Loading...
PCR2016041 RESOLUTION #P.C. 041-2016 APPROVAL OF A BUILDING SITE AND OPERATION PLAN AND A THREE LOT CERTIFIED SURVEY MAP FOR STARZ DANCE ACADEMY LOCATED IN THE SE ¼ OF SECTION 5 (TAX KEY 2180.994.002 / RACINE AVENUE) WHEREAS, On May 24, 2016 a submittal was received from Keller Inc. for Starz Dance Academy for a property located along Racine Avenue (Tax Key No. 2180.994.002), and WHEREAS, The application includes a three (3) lot Certified Survey Map (CSM) and a Building, Site, and Operation Plan (BSO) for a new building for Starz Dance Academy, and WHEREAS, The petitioner is proposing to split the existing 10.39 acre lot into three (3) lots ranging in size from 3.11 acres to 4.04 acres, and WHEREAS, The land is currently zoned B-2 Local Service Center District, which requires minimum lot sizes of 20,000 square feet and minimum average widths of 100 feet per lot and the proposal is consistent with the plan, and WHEREAS, The 2020 Comprehensive Plan identifies this area as commercial land uses and the proposal is consistent with the plan, and WHEREAS, Lot 2 and Lot 3 will have access to Racine Avenue via an existing ingress/egress easement and via newly proposed access easements /driveway and Lot 1 will have access to Hillendale Drive or the existing internal ingress/egress easement, and WHEREAS, All lots will be served by municipal sewer and private water wells, and WHEREAS, A portion of this land was used for a landfill in the past and is over seen by the DNR, and WHEREAS, A new 9,735 square foot building is proposed for Starz Dance Academy on Lot 3 (southern lot), and WHEREAS, The dance center is looking to relocated to this new building from their current location in the Muskego Business Park to better fit their needs, and WHEREAS, The building is proposed to include six dance/class rooms, an office, a lobby, storage space, restrooms, and a changing area, and WHEREAS, The west façade (front) of the building is proposed to be comprised of the following materials/elements:  10-foot band of masonry brick on the lower portion of the wall  Cement board lap siding on the upper portion of the wall  Aluminum store front windows and entry door  Fiber cement wall panels around the windows  A gabled roof over the front entry  Five wavy corrugated metal shed roof features over the windows  A parapet wall to screen the metal roof, and WHEREAS, The north façade (side) of the building is proposed to be comprised of the following materials/elements:  Varying heights of masonry brick on the lower portion of the wall  Cement board lap siding on the upper portion of the wall  Aluminum store front windows  Fiber cement wall panels around the windows  One wavy corrugated metal shed roof features over the western set of windows  A parapet wall to screen the metal roof, and WHEREAS, The south façade (side) of the building is proposed to be comprised of cement board lap siding over metal vertical siding and will contain a parapet wall to screen the metal roof, and WHEREAS, The east façade (side) of the building is proposed to be comprised of vertical metal wall panel with no parapet wall, and WHEREAS, Per the Design Guides, the City typically likes to see four-sided architecture and/or 50% masonry on all visible facades, and WHEREAS, The current proposal includes the following masonry percenta ges:  West Façade - ~42%  North Façade - ~31%  South Façade - ~5%  East Façade - ~0% WHEREAS, The west and north elevation will be completely visible, the east elevation is be partially visible (from the new access driveway), and the south elevation will not be visible, as long as vegetation screening remains, and WHEREAS, The applicant has stated that all mechanicals will all be ground mounted, not roof mounted, and WHEREAS, There are currently 30 parking stalls proposed along with a drop -off lane and the applicant believes this is sufficient for their need, and WHEREAS, Indoor recreation areas and customer service establishments require 1 stall per 150 SF of customer area and using the proposed class/dance room space only, approximately 43 parking stalls m ay be needed per code, and WHEREAS, There is an area shown for possible future parking location expansion and a possible future building addition, and WHEREAS, No signage details, landscape plans, or lighting details/photometric plans have been provided at this time, and WHEREAS, The majority of the Starz site is shown as being curbed, but the south and west sides currently are proposed with no curbing, and WHEREAS, The entry drive to this site from the existing shared access driveway is not shown with curbing since the existing shared access driveway is not curbed, and WHEREAS, Significant grading is proposed on Lots 2 and 3 to prep the sites for construction, as well as to construct the access driveway, the stormwater pond, and the necessary swales/grading, and WHEREAS, The site plans show a future building and parking lot to the north of the Starz building (on Lot 2) but this project is a possible future project that is not receiving approvals at this time. THEREFORE BE IT RESOLVED, That the Plan Commission approves of a Building, Site and Operation Plan and three lot Certified Survey Map from Keller Inc. for Starz Dance Academy located along Racine Avenue (Tax Key No. 2180.994.002). BE IT FURTHER RESOLVED, That the proposed plans must be reviewed by the Fire Department as soon as possible and any changes they may require to the site plan, CSM, and/or access easements must be made, including the possible widening/altering of driveways and/or parking areas. BE IT FURTHER RESOLVED, The eastern façade needs to be altered to be covered with cement board lap siding, as is being proposed on the south elevation, to keep some consistency on all facades of the building. BE IT FURTHER RESOLVED, Details must be provided before the issuance of building permits showing the exact placement of any mechanicals (HVAC, transformers, etc.) and a plan on how they will be screened from view. BE IT FURTHER RESOLVED, Curbing must be added to the south side of the Starz parking lot (with a curb opening for drainage as needed). BE IT FURTHER RESOLVED, The west side of the parking lot can remain un -curbed since this area is planned for future parking but once the parking lot is expanded the new parking area must then be curbed to match the rest of the site. BE IT FURTHER RESOLVED, No outdoor storage or display will be allowed on site. BE IT FURTHER RESOLVED, A formal landscape plan must be provided as part of the Building Permit review. BE IT FURTHER RESOLVED, Any site/exterior building lighting must meet the Zoning Code’s lighting requirements and lighting details and a photometric plan must be approved by the City and details of such lighting must be provided as part of Building Permit review. BE IT FURTHER RESOLVED, All dumpsters/recycle bins must be located within the proposed existing trash enclosure and said enclosure details must be submitted at the time of Building Permit review. BE IT FURTHER RESOLVED, Any signage (temporary or permanent) will require separate permits. BE IT FURTHER RESOLVED, Any bollards must be painted to match the color of the building. BE IT FURTHER RESOLVED, A Plat of Survey stamped by a Professional Land Surveyor showing the proposed building location must be submitted as part of the Building Permit review. BE IT FURTHER RESOLVED, Since there was a former landfill on portions of this land, the DNR will need to sign off on any construction of buildings and grading of the site before any work can begin on the properties. BE IT FURTHER RESOLVED, Since there are residential properties to the south and southeast of this proposed development, existing vegetation buffers need to remain along certain lot lines to ensure screening and visual separation between the new developments and the surrounding residential properties as follows:  20-foot buffer along the south side of Lot 3  60-foot buffer along the east side of Lot 3  20-foot buffer along the south side of Lot 1 BE IT FURTHER RESOLVED, The above noted buffer areas should not be graded within and should not have any vegetation removed within. BE IT FURTHER RESOLVED, The emergency overflow for the stormwater pond cannot discharge onto adjacent properties and the location/flow of said emergency overflow should be directed to Hillendale Drive. BE IT FURTHER RESOLVED, A detailed phase plan needs to be submitted before the issuance of Building Permits to show how and what grading and site development will occur at different stages of the project. BE IT FURTHER RESOLVED, No Building Permits can be issued until the CSM is recorded. BE IT FURTHER RESOLVED, That all CSM review technical corrections from the City will need to be addressed before the Certified Survey Map can be signed and recorded. BE IT FURTHER RESOLVED, That a digital file of this CSM shall be submitted to the City in accordance with Common Council Ordinance No. 1118 and Resolution 196-2002. BE IT FURTHER RESOLVED, A copy of said plans must be kept on file and that all aspects of this plan shall be maintained in perpetuity unless otherwise authorized by the Plan Commission. BE IT FURTHER RESOLVED, Failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: Denied: Deferred: Introduced: June 7, 2016 ATTEST: Kellie McMullen, Recording Secretary