Loading...
PCR2015052 RESOLUTION #P.C. 052-2015 APPROVAL OF A BUILDING SITE AND OPERATION PLAN AMENDMENT FOR 4FRONT ENGINEERED SOLUTIONS LOCATED IN THE NW ¼ OF SECTION 16 (TAX KEY 2222.984.006 / W183 S8253 RACINE AVE) WHEREAS, On September 21, 2015 a submittal was received from 4Front Engineered Solutions for their property located at W183 S8253 Racine Avenue (Tax Key No. 2222.984.006), and WHEREAS, The petitioner is proposing to alter portions of their parking lots and add on 15,000 SF to their main structure in order to meet the needs of their growing business, and WHEREAS, The proposal includes the following modifications:  Add on a new 10,770 square foot parking lot to the front of their building along Racine Avenue and the parking lot to meet city codes of a 24-foot wide drive aisle and have parking stalls meet the 10’x20’ requirements,  Removal of 4,700 square feet of asphalt along their northern parking lot area and this will be returned to greenspace and is required in order for the proposed development to avoid stormwater management at this time,  Add on a 15,000 square foot addition to the north half of the existing structure. Said addition is proposed to be CMU split face block along the bottom and pre -finished insulated metal panel along the top portion of the facades, and WHEREAS, If over a half acre of impervious surface is added to a development said development would require stormwater management and the proposed development does not trigger stormwater management at this time but future development will most l ikely necessitate stormwater management. THEREFORE BE IT RESOLVED, That the Plan Commission approves of an amended Building, Site and Operation Plan for 4Front Engineered Solutions located at W183 S8253 Racine Avenue (Tax Key No. 2222.984.006). BE IT FURTHER RESOLVED, That a landscape plan approval for the new parking lot is required before the issuance of the addition building permits. BE IT FURTHER RESOLVED, That no outdoor storage or display will be allowed on site once the new structure is in use, unless specific Plan Commission approvals are granted in the future for any storage. BE IT FURTHER RESOLVED, Any exterior lighting will need specific approval from the Planning Division before installation and said approval may require a photometric plan. BE IT FURTHER RESOLVED, Any new signage (temporary or permanent) will require a separate permit. BE IT FURTHER RESOLVED, That all parking stalls must be marked at least 10’x20’ in size and all driveways must be at least 24 feet wide. BE IT FURTHER RESOLVED, That WE Energies approvals are required for any parking encroachments within any Utility Easements. BE IT FURTHER RESOLVED, That the final Landscape Plan must be approved prior to the issuance of Building Permits. BE IT FURTHER RESOLVED, That the final plans for the building permit will be reviewed by the Fire Department and any changes they may require must be made, including the possible widening of driveways. BE IT FURTHER RESOLVED, That a copy of said plans be kept on file and that all aspects of this plan shall be maintained in perpetuity unless otherwise authorized by the Plan Commission. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the in itiation of legal action, or both. Plan Commission City of Muskego Adopted: October 6, 2015 Denied: Deferred: Introduced: October 6, 2015 ATTEST: Kellie McMullen, Recording Secretary