PCR2005100RESOLUTION #P.C.100-2005
APPROVAL OF AN AMENDED CONCEPTUAL BUILDING SITE AND OPERATION PLAN FOR
MUSKEGO LAKES COUNTRY CLUB IN
THE SE ¼ OF SECTION 26 (TAX KEY NO. 2261.978.001 / STH 36)
WHEREAS, On August 2, 2005 plans were submitted by the Muskego Lakes Corporation for an
amendment to a Conceptual Building, Site and Operation Plan for the Muskego Lakes Country
Club located in the SE ¼ of Section 26 (Tax Key No. 2261.978.001 / STH 36), and
WHEREAS, On June 7, 2005 under Resolution #P.C. 021-2005, a Conceptual Building, Site and
Operation Plan was approved by the Plan Commission for this site and since this time the property
owner has requested another conceptual review regarding the same topic, and
WHEREAS, Said property is predominately zoned A, Agricultural District, and said use is a
permitted use by right subject to Building Site and Operation Plan approvals, and
WHEREAS, Petitioner proposes to add a storage facility across the parking lot from the clubhouse
along the portion of the property that abuts Stonebridge Subdivision, and
WHEREAS, Storage facilities currently exist on the northern portion of the property, although these
storage facilities will be razed in conjunction with the St. Andrew’s Village Condominium
development, and
WHEREAS, The new structure is proposed to be constructed of hardi-plank siding and architectural
dimensional shingles with colors of tans and browns, and
WHEREAS, The access doors and overhead doors are proposed to face to the south and to the
east (towards Stonebridge Subdivision), and
WHEREAS, The driveway/access to the building is proposed to be gravel and the area surrounding
the rest of the building will be green space, and
WHEREAS, The petitioner has stated that there are willow trees that will screen the building from
the view from the east, and
WHEREAS, The site contains an existing clubhouse that is made of brick siding and cedar shake
roofing.
THEREFORE BE IT RESOLVED, That the Plan Commission approves of an Amended Conceptual
Building, Site and Operation Plan for the Muskego Lakes Country Club located in the SE ¼ of
Section 26 (Tax Key No. 2261.978.001 / STH 36).
BE IT FURTHER RESOLVED, That the proposed storage facility, although principally used for
storage, must be constructed out of 50% masonry product that matches the clubhouse to create a
cohesive site that blends well with the surrounding land uses.
BE IT FURTHER RESOLVED, That the proposed building shall utilize the same colors as on the
clubhouse.
BE IT FURTHER RESOLVED, That the overhead doors should be reconfigured to face away from
the subdivision so noise will not be an issue.
BE IT FURTHER RESOLVED, That some or all of the gravel area may need to be paved to avoid
dust concerns.
BE IT FURTHER RESOLVED, That any outdoor storage or chemical storage must be in defined
storage areas.
BE IT FURTHER RESOLVED, That landscaping and/or berming may be needed to further screen
sight and sound.
BE IT FURTHER RESOLVED, That the Plan Commission will be receptive to screening of the
facility by a landscaped berm and the appropriation of masonry product to key areas on the
structure, however the facility is still subject to the requirements outlined above.
BE IT FURTHER RESOLVED, That a final Building Site and Operation Plan must have a full site
plan, building elevations, and landscape plan as part of the submittal.
BE IT FURTHER RESOLVED, That the final Building Site and Operation Plan must show any
wetlands that may exist in the area.
BE IT FURTHER RESOLVED, That a copy of said plans be kept on file in the Building Department
and that all aspect of this plan as they relate to drainage shall be maintained in perpetuity unless
otherwise authorized by the Plan Commission.
BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution
shall result in the imposition of fines of $100 per day, the initiation of legal action, or both.
BE IT FURTHER RESOLVED, That this approval is granted in concept only and final action is only
an indication of the current intent of the Plan Commission; Final submittals are subject to future
review and consideration by the Plan Commission, municipal committees of jurisdiction, and other
agencies, and approval of final plans is not guaranteed by this action of the Plan Commission.
Plan Commission
City of Muskego
Adopted: August 16, 2005
Defeated:
Deferred:
Introduced: August 16, 2005
ATTEST: Sandi Asti, Recording Secretary