Loading...
PCR2005021aAMENDED RESOLUTION #P.C.021a-2005 APPROVAL OF A CONCEPTUAL AMENDED BUILDING SITE AND OPERATION PLAN FOR MUSKEGO LAKES COUNTRY CLUB IN THE SE ¼ OF SECTION 26 (TAX KEY NO. 2261.978.001/ STH 36) WHEREAS, On January 21, 2005 plans were submitted by the Muskego Lakes Corporation for an amendment to a Building, Site and Operation Plan for the Muskego Lakes Country Club located in the SE ¼ of Section 26 (Tax Key No. 2261.978.001 / STH 36), and WHEREAS, On May 26, 2005 updated plans were submitted reflecting past Plan Commission recommendations, and WHEREAS, Said property is predominately zoned A, Agricultural District, and said use is a permitted use by right subject to Building Site and Operation Plan approvals, and WHEREAS, Petitioner proposes to add a storage facility across the parking lot from the clubhouse along the portion of the property that abuts Stonebridge Subdivision, and WHEREAS, Storage facilities currently exist on the northern portion of the property, although these storage facilities will be razed in conjunction with the St. Andrew’s Village Condominium development, and WHEREAS, The new structure is proposed to be constructed out of brick, a stone cap, steel siding and architectural dimensional shingles roofing with colors of tans and browns, and WHEREAS, The new structure will have white access doors and white overhead doors, and WHEREAS, The access doors and overhead doors are proposed to face to the south and to the east (towards Stonebridge Subdivision), and WHEREAS, The driveway/access to the building is proposed to be gravel, and WHEREAS, The new structure is proposed to be screened by a landscaped berm from the existing subdivision to the east, and WHEREAS, The site contains an existing clubhouse that is made of brick siding and cedar shake roofing. THEREFORE BE IT RESOLVED, That the Plan Commission approves of a conceptual amended Building, Site and Operation Plan for the Muskego Lakes Country Club located in the SE ¼ of Section 26 (Tax Key No. 2261.978.001 / STH 36). BE IT FURTHER RESOLVED, That the proposed storage facility, although principally used for storage, must be constructed out of 50% masonry product that matches the clubhouse to create a cohesive site that blends well with the surrounding land uses. BE IT FURTHER RESOLVED, That the proposed storage facility shall utilize shingled roofing material matching the colors of the clubhouse roofing. BE IT FURTHER RESOLVED, That the proposed building shall utilize the same colors as on the clubhouse. BE IT FURTHER RESOLVED, That the overhead doors should be reconfigured to face away from the subdivision if noise issues will be a problem at inappropriate hours so noise will not be an issue. BE IT FURTHER RESOLVED, That some or all of the gravel area may need to be paved to avoid dust concerns. BE IT FURTHER RESOLVED, That any outdoor storage or chemical storage must be in defined storage areas. BE IT FURTHER RESOLVED, That landscaping and/or berming may be needed to further sight and sound screen. BE IT FURTHER RESOLVED, That the Plan Commission will be receptive to screening of the facility by a landscaped berm and the appropriation of masonry product to key areas on the structure, however the facility is still subject to the requirements outlined above. BE IT FURTHER RESOLVED, That a final Building Site and Operation Plan must have a full site plan, building elevations, and landscape plan as part of the submittal. BE IT FURTHER RESOLVED, That the final Building Site and Operation Plan must show any wetlands that may exist in the area. BE IT FURTHER RESOLVED, That a copy of said plans be kept on file in the Building Department and that all aspect of this plan as they relate to drainage shall be maintained in perpetuity unless otherwise authorized by the Plan Commission. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both. BE IT FURTHER RESOLVED, That this approval is granted in concept only and final action is only an indication of the current intent of the Plan Commission; Final submittals are subject to future review and consideration by the Plan Commission, municipal committees of jurisdiction, and other agencies, and approval of final plans is not guaranteed by this action of the Plan Commission. Plan Commission City of Muskego Adopted: June 7, 2005 Defeated: Deferred: February 15, 2005; March 1, 2005; March 15, 2005; April 19, 2005; May 3, 2005; May 17, 2005 Introduced: February 15, 2005 ATTEST: Sandi Asti, Recording Secretary