Loading...
CCR2021057-AttachmentCompliance Maintenance Annual Report Muskego Sewage Collection System Last Updated:Reporting For: 6/16/2021 2020 Financial Management 1.Provider of Financial Information Name: Scott Kloskowski Telephone: 262 679 4128 (XXX) XXX-XXXX E-Mail Address (optional): skloskowski@cityofmuskego.org 2.Treatment Works Operating Revenues 2.1 Are User Charges or other revenues sufficient to cover O&M expenses for your wastewater treatment plant AND/OR collection system ? Yes (0 points) No (40 points) If No,please explain: 2.2 When was the User Charge System or other revenue source(s)last reviewed and/or revised? Year: 2020 0-2 years ago (0 points) 3 or more years ago (20 points) N/A (private facility) 2.3 Did you have a special account (e.g.,CWFP required segregated Replacement Fund,etc.)or financial resources available for repairing or replacing equipment for your wastewater treatment plant and/or collection system? Yes (0 points) No (40 points) 0 REPLACEMENT FUNDS [PUBLIC MUNICIPAL FACILITIES SHALL COMPLETE QUESTION 3] 3.Equipment Replacement Funds 3.1 When was the Equipment Replacement Fund last reviewed and/or revised? Year: 2020 1-2 years ago (0 points) 3 or more years ago (20 points) N/A If N/A,please explain: 3.2 Equipment Replacement Fund Activity 3.2.1 Ending Balance Reported on Last Year's CMAR $906,466.28 3.2.2 Adjustments -if necessary (e.g.earned interest, audit correction,withdrawal of excess funds,increase making up previous shortfall,etc.) +$30,745.10 3.2.3 Adjusted January 1st Beginning Balance $937,211.38 3.2.4 Additions to Fund (e.g.portion of User Fee, earned interest,etc.)+$0.00 Compliance Maintenance Annual Report Muskego Sewage Collection System Last Updated:Reporting For: 6/16/2021 2020 3.2.5 Subtractions from Fund (e.g.,equipment replacement,major repairs -use description box 3.2.6.1 below*)-$0.00 3.2.6 Ending Balance as of December 31st for CMAR Reporting Year $937,211.38 All Sources:This ending balance should include all Equipment Replacement Funds whether held in a bank account(s),certificate(s)of deposit,etc. 3.2.6.1 Indicate adjustments,equipment purchases,and/or major repairs from 3.2.5 above. None 3.3 What amount should be in your Replacement Fund?$215,000.00 Please note:If you had a CWFP loan,this amount was originally based on the Financial Assistance Agreement (FAA)and should be regularly updated as needed.Further calculation instructions and an example can be found by clicking the SectionInstructions link under Info header in the left-side menu. 3.3.1 Is the December 31 Ending Balance in your Replacement Fund above,(#3.2.6)equal to,or greater than the amount that should be in it (#3.3)? Yes No If No,please explain. 0 4.Future Planning 4.1 During the next ten years,will you be involved in formal planning for upgrading,rehabilitating, or new construction of your treatment facility or collection system? Yes - If Yes, please provide major project information, if not already listed below. No Project # Project Description Estimated Cost Approximate Construction Year 1 Replace VFD's and controls-Loomis Rd LS 50000 2018 2 Replace VFD's and controls-Woods Rd LS 70000 2019 3 Replace controls Sobek La Lift Station 30000 2020 4 Replace controls Kurtze La Lift Station 50000 2021 5 Replace controls North Shore LS 30000 2019 6 Replace lighting at large lift stations with LED lights 30000 2020 5.Financial Management General Comments ENERGY EFFICIENCY AND USE 6.Collection System 6.1 Energy Usage 6.1.1 Enter the monthly energy usage from the different energy sources: COLLECTION SYSTEM PUMPAGE: Total Power Consumed Number of Municipally Owned Pump/Lift Stations: 28 Compliance Maintenance Annual Report Muskego Sewage Collection System Last Updated:Reporting For: 6/16/2021 2020 Electricity Consumed (kWh) Natural Gas Consumed (therms) January 98,274 189 February 84,511 153 March 99,517 154 April 81,478 121 May 118,061 32 June 65,291 83 July 76,210 30 August 53,879 17 September 54,900 71 October 60,062 91 November 58,683 90 December 37,755 134 Total 888,621 1,165 Average 74,052 97 6.1.2 Comments: 6.2 Energy Related Processes and Equipment 6.2.1 Indicate equipment and practices utilized at your pump/lift stations (Check all that apply): Comminution or Screening Extended Shaft Pumps Flow Metering and Recording Pneumatic Pumping SCADA System Self-Priming Pumps Submersible Pumps Variable Speed Drives Other: Replaced all lighting with LED's. 6.2.2 Comments: 6.3 Has an Energy Study been performed for your pump/lift stations? No Yes Year: By Whom: Describe and Comment: Compliance Maintenance Annual Report Muskego Sewage Collection System Last Updated:Reporting For: 6/16/2021 2020 6.4 Future Energy Related Equipment 6.4.1 What energy efficient equipment or practices do you have planned for the future for your pump/lift stations? Total Points Generated 0 Score (100 -Total Points Generated)100 Section Grade A Compliance Maintenance Annual Report Muskego Sewage Collection System Last Updated:Reporting For: 6/16/2021 2020 Sanitary Sewer Collection Systems 1.Capacity,Management,Operation,and Maintenance (CMOM)Program 1.1 Do you have a CMOM program that is being implemented? Yes No If No,explain: 1.2 Do you have a CMOM program that contains all the applicable components and items according to Wisc.Adm Code NR 210.23 (4)? Yes No (30 points) N/A If No or N/A,explain: 1.3 Does your CMOM program contain the following components and items?(check the components and items that apply) Goals [NR 210.23 (4)(a)] Describe the major goals you had for your collection system last year: Properly manage,operate and maintain all parts of collection system,Provide adequate capacity to convey base and peak flows,prevent and mitigate impacts of SSOs,Provide notification to those with reasonable potential for exposure to pollutants associated with SSOs Did you accomplish them? Yes No If No,explain: Organization [NR 210.23 (4) (b)] Does this chapter of your CMOM include: Organizational structure and positions (eg. organizational chart and position descriptions) Internal and external lines of communication responsibilities Person(s) responsible for reporting overflow events to the department and the public Legal Authority [NR 210.23 (4) (c)] What is the legally binding document that regulates the use of your sewer system? Sewer use ordinance If you have a Sewer Use Ordinance or other similar document,when was it last reviewed and revised?(MM/DD/YYYY)2003-05-22 Does your sewer use ordinance or other legally binding document address the following: Private property inflow and infiltration New sewer and building sewer design, construction, installation, testing and inspection Rehabilitated sewer and lift station installation, testing and inspection Sewage flows satellite system and large private users are monitored and controlled,as necessary Fat, oil and grease control Enforcement procedures for sewer use non-compliance Operation and Maintenance [NR 210.23 (4) (d)] Does your operation and maintenance program and equipment include the following: Equipment and replacement part inventories Up-to-date sewer system map Compliance Maintenance Annual Report Muskego Sewage Collection System Last Updated:Reporting For: 6/16/2021 2020 A management system (computer database and/or file system)for collection system information for O&M activities,investigation and rehabilitation A description of routine operation and maintenance activities (see question 2 below) Capacity assessment program Basement back assessment and correction Regular O&M training Design and Performance Provisions [NR 210.23 (4) (e)] What standards and procedures are established for the design,construction,and inspection of the sewer collection system,including building sewers and interceptor sewers on private property? State Plumbing Code, DNR NR 110 Standards and/or local Municipal Code Requirements Construction, Inspection, and Testing Others: Overflow Emergency Response Plan [NR 210.23 (4) (f)] Does your emergency response capability include: Responsible personnel communication procedures Response order, timing and clean-up Public notification protocols Training Emergency operation protocols and implementation procedures Annual Self-Auditing of your CMOM Program [NR 210.23 (5)] Special Studies Last Year (check only those that apply): Infiltration/Inflow (I/I) Analysis Sewer System Evaluation Survey (SSES) Sewer Evaluation and Capacity Managment Plan (SECAP) Lift Station Evaluation Report Others: 0 2.Operation and Maintenance 2.1 Did your sanitary sewer collection system maintenance program include the following maintenance activities?Complete all that apply and indicate the amount maintained. Cleaning 6 % of system/year Root removal 1 % of system/year Flow monitoring 100 % of system/year Smoke testing 0 % of system/year Sewer line televising 4.9 % of system/year Manhole inspections 7 % of system/year Lift station O&M 52 # per L.S./year Manhole rehabilitation 0 % of manholes rehabbed Mainline rehabilitation 0 % of sewer lines rehabbed Private sewer inspections 0 % of system/year Compliance Maintenance Annual Report Muskego Sewage Collection System Last Updated:Reporting For: 6/16/2021 2020 Private sewer I/I removal 0 % of private services River or water crossings 0 % of pipe crossings evaluated or maintained Please include additional comments about your sanitary sewer collection system below: 10 Houses that were backed up was due to a boot in a manhole that blew out from a rain event. 6 houses that were backed up was due to a MH adjusting ring that was busted and fell in bottom of MH. 3.Performance Indicators 3.1 Provide the following collection system and flow information for the past year. 68.4 Total actual amount of precipitation last year in inches 39.5 Annual average precipitation (for your location) 153 Miles of sanitary sewer 28 Number of lift stations 0 Number of lift station failures 0 Number of sewer pipe failures 16 Number of basement backup occurrences 16 Number of complaints 3.4 Average daily flow in MGD (if available) 5.4 Peak monthly flow in MGD (if available) 14.4 Peak hourly flow in MGD (if available) 3.2 Performance ratios for the past year: 0.00 Lift station failures (failures/year) 0.00 Sewer pipe failures (pipe failures/sewer mile/yr) 0.00 Sanitary sewer overflows (number/sewer mile/yr) 0.10 Basement backups (number/sewer mile) 0.10 Complaints (number/sewer mile) 1.6 Peaking factor ratio (Peak Monthly:Annual Daily Avg) 4.2 Peaking factor ratio (Peak Hourly:Annual Daily Avg) 4.Overflows LIST OF SANITARY SEWER (SSO)AND TREATMENT FACILITY (TFO)OVERFLOWS REPORTED ** Date Location Cause Estimated Volume None reported **If there were any SSOs or TFOs that are not listed above,please contact the DNR and stop work on this section until corrected. 5.Infiltration /Inflow (I/I) 5.1 Was infiltration/inflow (I/I)significant in your community last year? Yes No If Yes,please describe: Compliance Maintenance Annual Report Muskego Sewage Collection System Last Updated:Reporting For: 6/16/2021 2020 5.2 Has infiltration/inflow and resultant high flows affected performance or created problems in your collection system,lift stations,or treatment plant at any time in the past year? Yes No If Yes,please describe: 5.3 Explain any infiltration/inflow (I/I)changes this year from previous years: Nothing has changed 5.4 What is being done to address infiltration/inflow in your collection system? When we find leaks we fix them Total Points Generated 0 Score (100 -Total Points Generated)100 Section Grade A Compliance Maintenance Annual Report Muskego Sewage Collection System Last Updated:Reporting For: 6/16/2021 2020 Grading Summary WPDES No: 0047341 SECTIONS LETTER GRADE GRADE POINTS WEIGHTING FACTORS SECTION POINTS Financial A 4 1 4 Collection A 4 3 12 TOTALS 4 16 GRADE POINT AVERAGE (GPA)=4.00 Notes: A = Voluntary Range (Response Optional) B = Voluntary Range (Response Optional) C = Recommendation Range (Response Required) D = Action Range (Response Required) F = Action Range (Response Required) Compliance Maintenance Annual Report Muskego Sewage Collection System Last Updated:Reporting For: 6/16/2021 2020 Resolution or Owner's Statement Name of Governing Body or Owner: City of Muskego common council Date of Resolution or Action Taken: 2021-06-22 Resolution Number: Date of Submittal: ACTIONS SET FORTH BY THE GOVERNING BODY OR OWNER RELATING TO SPECIFIC CMAR SECTIONS (Optional for grade A or B.Required for grade C,D,or F): Financial Management:Grade =A Collection Systems:Grade =A (Regardless of grade,response required for Collection Systems if SSOs were reported) ACTIONS SET FORTH BY THE GOVERNING BODY OR OWNER RELATING TO THE OVERALL GRADE POINT AVERAGE AND ANY GENERAL COMMENTS (Optional for G.P.A.greater than or equal to 3.00,required for G.P.A.less than 3.00) G.P.A.=4.00