Loading...
CCR2018007-Improvements-Edgewater COMMON COUNCIL – CITY OF MUSKEGO RESOLUTION #007-2018 DEDICATION OF PUBLIC IMPROVEMENTS FOR EDGEWATER HEIGHTS (Phase II) SUBDIVISION WHEREAS, Edgewater Heights, LLC, hereafter called “DEVELOPER” has constructed public improvements in and around Racine Ave and Edgewater Heights Way including all water distribution, sanitary sewers, storm sewers, and paving including any and all equipment and appurtenances which may in any way be a part thereof or pertain to, in and for the Edgewater Heights (Phase II) Subdivision; and WHEREAS, the DEVELOPER has completed the construction and installation of the following improvements: Sanitary Sewer 305 LF at $23.00/LF of 2” HDPE Sanitary Force Main 711 LF at $24.00/LF 3” HDPE Sanitary Force Main 775 LF at $48.00/LF 1 ½” HDPE Sanitary Lateral 1 Each at $1,100/Each 3” Valve and Box 2 Each at $1,200/Each Flushing Station 1 Each at $3,900 Connection to Ex. Force Main Total – Sanitary Sewer/Force Main $69,714.00 Water Main 32 LF at $74.00/LF of 6” C900 Water Main 1,125 LF at $$68.00/LF of 8” C900 Water Main 125 LF at $150.00/LF of Directionally Drill 8” Water Main 687 LF at $50.00/LF of 1 ¼” HDPE Water Service 3 Each at $1250.00/Each of 6” Valve and Box 2 Each at $1500.00/Each of 8” Valve and Box 3 Each at $3600.00/Each of Hydrant 1 Each at $4,400.00/Each of Connection to Ex. Water Main Total – Water Main $153,918.00 Storm Sewer 864 LF at $37.00/LF of 6” PVC Storm Sewer 991 LF at $$42.00/LF of 12” RCP Storm Sewer 447 LF at $45.00/LF of 15” RCP Storm Sewer 305 LF at $54.00/LF of 18” RCP Storm Sewer 6 Each at $900.00/Each of 12” End Section 11 Each at $2,000.00/Each of 24”x36” Inlet 9 Each at $2,300.00/Each of 48” Storm MH 2 Each at $2,200.00/Each of Pond Outlet Structure 6 Each at $840.00/Each of Rip Rap at End Sections Total – Storm Sewer $167,715.00 Paving 2,900 LF at $10.15/LF of 30” Mountable Curb and Gutter 4,600 SY of 8” Stone and 3.5” Binder 170 SY 3’ Stone Shoulder Total - Paving $124,885.00 and appurtenances (collectively called “IMPROVEMENTS”) in accordance with the provision of Chapter 18 of the Municipal Code of the City of Muskego, hereafter called the “CITY”, and the City Engineer has certified the systems’ acceptability; and WHEREAS, it is the Developer’s intent to, without charge to the CITY, unconditionally give, grant, convey and fully dedicate the IMPROVEMENTS to the CITY, free and clear of all encumbrances, and together with mains, conduits, pipes, plants, machinery, equipment and appurtenances which relate directly to the utilization of such IMPROVEMENTS; and WHEREAS, the DEVELOPER shall guarantee the public improvements to be dedicated against any defects due to faulty materials or workmanship which appear within a period of one (1) year from the date of dedication and shall pay for any damages resulting therefrom to the CITY property and shall indemnify the CITY against any claims, suits, or liabilities brought against the CITY at any time arising out of the alleged defects or other failure of this guarantee; and WHEREAS, the DEVELOPER must complete the installation of the final lift of asphalt on all roadways per subdivider’s agreement and said work will be considered dedicated and accepted upon written notification by the City Engineer; and NOW, THEREFORE, BE IT RESOLVED That the Common Council of the City of Muskego, upon the recommendation of the Finance Committee, does hereby accept dedication and acceptance of the public improvements in and for the Edgewater Heights (Phase II) Subdivision. DATED THIS 23rd DAY OF JANUARY, 2018 SPONORED BY: FINANCE COMMITTEE This is to certify that this is a true and accurate copy of Resolution #007-2018 which was adopted by the Common Council of the City of Muskego. _____________________________ Clerk-Treasurer