Loading...
CCR2018068-Reimbursement Jewell Homes COMMON COUNCIL - CITY OF MUSKEGO RESOLUTION #068-2018 APPROVAL OF REIMBURSEMENT TO JEWELL HOMES FOR HILLENDALE SANITARY PRESSURE SEWER WHEREAS, Two parcels on Hillendale Drive are part of a development project by Jewell Homes; and WHEREAS, As a result of the project, the City of Muskego required the existing sanitary pressure sewer to be extended by Jewell Homes to serve both parcels as well as possible additional parcels; and WHEREAS, During the review of the project, the City became aware that the existing pressure sewer was reduced from a 2-inch diameter pipe to a 1 1/4-inch diameter pipe. No past documents or records exist to substantiate the reasons for the reduction in size. Pursuant to a sewer study that was done, the existing 1 1/4-inch pipe did not have the capacity to handle the proposed development and possible future development along Hillendale Drive; and WHEREAS, The City required Jewell Homes to relay the existing pressure sewer during its design and construction to account for this issue; and WHEREAS, The City agreed to reimburse Jewell Homes for the additional costs in order to allow the proposed parcels to be built; and WHEREAS, Following construction of the sanitary pressure sewer, the City agreed to reimburse Jewell Homes a total of $19,680.44 for the engineering, construction and inspection of the proposed sanitary pressure sewer due to the existing system not having enough capacity; and WHEREAS, The Finance Committee has reviewed the proposed reimbursement and recommends approval to the Common Council. NOW, THEREFORE, BE IT RESOLVED That the Common Council of the City of Muskego, upon the recommendation of the Finance Committee, does hereby approve the reimbursement to Jewell Homes in the amount of $19,680.44. TH DATED THIS 28DAY OF AUGUST, 2018. SPONSORED BY: FINANCE COMMITTEE This is to certify that this is a true and accurate copy of Resolution #068-2018 which was adopted by the Common Council of the City of Muskego. Clerk-Treasurer 7/18jmb