Loading...
CCR2019013-Public Improvements4Front COMMON COUNCIL – CITY OF MUSKEGO RESOLUTION #013-2019 DEDICATION AND ACCEPTANCE OF PUBLIC IMPROVEMENTS FOR 4FRONT ENGINEERED SOLUTIONS, INC. WHEREAS, 4Front Engineered Solutions, Inc., hereafter called “DEVELOPER” has constructed public improvements at W183 S8253 Racine Avenue including all water distribution and paving including any and all equipment and appurtenances which may in any way be a part thereof or pertain to, in and for the improvements at W183 S8253 Racine Avenue; and WHEREAS, the DEVELOPER has completed the construction and installation of the following improvements: Water Main: Gemini Court including east and west easements 165 LF at $38.00/LF of 6” C900 water main 30 LF at $40.00/LF of 8” C900 water main 1 Each at $720.00/Each of 8”x8” Cross 1 Each at $525.00/Each of 8” plug and buttress with 1” air release valve 1 Each at $1,180.00/Each of 8” butterfly valve and box 1 Each at $810.00/Each of 8” gate valve and box 1 Each at $165.00/Each of 8”x6” reducer 1 Each at $3,250.00/Each of hydrant 1 Each at $1,625.00/Each of salvaged hydrant Total – Water Main at Gemini Court including east and west easements $15,745.00 Water Main: On-site easement extended from Racine Avenue 70 LF at $40.00/LF of 8” C900 water main 352 LF at 62.00/LF of 8” PVC water main directionally bored 1 Each at $3,350.00/Each of 8”x16” wet tap connection with 8” gate valve 1 Each at $380.00/Each of 8”x6” anchor tee 1 Each at $165.00/Each of 8”x6” reducer 2 Each at $3,250.00/Each of salvaged hydrant Total – Water Main at on-site easement extended from Racine Avenue $35,019.00 Paving: Gemini Court 2,010 SY at $9.50/SY of 12” of crushed limestone base 2,010 SY at $12.20/SY of 4” of binder asphalt course lift 2,010 SY at $5.10/SY of 1-1/2” of surface asphalt surface course 1 Each at $2,500.00/Each of light pole removal and replacement Resolution #013-2019 2 Total - Paving $56,368.00 and appurtenances (collectively called “IMPROVEMENTS”) in accordance with the provision of Chapter 18 of the Municipal Code of the City of Muskego, hereafter called the “CITY”, and the City Engineer has certified the systems’ acceptability; and WHEREAS, it is the Developer’s intent to, without charge to the CITY, unconditionally give, grant, convey and fully dedicate the IMPROVEMENTS to the CITY, free and clear of all encumbrances, and together with mains, conduits, pipes, plants, machinery, equipment and appurtenances which relate directly to the utilization of such IMPROVEMENTS; and WHEREAS, the DEVELOPER shall guarantee the public improvements to be dedicated against any defects due to faulty materials or workmanship which appear within a period of one (1) year from the date of dedication and shall pay for any damages resulting therefrom to the CITY property and shall indemnify the CITY against any claims, suits, or liabilities brought against the CITY at any time arising out of the alleged defects or other failure of this guarantee; and NOW, THEREFORE, BE IT RESOLVED That the Common Council of the City of Muskego, upon the recommendation of the Finance Committee, does hereby accept dedication and acceptance of the public improvements in and for the 4Front Engineered Solutions, Inc. at W183 S8253 Racine Avenue, Muskego, WI. ND DATED THIS 22 DAY OF JANUARY, 2019 SPONORED BY: FINANCE COMMITTEE This is to certify that this is a true and accurate copy of Resolution #013-2019 which was adopted by the Common Council of the City of Muskego. _____________________________ Sharon Mueller, City Clerk-Treasurer