Loading...
CCR2014102-St Andrews COMMON COUNCIL - CITY OF MUSKEGO RESOLUTION #102-2014 DEDICATION AND ACCEPTANCE OF PUBLIC IMPROVEMENTS IN AND FOR ST. ANDREWS VILLAGE PHASE I AND II AND RELEASE OF CASH DEPOSIT WHEREAS, Muskego St. Andrews LLC, hereafter called “DEVELOPER” has constructed public improvements which include sanitary sewer, water mains, and storm sewer facilities, including any and all equipment and appurtenances in and for St. Andrews Village Phase I and II; and WHEREAS, the DEVELOPER has completed the construction and installation of the following improvements: Sanitary Sewer 10 LF at $ 71.30/LF of 8” Sanitary Sewer (Slurry) 950 LF at $ 50/LF of 8” Sanitary Sewer (Gavel) 525 LF at $ 30/LF of 6” Sanitary Laterals (13) 8 EACH at $ 2,101.50/EACH of 48” Sanitary Manholes 10 LF at $ 85/LF of 8” Sanitary Sewer (Slurry) 305 LF at $ 65/LF of 8” Sanitary Sewer (Gravel) 210 LF at $ 55/LF of 6” Sanitary Laterals (4) 2 EACH at $ 2,897.50/EACH of 48” Sanitary Manholes 12 LF at $ 80/LF of 8” Sanitary Sewer (Slurry) 1,032 LF at $ 60/LF of 8” Sanitary Sewer (Gravel) 424 LF at $ 45/LF of 6” Sanitary Laterals (7) 5 EACH at $ 1,329.20/EACH of 48” Sanitary Manholes Water Main 985 LF at $ 35/LF of 8” Watermain (Gravel) 31 LF at $ 30/LF of 8” Watermain (Spoil) 33 LF at $ 65/LF of 6” Hydrant Leads 586 LF at $ 45/LF of 1-1/4” Water Service (13) 4 EACH at $ 1,500.50/EACH of Hydrant W/Valve & Box 5 EACH at $ 802/EACH of 8” Butterfly Valve & box 309 LF at $ 37/LF of 8” Watermain (Gravel) 10 LF at $ 65/LF of 6” Hydrant Leads (1) 229 EACH at $ 50/EACH of 1-1/4” Water Service (4) 1 EACH at $ 1,826/EACH of Hydrant w/Valve & Box 2 EACH at $ 800/EACH of 8” Butterfly Valve & box 1,056 LF at $ 40/LF of 8” Watermain (Gravel) 17 LF at $ 60/LF of 6” Hydrant Leads (2) 402 EACH at $ 35/EACH of 1-1/4” Water Service (7) Reso. #102-2014 Page 2 3 EACH at $ 1,500/EACH of Hydrant w/Valve & Box 2 EACH at $ 616/EACH of 8” Butterfly Valve & Box 58 LF at $ 300/LF of 12” Watermain w/24” Casing 795 LF at $ 90/LF of 12” Watermain (Spoil) 23 LF at $ 80/LF of 6” Hydrant Leads (3) 3 EACH at $ 2,800/EACH of Hydrants w/Valve & Box 2 EACH at $ 847.50/EACH of 12” Butterfly Valves w/Box 265 LF at $ 65/LF of 12” Watermain (Gravel) 1,153 LF at $ 55/LF of 12” Watermain (Spoil) 22 LF at $ 82/LF of 6” Hydrant Leads (3) 3 EACH at $ 1,100/EACH of Hydrants w/Valve & Box 7 EACH at $ 384.50/EACH of 12” Butterfly Valves w/Box Storm Sewer 395 LF at $ 35/LF of 12” Storm Sewer (Gravel) 131 LF at $ 40/LF of 15” Storm Sewer (Gravel) 310 LF at $ 45/LF of 18” Storm Sewer (Gravel) 399 LF at $ 50/LF of 24” Storm Sewer (Spoil) 628 LF at $ 25/LF of 6” PVC Sump Lines 355 LF at $ 30/LF of 4” Storm Laterals (13) 7 EACH at $ 1,000/EACH of Storm Manholes 16 EACH at $ 725/EACH of Storm Inlets 5 EACH at $ 450/EACH of Sump Cleanouts 1 EACH at $ 459/EACH of 15” End Section 1 EACH at $ 400/EACH of 12” End Section 70 LF at $ 30/LF of 12” Storm Sewer (Gravel) 396 LF at $ 25/LF of 6” Sump Lines 118 LF at $ 30/LF of 6” Storm Laterals (4) 4 EACH at $ 500/EACH of Storm Inlets 3 EACH at $ 510/EACH of Sump Cleanouts 2 EACH at $ 456.50/EACH of 12” End Sections 103 LF at $ 30/LF of 12” Storm Sewer (Gravel) 195 LF at $ 45/LF of 12” Storm Sewer (Spoil) 200 LF at $ 52/LF of 15” Storm Sewer (Spoil) 24 LF at $ 65/LF of 27” Storm Sewer (Gravel) 936 LF at $ 25/LF of 6” Sump Lines 211 LF at $ 30/LF of 6” Storm Laterals (7) 3 EACH at $ 1,000/EACH of Storm Manholes 6 EACH at $ 500/EACH of Storm Inlets 6 EACH at $ 510/EACH of Storm Cleanouts 4 EACH at $ 450/EACH of 12” End Sections 1 EACH at $ 500/EACH of 15” End Sections and appurtenances (collectively called “IMPROVEMENTS”) in accordance with the provision of Chapter 18 of the Municipal Code of the City of Muskego, hereafter called the “CITY”, and the City Engineer has certified the systems’ acceptability; and Reso. #102-2014 Page 3 WHEREAS, it is the Developer’s intent to, without charge to the CITY, unconditionally give, grant, convey and fully dedicate the IMPROVEMENTS to the CITY, free and clear of all encumbrances, and together with mains, conduits, pipes, plants, machinery, equipment and appurtenances which relate directly to the utilization of such IMPROVEMENTS; and WHEREAS, the DEVELOPER shall guarantee the public improvements to be dedicated against any defects due to faulty materials or workmanship which appear within a period of one (1) year from the date of dedication and shall pay for any damages resulting therefrom to the CITY property and shall indemnify the CITY against any claims, suits, or liabilities brought against the CITY at any time arising out of the alleged defects or other failure of this guarantee; and WHEREAS, the City Engineer has recommended a full release of the cash deposit in the amount of $171,494.00 minus $2,000.00 which will be held to pay final invoices and any balance returned after all have been paid; and NOW, THEREFORE, BE IT RESOLVED That the Common Council of the City of Muskego, upon the recommendation of the Finance Committee, does hereby accept dedication and acceptance of the public improvements within St. Andrews Village Phase I & II and authorize a release of the cash deposit with $2,000 to be held by the City until all invoices are paid. TH DATED THIS ___9 ___ DAY of DECEMBER , 2014 SPONSORED BY: FINANCE COMMITTEE This is to certify that this is a true and accurate copy of Resolution #102-2014 which was adopted by the Common Council of the City of Muskego. ______________________________ Clerk-Treasurer 11/14jmb