Loading...
PCR2015020new RESOLUTION #P.C. 020-2015 APPROVAL FOR A BSO AMENDMENT FOR ATONEMENT LUTHERAN CHURCH LOCATED IN THE SE ¼ OF SECTION 3 (S70 W16244 MARTIN DRIVE / TAX KEY NO. 2172.095) WHEREAS, A BSO amendment request has been submitted by Sean Maher on behalf of Atonement Lutheran Church located at S70 W16244 Martin Drive, and WHEREAS, The petitioners request is to create a new outdoor worship space involving the following items:  Relocate the existing garage to a new location on the property  Install paver paths and paver patio  Install bleacher type seating  Construct a pergola/trellis over the presentation area  Install a fire pit  Construct a small structure to house audio equipment  Construct column foundations for posts with fabric sunshades, and WHEREAS, Additional site improvements include the following:  Construct an outdoor Columbarium  Construct a memory garden  Construct walking path that connect these various outdoor features  Install a parking lot addition  Expand the outdoor playground area, and WHEREAS, The proposed alterations will allow the space to better meet the current needs of the church, and WHEREAS, A landscape plan has been submitted and is pending review, and WHEREAS, No new outdoor lighting is proposed at this time and any future lighting additions/changes will require Planning Division approvals. THEREFORE BE IT RESOLVED, That the Plan Commission approves the BSO amendment for Atonement Lutheran Church located at S70 W16244 Martin Drive for the site improvements noted above. BE IT FURTHER RESOLVED, All items noted above will require proper permits from the City and further details may need to be provided at that time to ensure compliance with the codes. BE IT FURTHER RESOLVED, The proposed fire pit must be located at least 25’ from any structure or combustible material per City codes. BE IT FURTHER RESOLVED, That a more detailed parking lot diagram must be submitted to make sure that all two-way drive lanes are at least 24’ wide and to make sure all new parking stalls meet the City’s 10’ x 20’ size requirement. BE IT FURTHER RESOLVED, If phasing is going to occur with this project, details of the specific phasing must be provided before any permits can be issued and before any work can occur on site. BE IT FURTHER RESOLVED, All proposed grading work and stormwater management must receive final approvals from the Engineering Department before any construction can occur. Plan Commission City of Muskego Adopted: Defeated: Deferred: Introduced: April 7, 2015 ATTEST: Kellie McMullen, Recording Secretary