Bids-City HallBid Tabulation ZAS #150099.00 CONTRACTOR Scherrer Absolute Reichel JH Hassinger Peter Schwabe Bond Guarantee Furnished? Y/N Y Y Y Y Y Addenda Recognized? Y/N Y Y Y Y Y Bid Form Signed? Y/N Y Y Y Y Y Base Bid $ 5,961,698.00 $ 5,951,000.00 $ 5,923,000.00 $ 6,166,000.00 $ 6,274,347.00 Alternate No. 1 $ (9,800.00) $ (10,000.00) $ (10,000.00) $ (9,500.00) $ (12,640.00) Alternate No. 2 $ (730.00) $ (900.00) $ (936.00) $ (700.00) $ (4,500.00) Alternate No. 3 $ (1,250.00) $ (1,250.00) $ (1,000.00) $ (1,000.00) $ (2,400.00) Alternate No. 4 $ (82,000.00) $ (50,000.00) $ (10,000.00) $ (12,000.00) $ (81,754.00) Alternate No. 5 $ (144,500.00) $ (140,000.00) $ (1,000.00) $ - $ (144,666.00) Alternate No. 6 $ (35,000.00) $ (60,000.00) $ (68,000.00) $ (30,000.00) $ (68,814.00) Alternate No. 7 $ (47,800.00) $ (40,000.00) $ (14,000.00) $ (35,000.00) $ (48,854.00) Alternate No. 8 $ (36,200.00) $ (36,275.00) $ (39,000.00) $ (45,000.00) $ (48,600.00) Alternate No. 9 $ (70,000.00) $ (42,400.00) $ (60,000.00) $ (70,000.00) $ - Alternate No. 10 $ 14,500.00 $ 15,000.00 $ 25,000.00 $ 28,000.00 $ 20,700.00 Unit Price No. 1 $ 23.00 $ 24.00 $ 15.00 $ 21.00 $ 14.00 Remove all cameras and access control devices. Replace APTF-1 and APTF-2 with colored concrete. Remove all aluminum sunshades. Remove all landscaping. Add landscape irrigation system. Muskego City Hall Bid Opening 3/30/2017 Replace light fixture types AC3, AC4, AC6 and AC7 with type AR. Delete folding wall in room C110. Replace type SS-1 window sills with type PL-3. Height of APW-1, APW-2 and APW-3 are reduced to 3'-6" AFF on walls and 7'-0" on columns. Replace APTW-1, APTF-1 and APTF-2 with alternate tile in 09 30 00. Alternates Required Unit Prices Amount per cubic yard for machine excavation of soil including loading and legal disposal. CONTRACTOR Scherrer Absolute Reichel JH Hassinger Peter Schwabe Unit Price No. 2 $ 23.00 $ 35.00 $ 41.00 $ 59.00 $ 29.50 Unit Price No. 3 $ - $ 20.00 $ 27.00 $ 46.00 $ 42.00 Unit Price No. 4 $ 58.15 $ 24.00 $ 40.00 $ 54.00 $ 51.00 Unit Price No. 5 $ 58.15 $ 42.00 $ 40.00 $ 65.00 $ 62.00 Unit Price No. 6 $ 2,018.00 $ 5,500.00 $ 1,800.00 $ 3,800.00 $ 972.00 Unit Price No. 7 $ 6.90 $ 6.00 $ 0.25 $ 7.00 $ 5.00 Steel $ 9,000.00 $ 9,000.00 $ 4,700.00 $ 6,500.00 $ - Reinforcing Steel $ 1,009.00 $ 2,560.00 $ 900.00 $ 1,700.00 $ - Council Chambers Signage $ 8,000.00 $ 8,000.00 $ 8,000.00 $ 8,000.00 $ 8,000.00 Undercuting $ 22,097.00 $ 20,520.00 $ 15,600.00 $ 18,468.00 $ - Overexcavation $ 125,950.00 $ 166,400.00 $ 130,000.00 $ 154,650.00 $ - Temporary Heating $ 35,000.00 $ 35,000.00 $ 35,000.00 $ 35,000.00 $ 35,000.00 Cost of $35,000 for providing temporary heat per 01 50 00, 1.15. Cost per square foot for installation of moisture mitigation system on concrete floors scheduled to receive a finish floor covering. Cost of furnishing and installing 1000 lbs. of reinforcing steel in addition to that indicated or specified to be used as directed by Architect. Cost of $8,000 to provide aluminum graphics signage at east wall of Council Chambers C115. Include in Base Bid, an allowance for all labor, equipment, and materials required for undercuts totaling 380 cubic yards (15% of the proposed pavement areas). (Undercutting method and materials as described within specification section 31 05 00 – Common Work results for Earthwork - Outside Building Footprint). Allowance shall be equal to the undercutting unit price provided times the quantity stated here. For approved quantities in excess of the Undercutting allowance, the actual undercutting cost will be paid in accordance with the required Undercutting unit price. Any unused portion of the allowance shall be refunded to the owner as a credit at the end of the project. Allowance for over excavation of soils and placement of engineered fill. See plan note on sheet S1.0 for description. Amount per cubic yard to furnish and place approved structural fill material from outside sources, including machine compaction, in lieu of unsuitable on-site material which is to be removed from site. Amount per cubic yard to furnish approved fill material from on-site sources, including machine compaction, in lieu of unsuitable on-site material which is to be removed from site. Amount per cubic yard to furnish and place approved common fill material from outside sources, including machine compaction, in lieu of unsuitable on-site material which is to be removed from site. Cost per Cubic Yard for Undercutting (as defined in 31 05 00 - Common Work Results for Earthwork (Outside Building Footprint) specifications, including removal and replacement). Cost per ton for reinforcing steel in place. This unit price will be used to determine adjustments to the reinforcing steel allowance. Cost of furnishing and erecting 3000 lbs. of steel in addition to that indicated or specified to be used as directed by Architect. Required Allowances Substitute bids