Loading...
PCR2013046RESOLUTION #P.C.046-2013 APPROVAL OF A TWO-FAMILY RESIDENTIAL STRUCTURE LOCATED IN THE NW ¼ OF SECTION 15 (LOT 8 BOEHM COURT / TAX KEY NO. 2218.008) WHEREAS, On September 15, 2013 plans were submitted by Paul Van Alstine for the approval of a two (2) two-family residential structure located in the NW ¼ of Section 15 (Lot 9 – Boehm Court / Tax Key No. 2218.008), and WHEREAS, Said property is currently zoned RM-3 Multiple Family Residence and said use is a permitted use with Plan Commission approval, and W HEREAS, The proposed (2) two-family dwelling on this property meets the requirements of the zoning ordinance in accordance to the setbacks, offsets, open space, height, and floor area ratio, etc., and WHEREAS, Said parcel will be serviced by public sewer and public water facilities, and WHEREAS, Said property is subject to the design standards outlined in the City of Muskego’s General Design Guide, and WHEREAS, The structure is proposed to be constructed with exterior materials which include hardi-plank siding, shake siding, cultured stone, aluminum soffits and fascia, and dimensional asphalt shingles, and WHEREAS, The structure is designed to look like a typical new home and this should fit well within this existing neighborhood and meet or exceed the designs in that area, and WHEREAS, Each unit is about 1,704 square feet in size with three bedrooms, two and a half bathrooms, and each unit also has a basement, a kitchen, a utility room, and a great room, and WHEREAS, A landscape plan has been submitted for this lot, and WHEREAS, The parking will be handled by a two-car attached garage for each unit along with a large driveway for parking for numerous guests for each unit, and WHEREAS, The driveway is proposed to encroach into the side yard Storm Sewer Easement. THEREFORE BE IT RESOLVED, That the Plan Commission approves the 2-family residential structure submitted by Paul Van Alstine located in the NW ¼ of Section 15 (Lot 8 – Boehm Court / Tax Key No. 2218.008). BE IT FURTHER RESOLVED, That the driveway cannot be located over the catch basin within the Storm Sewer Easement and all drainage must still flow into said catch basin. BE IT FURTHER RESOLVED, That a revocable occupancy permit will be required for the portion of the driveway located within the Storm Sewer Easement before permit can be issued for the construction of the home. BE IT FURTHER RESOLVED, That the landscaping shown on the approved landscape plan must be installed before occupancy can be granted for either unit within the building. BE IT FURTHER RESOLVED, That any garbage/recycle containers must be kept within the garages of the units. BE IT FURTHER RESOLVED, That all mechanical devices need to be screened with landscaping or other screening devices. BE IT FURTHER RESOLVED, That a copy of said plans be kept on file in the Community Development Department and that all aspect of this plan shall be maintained in perpetuity unless otherwise authorized by the Plan Commission. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: October 1, 2013 Defeated: Deferred: Introduced: October 1, 2013 ATTEST: Kellie McMullen, Recording Secretary