined in the City of
Muskego’s General Design Guide and the Moorland South Design Guide, and
WHEREAS, The petitioner requests approval for a two-family ranch dwelling on Lot 9 of
the Northfield Green Subdivision, and said structure appears to meet the requirements
of the zoning ordinance in accordance to the setbacks, offsets, open space, and floor
area ratios of the site, and
WHEREAS, The Moorland South Design Guide promotes structures to utilize Craftsman
or Prairie Style influences, and
WHEREAS, Said structure is proposed to be constructed with exterior materials which
include cultured stone with limestone sills, freezeboard, and dimensional shingles, and
WHEREAS, Said structure includes architectural elements including tapered box
columns, exposed roof rafters, window mullions, and use of shake materials, and the
elements appear to meet the intent of the Moorland South Design Guide for craftsman
style architecture, and
WHEREAS, One and a half foot overhangs are found
Front (south) – 34%
Left (west) – 6%
Right (east) – 2%
Rear (north) – 8%, and
WHEREAS, The parking will be handled by two-car attached garages and
concrete/asphalt driveways with room for at least two (2) additional guests, and
WHEREAS, A landscaping plan has been submitted and is pending approval by the City
Forester.
THEREFORE BE IT RESOLVED, That the Plan Commission approves of the Building,
Site and Operation Plan submitted by Bower Design and Construction for a two-family
residential structure located in the SE ¼ of Section 3.
BE IT FURTHER RESOLVED, The proposed overhangs on this building only extend
one and a half feet and the resolution is written that they must be 2-feet or greater at
building permit time.
BE IT FURTHER RESOLVED, The percentages of masonry products must be
increased on the elevations to at least the following percentages by building permit
submittal:
Front – Around 30%+
Sides – Around 20%+
Rear – Around 25%+.
BE IT FURTHER RESOLVED, That this lot is required to keep at least 14,000 SF as
open space and said requirement will need to be reviewed at the time the building
permit is reviewed.
BE IT FURTHER RESOLVED, The landscape plan is subject to approval by the City
Forester prior to the release of building permits.
BE IT FURTHER RESOLVED, That a copy of said plans be kept on file in the Building
Department and that all aspect of this plan shall be maintained in perpetuity unless
otherwise authorized by the Plan Commission.
BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this
resolution shall result in the imposition of fines of $100 per day, the initiation of legal
action, or both.
Plan Commission
City of Muskego
Adopted: July 11, 2016
Defeated:
Deferred:
Introduced: July 11, 2016
ATTEST: Kellie McMullen, Recording Secretary