Loading...
PCR2012048 RESOLUTION #P.C. 048-2012 APPROVAL OF A BUILDING SITE AND OPERATION PLAN AMENDMENT FOR SPECTRUM ALUMINUM FINISHING LOCATED IN THE NW ¼ OF SECTION 16 (TAX KEY 2221.014 / S80 W18753 APOLLO DR) WHEREAS, On September 18, 2012 a submittal was received from Spectrum Aluminum Finishing for their property located at S80 W18753 Apollo Drive (Tax Key No. 2221.014), and WHEREAS, A new 50x64 accessory structure is proposed in the fenced in area that is at the rear of the main building and this building will be used for storage of materials and supplies, and WHEREAS, The new accessory structure will be clad with steel walls (ivory) and a steel roof (ivory), and WHEREAS, The General Design Guide calls for principal structures to be 50% masonry at Planning Commission discretion. THEREFORE BE IT RESOLVED, That the Plan Commission approves of a n amended Building, Site and Operation Plan for Spectrum Finishing located at S80 W18753 Apollo Drive (Tax Key No. 2221.014). BE IT FURTHER RESOLVED, That a copy of said plans be kept on file and that all aspects of this plan shall be maintained in perpetuity unless otherwise authorized by the Plan Commission. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: October 2, 2012 Denied: Deferred: Introduced: October 2, 2012 ATTEST: Kellie McMullen, Recording Secretary